ML19271A903

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/80-12 on 800609-12.No Noncompliance Noted
ML19271A903
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/07/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19271A902 List:
References
NUDOCS 8008110114
Download: ML19271A903 (2)


See also: IR 05000369/1980012

Text

'

?

  1. g >RRECy

t

'o

UNITED STATES

8"

' , ,

NUCLEAR REGULATORY COMMISSION

.

$

E

REGION 11

3

o,

'[

101 MARIETTA ST

N.W., SUITE 3100

&

ATLANTA, GEORGIA 30303

In Reply Refer To:

JUL - 71980

RII:GLT

50-369/80-12

Duke Power Company

ATTN:

W. O. Pa rker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by G. L. Troup of this office on June 9

through 12, 1980 of activities authorized by NRC Constructien Permit Nos. CPPR-83

for the McGuire Nuclear Station facility, and to the discussion of our findings

held with W. M. Sample at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Rcom. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,

1

/

.

W

0-

.

. Philip St, r, Chief

,

Fuel Facility and Materials

Safety Branch

Enclosure:

See Page 2

FW

8008110

1

1

i

.

Duke Power Company

-2-

JUL - 71980

.

Enclosure:

Inspection Report No. 50-369/80-12

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

.

-