Forwards IE Insp Repts 50-518/80-07,50-519/80-07, 50-520/80-07 & 50-521/80-07 on 800415-18 & Notice of Violation
ML19271A892
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 05/09/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19271A885 List:
References
NUDOCS 8008110077
Download: ML19271A892 (2)


See also: IR 05000518/1980007

Text

'

.

  1. pn ato

'o

g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

$

E

REGION li

o

'#

101 MARIETTA ST., N.W., SUITE 310o

o

ATLANTA, GEORGIA 3o303

        • +

MAY

9W

In Reply Refer To:

RII:WPK

50-518/80-07

'

50-519/80-07

50-520/80-07

50-521/80-07

Tennessee Valley Authority

ATTN:

.H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by W. P. Kleinsorge of this office on

April 15 through 18, 1980 of activities authorized by NRC Construction Permit-

Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for the Hartsville facility, and

to the discussion of our findings held with R. T. Hatchcote at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection 'repo rt .

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

,

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

,

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In addition to the need for corrective action regarding these specific items of

noncompliance, we are concerned about the implementation of your management

control systems that permitted their occurrence. Consequently, in your reply,

you should describe in particular those actions taken or planned to improve the

effectiveness of your management control systems.

-8008110 C

.

Tennessee Valley Authority

-2-

MR(

9 1980

,

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the informa tion is p roprieta ry , and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

documeat. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

gh.0 \\

mes P. O'Reilly

o

Di ector

Enclosures:

1.

Appendix A, Notice of Vio

'o

2.

Inspection Report Nos. 50-518/80-07

50-519/80-07, 50-520/80-07, and 50-521/80-07

cc w/ encl:

R. T. Hathcote, Project Manager

P. O. Box 2000

Hartsville, TN 37074

J. F. Cox

400 Commerce Street

W10Cl31 C-K

Knoxville, TN 37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

H. N. Culver

249-A HBB

400 Commerce Avenue

Knoxville, TN 37902