ML19270G591
| ML19270G591 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 04/09/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19270G581 | List: |
| References | |
| NUDOCS 7906140142 | |
| Download: ML19270G591 (2) | |
See also: IR 05000370/1979008
Text
.
.
e
UNITED sT ATEs
/g* "800g
NUCLEAR REGULATORY COMMISSION
,0,,
,
REGloN Il
2
o
101 M ARIETTA STRE ET. N.W.
3
r
..
ATLANTA, GEORGI A 30303
4,*****./
APR 0 91979
In Reply Refer To:
RII NE
50-370/79-08
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 33189
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by N. Economos of this office on
March 13-15, 1979, of activities authorized by NRC Construction Permit No.
CPPR-84 for the McGuire 2 facility, and to the discussion of our findings
held with G. W. Grier, III, at the conclusion ot the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
We have examined actionc you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed
report.
Two new unresolved items resulted from this inspection and are discussed in
the enclosed report.
These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
These items and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken
by you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this of fice to withhold such information from public disclosure.
Any
2270
101
790614 0 / M
C
.
g
.
.
APR 0 91979
.
Duke Power Company
-2-
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
f
y,
j
Charles E. Mut'phy, .&tfief
Reactor Construction and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection P,eport No. 50-370/79-08
cc w/ encl:
M. D. McIntosh, Plant Manager
P. O. Box 488
2270
102
Cornelius, NC 28031
J. C. Rogers, Project Manager
McGuire Nuclear Station
P. O. Box 33189
Charlotte, NC 28242