Forwards IE Insp Rept 50-370/79-08 on 790313-15 & Notice of Violation
ML19270G591
Person / Time
Site: Mcguire
Issue date: 04/09/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19270G581 List:
References
NUDOCS 7906140142
Download: ML19270G591 (2)


See also: IR 05000370/1979008

Text

.

.

e

UNITED sT ATEs

/g* "800g

NUCLEAR REGULATORY COMMISSION

,0,,

,

REGloN Il

2

o

101 M ARIETTA STRE ET. N.W.

3

r

..

ATLANTA, GEORGI A 30303

4,*****./

APR 0 91979

In Reply Refer To:

RII NE

50-370/79-08

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by N. Economos of this office on

March 13-15, 1979, of activities authorized by NRC Construction Permit No.

CPPR-84 for the McGuire 2 facility, and to the discussion of our findings

held with G. W. Grier, III, at the conclusion ot the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

We have examined actionc you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

Two new unresolved items resulted from this inspection and are discussed in

the enclosed report.

These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

These items and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken

by you and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this of fice to withhold such information from public disclosure.

Any

2270

101

790614 0 / M

C

.

g

.

.

APR 0 91979

.

Duke Power Company

-2-

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

f

y,

j

Charles E. Mut'phy, .&tfief

Reactor Construction and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection P,eport No. 50-370/79-08

cc w/ encl:

M. D. McIntosh, Plant Manager

P. O. Box 488

2270

102

Cornelius, NC 28031

J. C. Rogers, Project Manager

McGuire Nuclear Station

P. O. Box 33189

Charlotte, NC 28242