ML19270G029
| ML19270G029 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/21/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19270G030 | List: |
| References | |
| NUDOCS 7906010043 | |
| Download: ML19270G029 (2) | |
See also: IR 05000245/1978041
Text
'
, . '
Unti D Ci r.T C '
-
b
!.'UC LE A R REGULATORY
C-
!:3tOfJ
^
O
REGION I
7f
E31 PARK AVENUE
, , -
, .l
s,
KING OF PRUS$1 A, PENNSYLVANI A 19408
"
.....
2 1 E n Did
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTH:
Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Combined Inspection 50-245/78-41 and 50-336/78-23
This refers to the inspection conducted by Mr. J. Shedlosky of this
office on November 6 - December 7,1978, at Millstone Nuclear Power
Station, Units 1 and 2, Waterford, Connecticut, of activities authorized
by NRC License Nos. DPR-21 and DPR-65, and to the discussions of our
findings held by Mr. Shedlosky with Mr. J. Opeka of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied by an
aff Havit executed by the owner of the information, which identifies the
documelt or part sought to be withheld, and which contains a statement
of reasens which addresses with specificity the items which will be
2268 241
7906 0100T3 ' '
'
.
Northeast Nuclear Energy Company
2
,1 J ; 10
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
Additionally, and in accordance with Section 2.790(d) of the NRC's
" Rules of Practice," Part 2, Title 10, Code of Federal Regulations,
documentation of findings of your control and accounting procedures for
safeguarding special nuclear materials and your facility security pro-
cedures are exempt from disclosure; therefore, the pertinent sections of
the inspection report will not_ be placed in the Public Document Room and
will receive limited distribution.
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
[
.O
(El on < Brunner, Chief
-_-
Reactor Operations and Nuclear
Support Branch
Enclosure:
Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-245/78-41 and 50-336/78-38
(Contains 2.790 Information)
cc:
J. F. Opeka, Station Superintendent (w/o Pages 22 and 23 of Rpt)*
D. G. Diedrick, Manager of Quality Assurance (w/o Pages 22 and 23 of Rpt)*
J. R. Himmelwright, Licensing Safeguards Engineer (w/o Pages 22 and 23 of Rpt)*
A. Z. Roisman, Natural Resources Defense Council (w/o Rpt)
- Contains 2.790 Information
2268
242