ML19270F695

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/79-01 on 790102-05.No Noncompliance Noted
ML19270F695
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 01/25/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19270F693 List:
References
NUDOCS 7903080561
Download: ML19270F695 (2)


See also: IR 05000369/1979001

Text

'.

.

O

" 880 0

UNITED STATES

(g

9[o,,

,

NUCLEAR REGULATORY COMMISSION

g

) y,

g

REfelON 11

-

g

101 M ARIETTA sTREFT.N.W.

<

ATLANTA, GEORGI A 3o3o3

o

%

/

JAN 2 51979

In Reply Refer To:

RII:PTB

50-369/79-01

Duke Power Company

Attn: Mr. William O. Farker, Jr.

President, Steam Production

P. O. Box 33189

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Mr. P. T. Burnett of this office

on January 2-5,

1979 of activities authorized by NRC Construction Permit

No. CPPR-83 for the McGuire Unit 1 facility, and to the discussion of our

findings held with Mr. D. J. Rains at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your coutractor) believe to be

proprieta ry, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not bear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

,

700308osti

.

.

.

- _

_

,

b

Duke Power Company

-2-

g79

,g

,

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

g. c.Q

R. C. Lewis, Acting Branch Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-369/79-01

cc w/ encl:

Mr. M. D. McIntosh, Plant Manager

McGuire Nuclear Station

P. O. Box 488

Cornelius, North Carolina 28031

Mr. J. C. Rogers, Project Manager

McGuire Nuclear Station

P. O. Box 33189

Charlotte, North Carolina 28242

,