4 TEXAS 1 TILITIES GENERATING COMInNY 2001 I3f tYAN TOWEf t IDAll.A% TEXAS 7T,2OI February 6, 1979 R. J. G A R Y
' L c;.%.'! : '.ll:'
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76011 50-446 COMAi;CHF PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION EXPANSION JOIflT - DECONTAMINATION ROOM FILE NO. 10110
Dear Mr. Seidle:
On January 10, 1979, we verbally informed your Mr. R. S. Taylor, CPSES Resident Inspector, of a design deficiency with the expansion joint in the Decontamination Roon that we were evaluating as a "potentially" reportable deficiency within the definition of 10 CFR 50.55(e). We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e).
Records supporting these determinations are available for your Inspector's review at the CPSES site.
If you have any further questions, please advise.
Very truly yours,
/
R./J. Gary RJG.dla cc:
NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.