TXX-2952, Notification of Completion of Investigation on Expansion Joint in Decontamination Room.Concludes Matter Is Not Reportable Under 10CFR50.55(e).Supporting Records Available on Site for Inspector Review
| ML19274E879 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/06/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| TXX-2952, NUDOCS 7904280218 | |
| Download: ML19274E879 (1) | |
Text
TEXAS LTil.lTIES GENEft\\ TING CO.\\ll'ANY W all lif t % A N l a sh i it. l
fir. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. fluclear Regulatory Commission Of fice of Inspection and Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket tios. 50-445 Arlington, Texas 76011 50-446 COMAf1CllE PEAK ST[Afi ELECTRIC STATI0fl 1981-83 2300 M'l IflSTALLATI0fl EXPAflSI0ft JOIllT - DEC0llTAMIf!ATI0fl ROOM FILE f0. 10110
Dear Mr. Seidle:
On January 10, 1979, we verhally informed your Mr. R. G. Taylor, CPSES Resident Inspector, of a design deficiency with the expansion joint in the Decontamination Room that we were evaluating as a "potentially" reportable deficiency within the definition of 10 CFR 50.55(e). We have completed our investigation and have concluded that the matter is not repartable under 10 CFR 50.55(e).
Records supporting these determinations are available for your Inspector's review at the CPSES site.
If you have any further questions, please advise.
Very truly yours, Yf&f R./J. Gary /
RJG:dla cc:
flRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. fluclear Regulatory Commission Washington, D. C.
20555 7 904280218