Forwards Insp Repts 50-498/78-17 & 50-499/78-17 on 781205-08 & Notice of Deviation
ML19270F045
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/21/1978
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML17195A451 List:
References
NUDOCS 7901250082
Download: ML19270F045 (2)


See also: IR 05000498/1978017

Text

hiiEL

[pa nrog .

UNITED STATES

' b

.

o

NUCLEAR RFGULATORY COMMISSION

e

' ' '

REGION IV

h ,, ,b - .

G11 RYAN PLAZA DRIVE, SUITE 1000

  • (

f

AR LINGTON, I E X AS 76011

ggm

.#

++***

December 21, 1978

In Reply Refer To:

RIV

Docket tio. 50-498/Rpt. 78-17

50-499/Rpt. 78-17

Houston Lighting and Power Company

ATTN:

Mr. E. A. Turner, Vice President

Power Plant Construction and

Technical Services

Post Office Box 1700

Houston, Texas

77001

Gentlemen:

This refers to the inspection conducted by Messers. W. G. Hubacek and

D. P. Tomlinson of our staff during the period December 5-8,1978, of

activities authorized by NRC Construction Permit Nos. CPPR-128 and

129 for South Texas Project, Units No.1 and 2, and to the discussion

of our findings with Mr. T. D. Stanley and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of the inspection, no items of noncompliance were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified

in paragraph 2 of the enclosed report.

During the inspection, it was found that certain of your activities

appeared to deviate from corr.nitments in the PSAR. This item and ref-

erences to the specific commitments are identified in the enclosed

Notice of Deviation. Please provide us within 30 days, in writing,

with your conments concerning this item, a description of any steps

that have been or will be taken to correct it, a description of any

steps that have been or will be taken te prevent recurrence, and

the date all corrective actions or preventive measures were or will

be completed.

7901250CG 1

g

.

,.

,

Houston Lighting and Power

Company

-2-

December 21, 1978

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If the report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure.

The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

(

f /" k'

I

j

f/fW. C. Seidle, Chief

/

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Deviation

2.

IE Inspection Report No. 50-498/78-17