Text
,50-498/78-17 C
50-499/78-17 Appendix A fl0TICE OF DEVIATION Based on the results of the flRC inspection conducted December 5-8, 1978, it appears that certain of your activities deviate from commitments made in your Preliminary Safety Analysis Report as indicated below:
Reporting of Cadwelder Qualification Inspection and Test Results by Level I Inspector Section 3.8.1.2.4, " Summary of Plant Principal Specifications," of the South Texas Project PSAR states that applicable sections of the ASME-ACI-359 document are included in plant principal specifications in regard to construction techniques, examination and testing.
Article VII-4100 of the ASME-ACI-359 document states that Level II is the minmum level of capability allowed for personnel who report inspection and test results.
Contrary to the above:
Brown & Root Quality Assurance Department Cadwelder Qualification Reports for Cadwelders 42, 43, 47, 48, 49, 50 and 51, which were prepared in August and October 1978, were signed in the " Reported by" block by Level I @ inspectors.
This is a deviation.
7901'25008 1