Forwards IE Insp Repts 50-348/79-38 & 50-364/79-18 on 791106-09.No Noncompliance Noted
ML19269F427
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/29/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19269F423 List:
References
NUDOCS 7912210016
Download: ML19269F427 (2)


See also: IR 05000348/1979038

Text

.

.

o

UNITED STATES

8

%

NUCLEAR REGULATORY COMMISSION

sE

REGION 11

$ g% I

.

0,

[

101 MARIETTA ST., N.W., SUITE 3100

% * *%,/

g

ATLANTA, GEORGIA 30303

NOV 2 91979

In Reply Refer To:

RII:TDG

50-348/79-38

50-364/79-18

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office on

November 6-9,

1979, of activities authorized by NRC License No. NPF-2 and

Constructi,n Permit No. CPPR-86 for the Farley Nuclear Plant facility, and to

the discuss 'on of o 2r findings held with J. A. Mooney at the conclusion of the

,

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item vill be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

2166 069

7 9222 u,

6 /4

.

.

e

htma n

nuv 4 e m7,9

n en

Alabama Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

, 1'-

/f

A

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-348/79-38,

50-364/79-18

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

Vice President-Production

Post Office Box 2614

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

2166 07'0

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Mar.ager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312