Responds to IE Bulletin 79-03 Re ASME SA-312 Type 304 Pipe Mfg by Youngstown Welding & Engineering Co.Pipe Not in Use or Planned for Use
ML19269E894
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/17/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7906290787
Download: ML19269E894 (1)


Text

. v.

ffth SC

'N O m

>/o /

6 g : r..

7 g~

[6

^/d 3 Carolina Powet & LQ5l Egytipany May 17, 1979 9 NAY 22 -a: 46 Mr. James P. O'Reilly, Director United States Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS.1, 2, 3, and 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 RESPONSE TO IE BULLETIN 79-03

Dear Mr. O'Reilly:

In response to your letter of March 12, 1979, Carolina Power & Light Company has investigated the use at the Shearon Harris Nuclear Power Plant (SHNPP) of ASME SA-312, type 304 pipe manufactured by Youngstown Welding and Engineering Company.

The results of the investigation indicate that no ASME SA-312, type 304 or other welded (without filler metal) pipe manufactured by Younstown Weldiag and Engineering Company is in use or planned for use in safety-related systems at the SHNPP project. Therefore, CP&L plans no further action with regard to your letter.

Yours very truly,

>>; a br ENP M. A. McDuffie Senior Vice President Engineering and Construction MAM/tl cc: United Statsa Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.C.

20555 2142 141 7%30 411 Fayettev lie Street

  • O Bcm 1551 e Raleigh. N C 27 02 4~.T,7LDLX 2C:CW*WLLW.,aMT351%~A 7 0062007f7