s Tl 2W5/2
=,
Atrachnent ]
l'.ty.e 'l u t 2 OFFICE OF INSPF.CTION Arm t:*4FORrE'iE*s t B%' SIT 1: l ';".P"CTOR D.iT I." Hi'.h dT Da t e.,4/8/79
.Ilte Oconee Units 1, 2, 3 Inspecter(x)
Bill Cottle_
r:enera! Plant S t a t u s.:
Unit 1 - 100*; Unit 2 - 90%; Unit 3 - 100%;
Hunting condenser tube leak on Unit 2.
~
- 5.
Review of S!ntlar Transients (Irem 2 of IER 79-OiA):
No change from 7 April report.
b.
I:eview,and Revtsten el Oper.s t in.". and Ma in renzoic.
l' roc ed.. re r, (Items.3, 4, 3, 7,
P.,
9, L0 cf TPB 79-03A):
Item 5 - Valve line up verification done en Rx Bldg. Penetration Room ventilation system.
Item 7 - Locks procurbed - securing of valves in progress, c.
F.ev tes ami lianlementation of Chnnees in Contatum.ent T.sola t inn (1 teem 6 1*2B 79-054A):
No change from 7 April report.
i.
ren tn inp..$f Pl:'.nc Personnt i (!!cmn ', 4,
- 1).md plem t/ proc edurer, enanucac) :
No change from 7 April report.
eaes ee 2164 077 79Q6290( P
g~._,
i.._-_
's e>
Ti 2595/2 Atrachment 1 Page 2 of 2 3:00pm 7 April 2.
SUE \\RY Of lGC 1?.9PECTION AU'l iV rTY OURING PrR: ;D_10 Q_0_gn,,_8 Anril 2
"~
(Address Items 1.a thra 2.<l abotc. give othcr ind ependen t / signif ican t effort, identifv shif ts on which ac:1vity was, tono durinr. ;.ust 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
Six operators interviewed on-shif t to determined awareness of THI incident details, recent procedure changes, that automatic activation of ESF are to be overridden, and knowledge of Removal and Restoration procedures not and notification procedures.
(evening, night and day shifts)
Observed control room operations - all three shifts. Observed shift turnover -
evening and night shift.
3.
STATUS OF TNSPFCTOR DISCUSSIONS '41TH FTANT PERSONNEI..
All licenseed personnel are being briefed by NRC prior to shift change; thus far 36 of 51 have been briefed. Provisions have been made to insure that no operator (RO/SRO) relieves shif t without having had NRC briefing.
Also briefing nonllcensed operators with licensed oper.ator.
t DESCRIFTT.Vi GP ;F.NERAL PLANT S*l ATUS (i.e., opera ting power icycl, planned 4
- g changes, scheduled outagen, ESF ouL of service, majo~r maintenanc.e, reportable occurrcnecs, etc.)
Unit 3 refueling outage scheduled May 18, 1979.
2164 078 e
e