| Site: | Fermi |
| Issue date: | 04/19/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML19269E161 | List: |
| References | |
| NUDOCS 7906260592 | |
| Download: ML19269E160 (2) | |
See also: IR 05000341/1979009
Text
-
T
'
$N
,
d
g
UNITED STATES
i
e
t
NUCLEAR REGULATORY COMMISSION
- I
REGloN lli
-
t
799 ROOSEVELT ROAD
GLEN E LLYN, ILLINots 60137
,c.
.....
en
APR 191979
Docket No. 50-341
Detroit Edison Company
ATTN:
Mr. Edward Hines
Assistant Vice President
and Manager Quality
Assurance
2000 Second Avenue
Detroit, MI 48226
Gentlemen:
This refers to the investiga:; ion conducted by Messrs. R. J. Marsh,
K. D. Ward and M. J. Corcoran of this office on January 3 - 4, 1979,
of activities at Fermi 2 authorized by NRC Construction Permit No.
CPPR-87 and to the discussion of our findings with you, Messrs.
W. J. Fahrner, W. Everett and H. A. Walker, and others of the
Fermi 2 project staff at the conclusion of the investigation.
The enclosed copy of our investigation report identifies areas
examined during the investigation. Within these areas, the
investigation consisted of a selective examination of procedures
and representative records, observations and interviews with
personnel.
During this investigation, certain of your activities appeared to
be in noncompliance with NRC requirements, as described in the
enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code
of Federal Regulations. Section 2.201 requires you to submit to
this office within thirty days of your receipt of this notice a
written statement or explanation in reply, including for each item
of noncompliance:
(1) corrective action taken and the results
achieved; (2) corrective action to be taken to avoid further non-
compliance; and (3) the date when full compliance will be achieved.
"g -
In addition to the need for corrective action regarding those
specific items of noncompliance described in Appendix A, please
- -- - ,.
4'
include in your reply those actions taken or planned to assure
that the nondestructive examination services provided in the past
,
,
., y the Materials Assurance Company meet applicable requirements.
b
7906260 N
2134 063
.
.
APR Ig gyg
.
Detroit Edison Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part-2, Title 10, Code of Federal Regulations, a copy of this
letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room, except as follows.
If
the enclosures contain information that you or your contractors
believe to be proprietary, you must apply in writing to this office,
within twenty days of your receipt of this letter, to withhold such
information from public disclosure.
The application must include a
full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
application.
We will gladly discuss any questions you have concerning this
investigation.
Sincerely,
,
\\
2tedL
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Investigation Report
No. 50-341/79-09
cc w/encls:
Central Files
Reproduction Unit NRC 20b
^
Local PDR
Ronald Callen, Michigan Public
Service Commission
Eugene B. Thomas, Jr.,
Attorney
.
.
.
K.
4.
.
.
- .
.
'
2134
064