Forwards IE Insp Rept 50-341/79-09 on 790103-04 & Notice of Violation
ML19269E160
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/19/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19269E161 List:
References
NUDOCS 7906260592
Download: ML19269E160 (2)


See also: IR 05000341/1979009

Text

-

T

'

$N

,

d

g

UNITED STATES

i

e

t

NUCLEAR REGULATORY COMMISSION

  • I

REGloN lli

-

t

799 ROOSEVELT ROAD

GLEN E LLYN, ILLINots 60137

,c.

.....

en

APR 191979

Docket No. 50-341

Detroit Edison Company

ATTN:

Mr. Edward Hines

Assistant Vice President

and Manager Quality

Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the investiga:; ion conducted by Messrs. R. J. Marsh,

K. D. Ward and M. J. Corcoran of this office on January 3 - 4, 1979,

of activities at Fermi 2 authorized by NRC Construction Permit No.

CPPR-87 and to the discussion of our findings with you, Messrs.

W. J. Fahrner, W. Everett and H. A. Walker, and others of the

Fermi 2 project staff at the conclusion of the investigation.

The enclosed copy of our investigation report identifies areas

examined during the investigation. Within these areas, the

investigation consisted of a selective examination of procedures

and representative records, observations and interviews with

personnel.

During this investigation, certain of your activities appeared to

be in noncompliance with NRC requirements, as described in the

enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations. Section 2.201 requires you to submit to

this office within thirty days of your receipt of this notice a

written statement or explanation in reply, including for each item

of noncompliance:

(1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further non-

compliance; and (3) the date when full compliance will be achieved.

"g -

In addition to the need for corrective action regarding those

specific items of noncompliance described in Appendix A, please

-- - ,.

4'

include in your reply those actions taken or planned to assure

that the nondestructive examination services provided in the past

,

,

., y the Materials Assurance Company meet applicable requirements.

b

7906260 N

2134 063

.

.

APR Ig gyg

.

Detroit Edison Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part-2, Title 10, Code of Federal Regulations, a copy of this

letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room, except as follows.

If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this office,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure.

The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this

investigation.

Sincerely,

,

\\

2tedL

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Investigation Report

No. 50-341/79-09

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

^

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr.,

Attorney

.

.

.