Forwards IE Insp Rept 50-346/79-07 on 790409-12 & Notice of Violation
ML19269E140
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/27/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
Shared Package
ML19269E141 List:
References
NUDOCS 7906260571
Download: ML19269E140 (2)


See also: IR 05000346/1979007

Text

r

fs^

,

S.@

f p nacv4,

UNITED STATES

. , -

  • ,

NUCLEAR REGULATORY COMMISSION

f l[,$

h

REGloN 111

gy)i .

GLE N E LLY N, ILLINOIS 60137

j

799 RooSEVE LT ROAD

s .

.....

APR 2 71979

Docket No. 50-346

.

Toledo Edison Company

ATTN:

Mr. James S. Grant

Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. M. D. Riden of this

office on April 9-12, 1979, of activities at Davis-Besse Nuclear

Power Station, Unit 1, authorized by NRC Operating, License No. NPF-3

and to the discussion of our findings with Mr. Wells at the conclu-

sion of the inspection and with Mr. Murray during a telephone

discussion on April 19, 1979.

The enclosed copy of our inspection report identifies areas examined

durirg the inspection.

Within these areas, the inspection consisted

of - selective examination of procedures and representative records,

o',servctions, and interviews with personnel.

'

During tha inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this

office within twenty days of your receipt of this notice a kTitten

statement or explanation in reply, including for each item of non-

compliance: (1) corrective action taken and the results achieved;

(2) corrective action to be taken to avoid further noncompliance;

and (3) 'ne date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in

the NRC's Publ!c Document Room, except as follows.

If the enclo-

sures contain information that you or your contractors believe to be

o

.

2131

292

" 628

F7/

@

.

S

.

APR 2 71979

Toledo Edison Company

-2-

proprietary, you must apply in writing to this of fice, wit _hin twenty

days of your receipt of this letter, to withhold such information

from public disclosure. The application must include a full statement

of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in

the application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

_e.

21-

-

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1. Appendix A, Notice

of Violation

2. IE Inspection Report

No. 50-346/79-07

cc w/encls:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio

Power Siting Commission

2131

293