ML19269D880

From kanterella
Jump to navigation Jump to search
Forwards Renewal Application Info for License R-33
ML19269D880
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 06/13/1979
From: Darmitzel R
GENERAL ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19269D881 List:
References
NUDOCS 7906200273
Download: ML19269D880 (2)


Text

'

" * " ^ " " " " " ' " '

GENER AL h ELECTRIC ENGINEERING GENERAL ELECTRIC COMPANY, P.O. BOX 460, PLEASANTON, CALIFORNIA 94566 D1 VISION June 13, 1979 Mr. H. R. Denton Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C., 20555

[ Atten tion: Operating Reactors Branch 4

SUBJECT:

Nuclear Test Reactor License Renewal

Reference:

License R-33, Docket 50-73 Gentlemen:

The General Electric Company, Vallecitos Nuclear Center (VNC), currently operates the General Electric Nuclear Test Reactor (NTR) pursuant to License R-33 (Ref.). As this license expires on July 21, 1979, General Electric requests that License R-33 be renewed until October 31, 1997. This date was chosen as the original license was issued on October 31, 1957, and this extension period will complete the normal forty-year term of a reactor license.

RENEWAL APPLICATION INFORMATION I. Site Licenses The following licenses have been issued for the VNC site: R-33 (Docket 50-73), TR-1 (Docket 50-70), DPR-1 (Docket 50-18), DR-10 (Docket 50-183),

SNM-960 (Docket 70-754), and 0017-59 (State of California).

II. Financial Information Financial information will be fomarded under separate cover.

III. Filing Fee A check for $20,000.00 is enclosed as required by 10CFR170.22 IV. Environmental Impact Appraisal (EIA) Information EIA infonnation will be fomarded under separate cover.

2251 127 290e2on %73 F

Mr. H. R. Denton June 13, 1979 V. Safety Analysis Report (SAR)

The SAR will be fontarded under separate cover.

VI. Emergency Plans Copies of the sitewide VNC emergency plan are enclosed. The basic plan was approved for use at the General Electric Test Reactor on 7/1/76.

VII. Technical Specifications The Technical $pecifications will be forwarded with the SAR.

VIII. Operator Licenses and Requalification Training Program Operation of the Nuclear Test Reactor (NTR) is restricted to licensed operators. Personnel currently licensed are:

Name Operator License #

M. S. Bartos 50P-2701-1 W. B. Johnson SOP-1272-4 C. E. Leighty 50P-1870-2 G. L. Smith S0P-2702-1 S. R. Thompson 50P-1873-2 H. L. Zahirniak S0P-4048-1 Enclosed are copies of the revised "eactor operator requalification train-ing program. This is a new program. NTR will continue to operate under the current program (submitted 12/7/73) pending its approval.

IX. Physical Security Plan Copies of the physical security plan are enclosed.

To the best of my knowledge and belief, the information contained herein is accurate.

~

^ ~' -~-

OFFICIAL '

r By: I/ O'

,~

vr;'GINlA C. CAS~ 'm * ' "9 Csw%a:t diy NOT^ny rueuc - c,v. o uf, i Irradiation Processing Operation Atwms ce m 1 . .. M Z "'" ' '

Submitted and sworn before me this thirteenth day of June,1979.

b f,,rrdd dutor< t? , Notary Public in and for the County of Alameda State of California.

vcc Encl. 2251 128