ML19269D657

From kanterella
Jump to navigation Jump to search
Forwards LER 79-016/03L-0
Date released: 10/10/2019 Download: ML19269D657


LER 79-016/03L-0 on 790506:during Surveillance Test, Isolator Condenser Isolation Sensor Setpoint a Measured Two Inches of Excess Water.Caused by Instrument Drift in Excess of Design Accuracy.Switch Was Recalibr & Put Back in Svc
ML19269D659
Person / Time
Site: Oyster Creek
Issue date: 06/05/1979
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19269D659 (3)
Forwards LER 79-016/03L-0
ML19269D656
Person / Time
Site: Oyster Creek
Issue date: 06/05/1979
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19269D656 (1)