05000346/LER-1979-014-03, /03L-0:on 790116,during Shutdown,Boric Acid Addition Tanks (Baat) Total Vol 3-1/3% Below Tech Spec 3.1.2.9 Requirements.Caused by Reduced Baat Vol After Completion of Required Testing Followed by RCS Boration

From kanterella
(Redirected from ML19269C877)
Jump to navigation Jump to search
/03L-0:on 790116,during Shutdown,Boric Acid Addition Tanks (Baat) Total Vol 3-1/3% Below Tech Spec 3.1.2.9 Requirements.Caused by Reduced Baat Vol After Completion of Required Testing Followed by RCS Boration
ML19269C877
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1979
From: Marley J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19269C876 List:
References
LER-79-014-03L, LER-79-14-3L, NUDOCS 7902200022
Download: ML19269C877 (3)


LER-1979-014, /03L-0:on 790116,during Shutdown,Boric Acid Addition Tanks (Baat) Total Vol 3-1/3% Below Tech Spec 3.1.2.9 Requirements.Caused by Reduced Baat Vol After Completion of Required Testing Followed by RCS Boration
Event date:
Report date:
3461979014R03 - NRC Website

text

NRC FORM 366 (7 773 LICENSEE EVENT REPORT ONTROL BLOCK: l l

l l

l l

h (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l o l n l o I B l S i l j@l 0 l o l-10 l0 lN lP lF l-l0 l 3 l@l 4l 1l 1l 1 1l@l l

l@

o i 7

8 9 LICENSEE CODE 14 15 LICENSE NUMDEH 25 2ti LICENSE TYPE JO b l LA T 58 l 5 l 0 l - l 0 l 3 ] 4 l 6 @l 0 l 1 l 1 l 6 l 7 l 9 @l0 2 l1 l2 l7 l9 l@

CON'T lolij

,gO T L

R tid 60 EVENT DATE 14 76 REPORT DATE 80 RCE 7

8 60 61 DOCKET NUM8ER EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l o ! 2 l l On 1/16/79 during a unit shutdown, it was discovered that the Boric Acid Addition Tanky (BAAT) total volume was 3-1/3% below that required by Technical Specification 3.1.2.9 l lol3l lThis placed the unit in the Action Statenent of Technical Specification 3.1.2.9, whichl o

4 l requires both BAATs be operable in Modes 1-4.

The unit continued boration of the

]

o 5

l l Reactor Coolant System (RCS) to Cold Shutdown boron concentration and continued its o o g ooldown to Mode 5.

The unit entered Mode 5 at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br /> on 1/17/79, removing the l

o 7

lolaj junit from the Action Statement. There was no danner to the public or unit personnel.

I 80 7

8 9 E (NP-33-79-16)

SEBCOSE COMPONENT CODE SURC D'E SU

^"

'u C#"*'

'S'O E C0Oe l P l C ]@ l A l@ l Bl@ l A l C l C l U1 M l U j@ W@ (_Zj @

o 9 7

8 9

to 11 12 73 18 19 20 REVISloN SEQUENTI AL OCCURRENCE REPORT LER EVENT YE AR REPORT NO.

CODE TYPE No.

@ HgP,g'ROl7l9 g

l0 1l 4l y

[0l3[

l L[

[-j l0l RT

_ 21 22 23 24 26 21 28 29 Ju 31 32 AKEN AC ON OlPLA T i TH O HOURS 22 S 8 iT D FORf U8.

SU PLIE MAN FACT REn O@6@

Z I@

lZ@

l01010 1 lY @

W@

IZl@

IZ IZ F F l@

33 34 35 J6 31 40 el 42 43 44 4/

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS li lo l lThe low BAAT volume was a result of a reduced BAAT volume af ter completion of reqtiired i shutdown.

_j l testing followed by boration of the RCS for unit i i I

LLL2J !

l t i l 31 1 1

ITTT1 1 80 7

8 9 ST US

% POWE R oTHE R S TA TUS DISCOV RY DISCOVEHY DESCRIPTION W@

01010 hl NA l

l B l@l Surveillance test review l

i s

A TIVITY CO TENT LOCA TION OF RELEASE RELEASED OF RE LE ASE AMOUNT OF ACTIVITY Zl@ lZl l NA l

l NA i 6 80 i

8 9 10 11 44 45 PERSONNEL E XPOSunES NUMRT R TYPE DESCRIPTION -

l l0 l0 l0 lZ l NA i 7 PtnSONNE L iN;uWiES DEScninON@

l Numn li la l 1010 0l@l NA T

8 9 11 12 LO% OF 00 DA*.' AGE TO T ACILITY l

tvPE OLKluellON l Z lhl NA i

8 9 to NRC USF ONLY n.c no, h kid b ".3 nA 7 9 0 220_0m2 A I

L1 ! 1 I ' I i ' ! LLJ w.n w

419-259-5000 Ext. U6 DVR 79-019 Jin Mariey g m, p,3 g, g

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-16_

DATE OF EVENT: January 16, 1979 FACILITY: 7 avis-Besse Unit 1 Volume in boric acid addition tanks below Technical IDENTIFICATION OF OCCURRENCE:

Specification minimum requirement The unit was in Mode 3, with Power (MWT) = 0, and Conditions Prior to Occurrence:

Load (Gross MWE) = 0.

During the perf ormance and review of ST 5032.02, " Boric Description of Occurrence:

on January 16 1979 at Acid Addition Tank (BAAT) Concentration and Volume Test" 3

the combined volume of the BAATs was below the 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, it was discovered that minimum volume required for the operability of the Boric Acid Addition System per10,667 Technical Specificc. tion 3.1.2.9.

The volume of BAAT 1-1 was 4450 gallons at 10,923 ppm, giving a combined total volume of ppm and BAAT 1-2 was 1350 gallons at 5800 gallons which is 200 gallons below the Technical Specification requirement of 6000 gallons.

Technical Specification 3.1.2.9 requires both the Boric Acid Addition System and If the Boric Acid Addition Borated Water Storage Tank be operable in Modes 1-4.be restored to operable status within 72 the system must System is inoperable, least Hot Standby and borated to a shutdown margin equivalent to 1%

or be in at 21 k/k at 2000F within the next six hours. The Boric Acid Addition System must be within restored to operable status within the next seven days or be in Cold Shutdown the next thirty hours.

the time the Boric Acid Addition System was found inopera-The unit was in Mode 3 at The unit continued its ble, and was proceeding to Mode 5 f or required maintenance. System (RCS) to Cold S boration of the Reactor Coolant The unit entered Mode 5 at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br /> on and continued its cooldown to Mode 5.

thus removing the unit from the Action Statenent of Technical January 17, 1979, Specification 3.1.2.9.

Designation of Apparent Cause of Occurrence:

The apparent cause of the occurrence was the intentional entry into the Action Statement of Technical Specification 3.1.2.9 by the reduction of the BAAT's combined volume below the Technical Speci-fication requirements in order to borate the RCS to Cold Shutdown boron concentration for the planned unit shutdown.

the unit had recently concluded required operational

shutdown, Prior to the unit testing which resul.ed in an abnormally high usage of boric acid, thus reducing the available supply of boric acid in the BAAT's.

LER #79-014

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-16 PAGE 2 Analysis of Occurrence:

There was no danger to the health and safety of the public or to unit personnel.

If needed, the Borated Water Storage Tank was available to introduce suf ficient negative reactivity to provide a cold shutdown margin of 1%

/lk/k.

Corrective Action

The operability of the Borated Water Storage Tank was verified on ST 5099.01 on January 16, 1979 at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />, which assured compliance with the Action Statement of Technical Specification 3.1.2.9.

The unit continued with its planned cooldown to Mode 5.

Once in Mode 5, the unit was removed from the Action Statement of Technical Specification 3.1.2.9.

Failure Data: There have been no previously reported similar occurrences.

LER #79-014