| Site: | Yankee Rowe |
| Issue date: | 08/16/1973 |
| From: | Skovholt D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Heider L YANKEE ATOMIC ELECTRIC CO. |
| References | |
| NUDOCS 8011170880 | |
| Download: ML19264B556 (3) | |
Text
'
DISTRIBUTION Doclnt File AEC PDK RP Reading File Branch Reading File JRBuchanan, ORNL
@G 10 N TBAbernathy, DTIE Docket No. 50-29 DJSkovholt, L:0R RLTedesco, L:CS ACRS (16)
R0 (3)
Yankee Atomic Electric Company OGC ATTN:
Mr. L. H. Heidar RJSchemel, L:0RB#1 Manager of Operations TJCarter, L:0R 20 Turnpika Road NDube, L:0PS Westboro, Massachusetts 01581 MJinks, DRA (4)
_ Change No. 109 Gentlemen:
License No. DPR-3 In response to our latter dated June 20, 1973, your letter dated July 17, 1973, provided additional information on minha shif t crew staffing for the Yankee reactor and on the training of contingency personnel that would be required to be holders of AEC Ife=n=es.
We have completed our review of this information and find that with the addition of one other " Auxiliary Operator" for the condition of "Nor=al Operation," as reflected in the revised Tabla 5.1.2 attached to your letter, Yankee conforms with regulatory.:idance for wint== shif t crew staffing for single unit stations. We also find that Tankee's training program for con-tingency personnel that are holders of AEC licenses is acceptable.
During our review of Yankee's minimum shift crew staffing, we informed you that we were incorporating your revised Tabla 5.1.2 in the Technical Speci-fications appended to License No. DPR-3 for the Yankee reactor and that this action would be designated as Change Eo. 109.
We have concluded that operation of the Tankee reactor with the minimum shift crew staffing specified in Table 3.1.2 does not involve a significant hazards consideration and that the health and safety of the public will not be endangered. Accordingly, pursuant to Section 50.59 of 10 CFR Part 50, khe attached Tabis 5.1.2 is added to the Tu haia =1 Specifications.
Sincerely, ABurger, L:0RB#1 Original signed by SATeets, L:0RB#1 Donald J. Skovholt SRari, L:RP PCollins, L:0LB Donald J. Skovbolt BScharf, DRA (15)
Assistaat Director for E uston, L:0SB Operating Easetors RVanNeil, L:0SB Directorats of Licensing
_"*1***"*.
FOR PREVIOUS CONCURRENCES SEE ATTACHED YELLOW I
b emer > _L i.0.RB# 1__ _{ i L: 0RB#1 DJSkhv{ho,lt_ _
L:0RB#1 L:0R x-7434
,1f C.
ABurger:d_c[. SAT q5 RJ_Schymel_.
sunaut >
8/. /73_
k8/13/7_3 8/13/73 8/d/73__ _
o4rt > i N,m uc-m an u n u ot o2.o
.u-i -me-i u s-c.
DISTRIBUTION Docket File AEC PDR RP Reading File Branch Reading File JRBuchanan TBAbernathy DJSkovholt RLTedesco Docket No. 50-29 ACRS (16)
R0 (3) ocC Yantes Atomic Electric Company RJSchemel Al"D :
Mr. L. H. Haider
' TJCarter Manager of Operations NDDue 20 Turnpika Road MJinks (4)
Westbors., Maasmehnaates 01581 Change No. 109 Gentisman:
License No. DFR-3 In response to our letter dated June 20, 1973 your letter dated July 17,
'~
1973, prov1ded additional information on mis;1 mum shif t crew scaffing for the Yankaa reactor and on the training of c6ntingency personnel that would be required to be holders of AEC license We have completed our revisw of this in'i'ormation and find that with the addition of one other " Auxiliary Operator" for the condition of "Nor=al Operation" in the revised Table 5.1/2, attached to your letter. Yankee conformswithregulatoryguidance[ Yankee'strainingprogramforcontingency r mini =t=
shift crew staffing for single unit stations. We also find that
~ personnel that are holders of AEC licenses is acceptable.
/
During our review of Yankme'4 minimum shif t crew staffing, we informed you that we vers incorporatingj four revised Table 5.1.2 in th Technical Speci-fications appended to License No. DPR-3 for the Yankera ranctor and that this action would be designat$d as Change No.109.
/
We have concluded that operation of the Yankee reactor with the rin4 = shift crew staffing specified in Table 5.1.2 does not involve a significant harards consideration and,Ihat the health and safety of the public will not be endangered. Accordingly, pursuant to Section 50.59 of 10 CFR Part 50, the attached Tabis
.l.2 is added to the Technical Specifications.
Sincerely, ABurger SATeets SKari
/
PCollins BScharf (15)
Donald J. Skovholt RHouston, RVanNeil Assistae Director for Operating 7.-=ctors Directorate of Licensing Fuual negre Tabla 5.1.2 omet>
.L:0RB/!.l.......bL:.0RS#1 L:0E.3fL L....L:.03.........
l x-7434 l+ ')
,r
,Q
. sap (mtsi' suemr >
. AEurge rid c_.
E.ISchemel...
_ DJSiovhe.1t..
om.
8/13/71 I 8/ 3 D3.._...J.81S111
. l. 8.!. ].71..
I 4
iem uc.u.
- 9.m uca n.o
--1,4.o.,
~
T TABLE 5.1.2 Yankee Plant staff positions that shall be filled by personnel holding Senior Operator and Reactor Operator licenses.
, Title Operations Supervisor Senior Operator Shift Supervisor Senior Operator Reactor Operator (A)
Control Room Cperator A) Personnel in these positions shall hold either license.
Conditions MINIMUM SHIFT CREW PERSONNEL 6 LICENSE Normal Plant Cold REOUIREMENTS Operation Startup Shutdown Shift Supervisor (1)
(1)
(1)
Control Room Jperator (2)
(2)
(1)
Auxiliary Operator (2)
(2)
(1)
(1)
Extra Operator Senior Operator License (1)
(1)
(1)
Reactor Operator License (2)
(2)
(1)
Normal operation crew requirements shall suffice for a plant restart within four hours from an unscheduled shutdewn for which the cause has been clearly established, Personnel of higher classification or license will also satisfy requirements.
Change No. 109 August 16, 1973