ML19263F413

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/79-43 & 50-364/79-21 on 791205-07.No Noncompliance Noted
ML19263F413
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/31/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19263F391 List:
References
NUDOCS 8001280173
Download: ML19263F413 (2)


See also: IR 05000348/1979043

Text

.

.

/

o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

o

{

E

REGION 11

3'#

6

o

101 MARIETTA ST N.W SUITE 3100

ATLANTA, GEORGIA 30303

o

DEC 311975

In Reply Refer To:

RII:MDH

50-348/79-43

50-364/79-21

.

Alabama Power Company

ATTN:

F. L. Claytoc, Jr.

Senior Vice President

P.

O'. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on

December 5-7, 1979 of activities authorized by NRC License No. NPF-2 and

Construction Permit No. CPPR-86 for the Farley Nuclear Plant facility, and to

the discussion of our findings held with J. A. Mooney at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information fra public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the applicatior. is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

1817

094

8001280

f

-w+

e--

-

e

ee

W

.

.

.

s

DEC 31 rg79

Alabama Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/Qurphy,

. E.

ief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-348/79-43

and 50-364/79-21

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

Vice President-Production

Post Office Box 2614

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

,

QA Supervisor

P. O. Box U

Ashford, AL 36312

1817

09Ei

.