UNITED STATES
8
0
NUCLEAR REGULATORY COMMISSION
4
[
REGION IV
o
_E
611 RYAN PLAZA DHIVE, SUITE 1000
7
',
- e
ARLINGTON, TEXAS 76011
,
5
% .%)
,p
....
April 11,1979
In Reply Refer To:
RIV
Docket No. 50-498/Rpt. 79-04
50-499/Rpt. 79-04
Houston Lighting and Power Company
ATTN: Mr. E, A. Turner, Vice President
Power Plant Construction and
Technical Services
Post Office Bcx 1700
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Mr. M. G. Hubacek and other
members of our strif during the period March 20-23, 1979, of actit' ties
authorized by NRL Construction Permit Nos. CPPR-128 and 129 for SGJth
Texas Project, Units No. 1 and 2, and to the discussion of our findings
with T. D. Starley and other members of your staff at the conclusion
of the inspevion.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection con-
sisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with Appendix B to 10 CFR 50 of
the NRC Regulations, " Quality Assurance Criteria for Nuclear Power
Plants." The item of noncompliance and references to the pertinent
requirements are identified in the enclosed Notice of Violation.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified
in paragraph 2 of the enclosed report.
2217
s50
"
79062500 W
Q
' Houston 1.ighting and Power
Company
-2_
April 11,1979
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you tc submit to this office, within
30 days of your receipt of this notice, a written statement or explanation
in reply including: (1) corrective steps which have been taken by you,
and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will
be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of thas letter and the
enclosed inspection report will be placed in the NRC's, Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office, within ?0 days of the date of this letter, requesting that
such information be withheld from public disclosure.
The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enc 1 cure will also
be placed in the Public Document Room.
If we do not he.r from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
.
Sincerely,
m_
-
W. C. Seidle, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
~
2.
IE Inspection Report No. 50-498/79-04
50-499/79-04