ML19263E532

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-13, Indication of Low Water Level in Oyster Creek Reactor
ML19263E532
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/29/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 7906200049
Download: ML19263E532 (1)


Text

k

((3l*1

  1. ga o c.<,4'q, t Nn Eo sT A1Es 79' NUr _E AR REGULATORY COMMISSION 8 N.b ' ' d!b ' %

,5 3

HEGION V

7.,, s; ~.,$

uv,o n. cAuronNI A BOUL EVARD 4

StliT E 202, V.'Alf;UT CC E L K Pt AZ A

1., )

I'g y

O 4,,,+

WALfJU T CflEE K, Cf.LIFO!;ill A Ot. LOG iday 29, 1979 Docket !!os. 50-528 50-529 50-530 Arizona Public Service Company P. O. Box 21666 Phoenix, Arizona 85036 Attention:

fir. E. E. Van Brunt, Jr.

Vice President, Construction Projects Gentlemen:

This Information Notice is provided as an early notification of a possibly significant uatter.

It is expected that recipients will review the information for possible applicability to their facilities.

flo specific action er response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recomend or request specific licensee actions.

If you have questions regarding the raatter, please contact the Director of the appropriate flRC Regional Office.

Sincerely, 7

-,/

sp/4

,.I n

'nTi*/

irector

Enclosure:

IE Inforiaation liotice No. 79-13 cc w/ enclosures:

F. W. Hartley, APS 288 236 79062000%

s V1ITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION Arid ENFORCEMENT WASHINGTON, D.C.

20555 May 29, 1979 IE Information Notice No. 79-13 INDICATION OF LOW UATER LEVEL IN THE OYSTER CREEK REACTOR Summary A loss of feedwater transient at the Oyster Creek facility on May 2, 1979, resulted in a significant reduction in water inventory within the reactor core shroud area as measured by one set of water level instruments (triple low level), while the remaining level instruments, sensing from the reactor annulus area indicated water levels above any protective feature setpoint (Figure 1).

The water level within the core shroud area was reduced below the " triple low level" setpoint of 4-feet, 8-inches above the top of the fuel.

Subsequent analysis by the licensee has determined that the minimum collapsed water level (solid, without steam voids) over the top of the fuel was 1 to 1-1/2 feet.

Coolant sample analyses and offgas release rates indicate that no fuel damage occurred.

General Oyster Creek is a non-jet pump BWR with licensed power of 1930 MWt.

The plant was first made critical May 3, 1969.

Status Before Transient Operating at near full power with the main parameters at levels as follows:

1895 MWt power level 79" Yarway (13'4" over top of fuel) reactor water level 1020pgigreactorpressure 7.1x10 5!/nr feed flow 4

14.8x10 gpm recirculation flow rate (4 pumps)gg ]J 12 psid core 4 p Equipment Out of Service (DOS)_ "D" recirc pump 00S due to se "B" startup transformer 005 f DUPLICATE DOCUMENT Entire document previously entered into system under: ,k.-6 f)d b ANO - r[ [ f No. of pages: ..}}