ML19263E522
| ML19263E522 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 05/09/1979 |
| From: | Dail L DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| P81-1412-11.1, NUDOCS 7906200027 | |
| Download: ML19263E522 (1) | |
Text
Y0 gpAW DUKE POWER CO31PANY
['78 N
ELECTitIC CENTElt. HOX 33180, CII Altl.orrE. N. C.
28242
~
,,;l;; ;; g=A n,
May 9, 1979 Og
,j L. C. DAIL
~
=x E
' 'm 3
. Cl C
--5 Mr. J. P. O'Reilly, Director r
U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 g
Atlanta, Georgia 30303 Re: Cherokee Nuclear Station IE:II:JRH y
Inspection Report:
50 491, 492, 493/78-8 Response to C. E. Murphy's April 13, 1979 Letter Duke File:
P81-1412-ll.1
Dear Mr. O'Reilly:
In response to Mr. Murphy's letter of April 13, 1979, Duke Power will commit to placing the sieves used for soil and concrete aggregate tests in the regular calibration program for control of measuring and test equipment. The initial acceptance of the sieves and their periodic calibration will be done in accordance with Section 17.1.12 of the Duke-1 Topical Report - Quality Assurance Program.
This program will be implemented no later than July 1,1979.
Very truly yours,
'/
2288 229 L. C. Dail Vice President Design Engineering
/
JDW/jmf i
7906200027
' ) ] O O b'/
a HCIAL COPY
,