| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19263E454 | List: |
| References | |
| 219, NUDOCS 7906180312 | |
| Download: ML19263E455 (2) | |
Text
.......
- - - ~
~
VIRGINIA ELecraIC AND Powna CourANY H a czm own,Vs morn :A sos 6I nga25 A8: 55 April 23,.1979 Mr. James P. O'Reilly, Director Serial No.
219 Of fice of Inspection and Enforcement P0/FET:scj U. S. Nuclear Regulatory Coc: mission Docket Nos. 50-333 50-339 kegion II 101 Marietta Street, Suite 3100 License Nos. NPF-4 Atlanta, Georgia 30303 CPPR-78
Dear Mr. O'Reilly:
We have reviewed your letter of March 29, 1979, in reference t.o the inspection conducted at North Anna Power Station Unit Nos. I and 2 on February 5 to March 2, 1979, and reported in I.E. Inspection Report Nos.
50-338/79-09 and 50-339/79-)4. Our response to the specific infraction is attached.
We have determined that no prcprietary information is contained in the report. Accordingly, Virginia Electric and Power Company has no objection to this inspection report being made a matter of public disclosure.
Very truly yours,
. [t28< h(j::
2 C. M. Stallings Vice President-Power Supply and Production Operations Attachment cc:
Mr. Albert Schwencer 1000180
/
-n n'
VAb OFFICIAL COPY
....... --....... -. - - ~.-.-- - -.~.- - - -.
RESP 05SE TO NON-COMPLIANCE ITEMS REPORTED IN IE INSPECTION REPORT NOS.
50-338/79-09 and 50-339/79-14 NRC Comment As required by Criterion V of Appendix B to 10 CFR 50 and Section 17.2.5 of your Topical Report for Operations Quality Assurance (VEP-3A),
activities af fecting quality shall be prescribed by documented instruc-tions or procedures and shall be accomplished in accordance with those instructions or procedures.
Station Administrative Precedure 104, Implementation of Architect-Engineer Construction Design Changes Af ter Receipt of Operating License, requires that design change packages be reviewed for completeness and that this review be indicated by affixing the reviewer's signature and date to the A-E Construction Design Change Review Form.
Contrary to the above, Station Administrative Procedure 104.0, was not followed in that the cover form for Construction Design Change, NAl-EC-78-40 was signed to denote completion on December 6, 1978, with Revisions 2, 3, and 4, ta this design change still incomplete.
This is an infraction.
Response
The above infraction is correct as stated.
Specifically, pursuant to Section 2.201 of the NRC's " Rules of Practice" Part 2 Title 10, Code of Federal Regulations, the following information is submitted:
1.
Corrective steps taken and results achieved:
An investigation into the event was made.
It was determined that the initial ADM 104.0 design change package had been completed, reviewed and processed in accordance with established procedures.
However, field changes to the design change package had been initiated and had not been completed. The field changes were missed since their status is not rtcorded on the ADM 104.0 cover sheet which is attached in the design change package.
To correct this, the completed field change was audited by QC. Upon the completion of their audit, the design change was then processed as complete.
Also, all previously completed ADM 104.0 design changes are being reviewed to assure that they were processed correctly.
2.
Corrective action taken to avoid further non-compliance:
The ADM 104.0 cover sheet is being modified to correct this procedural error.
Spaces vill be added to the cover sheet for j
field changes to be recorded as they are approved.
It will then be to determine what possible, by merely examining the cover sheet, and how many field changes,have been implement ed.
i 3.
Date when full compliagee vill be schieved:
Revision of the ADM 104I0 cover sheets will be completed by May 15, 1979.