ML19263D559

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-508/79-02 on 790206-07. No Noncompliance Noted
ML19263D559
Person / Time
Site: Satsop
Issue date: 03/02/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19263D560 List:
References
NUDOCS 7904130012
Download: ML19263D559 (2)


See also: IR 05000508/1979002

Text

.

jf

%g*

UNITED STATES

h

,0%

NUCLEAR REGULATOnY COMS.11SslON

$.I,h/d,

h

REGION V

b

SulT E 202, W ALNUT C RE EK PLAZ A

S

'

U

  1. %

O

1990 N. C ALIFORNI A BOULEVARO

  • eem*

W ALPJUT CREEK, C AllF ORtJi A 94596

FAR 21979

Docket No. 50-508

Washington Public Power Supply System

P. O. Box 468

Richland, Washington 99352

Attention: Mr. N. O. Strand

Managing Director

Gentlemen:

Subject: NRC Inspection - WNP 3

This refers to the inspection conducted by Messrs. T. W. Hutson and

G. Hernandez of this office on February 6-7, 1979 of activities authorized

by NRC Construction Permit No. CPPR-154 and to the discussion of our

findings held with Mr. J. C. Lockhart and other members of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

t:.a enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

/904.13 CO/%

fMR 2 1979

.

Washington Public Power Supply System

-2-

to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

_.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

J

m4&w

G. S. SpCncer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

No. 50-608/79-02

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

W. J. Talbott, Division Manager, WPPSS