05000336/LER-1979-003, Forwards LER 79-003/03L-0

From kanterella
(Redirected from ML19263C994)
Jump to navigation Jump to search
Forwards LER 79-003/03L-0
ML19263C994
Person / Time
Site: Millstone 
Issue date: 03/16/1979
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19263C995 List:
References
MP-2-3013, NUDOCS 7903200407
Download: ML19263C994 (1)


LER-1979-003, Forwards LER 79-003/03L-0
Event date:
Report date:
3361979003R00 - NRC Website

text

,

s.

I):Ortl'MHJMiT ISTI3.lTEE!i 55555EE!

$[fd"S """"'"""

a

<u=== =: =:

March 16,1979 MP-2-3013 fir. Boyce H. Crier Director, Region I Office of Inspection and Enforcement U. S. ?!uclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License DPR-65 Docket No. 50-336 ReportableOccurrenceR0-50-336/79-03/3L-0

Dear ?!r. Grier:

This letter forwards Licensee Event Report 79-03/3L, required to be submitted within thirty days pursuant to tiillstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b.

The report concerns a dropped control element assembly at power and subsequent operation within the action statements of Specifir'tions 3.1.3.1.e and 3.2.4.

An additional three copies of the report..re enclosed.

Yours truly, W/b

. F. Opeka Station Superintendent Millstone fluclear Power Station JF0/RS/jj Attachment: LER 79-03/31-0 Director, Office of Inspection and Enforceaent, Washington, D.C.

(30) cc:

Director, Office of itanagement Infomation and Program Control, Washington, D.C.

(3) 79032004o7