Forwards IE Insp Rept 50-369/78-41 on 781211-15.No Noncompliance Noted
ML19263C660
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 01/10/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19263C659 List:
References
NUDOCS 7902280451
Download: ML19263C660 (2)


See also: IR 05000369/1978041

Text

.,

UNITED STATES

enarco

,o

NUCLEAR REGULATORY COMMISSION

,.f,( ' g

REGloN 18

'

6

o

$

101 M ARIETT A sTR E ET, N.W.

5*k"*'/

!

ATLANTA, GEORGI A 30303

o

%*..+

In Reply Refer To:

RII WJM

JAN 101979

50-369/78-41

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, Ncrth Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. W. J. Millsap of this

office on December 11-15, 1978, of activities authorized by h3C Construction

Permit No. CPPR-83 for the McGuire Nuclear Station, Unit 1 facility, and

to the discussion of our findings held with Mr. T. L. McConnell at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously

reported unresolved items. The status of these items is discussed in

the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the h3C's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

7902280451

.

.

.

jar,1 01973

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

)(f. Qfht'l

'f h af

S

T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No.

50-369/78-41

cc w/ enc 1:

Mr. M. D. McIntosh, Plant Manager

McGuire Nuclear Station

P. O. Box 488

Cornelius, North Carolina 28031

Mr. J. C. Rogers, Project Manager

McGuire Nuclear Station

P. O. Box 2178