ML19263B972

From kanterella
Jump to navigation Jump to search
Forwards LER 78-072/03L-0
Date released: 10/04/2019 Download: ML19263B972


LER 78-072/03L-0 on 781227:during Normal Testing Sequence of Reactor Bldg Charcoal Filter Bank,Methyl Iodine Removal Efficiency Determined to Be Less than 99% Contrary to Tech Spec 3.6.4.2.Caused by Pollutants Deteriorating Charcoal
ML19263B975
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/17/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263B975 (2)
Forwards LER 78-072/03L-0
ML19263B971
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/19/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263B971 (1)