Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-333/78-21
ML19263B539
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/04/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19263B540 List:
References
NUDOCS 7901180367
Download: ML19263B539 (2)


See also: IR 05000333/1978021

Text

dd

UNITED STATEi

.

p

1

NUCLEAR REGULATORY COMMISSION

., w

5 '.k{s )*( '

431 PARK AVENUE

i

2

neciou s

/

'\\ g

[

KING OF PRUSSI A, PENNSYLVANI A 19406

.....

JAN 4 1979

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

~

ATTN:

Mr. J. D. Leonard

Resident Manager

P. O. Box 41

Lycoming, New York

13093

Gentlemen:

Subject:

Inspection 50-333/76-21

This refers to your letter dated November 20, 1978, in response to our

letter dated October 30, 1978, and to a discussion between the inspector

and Mr. Leonard on site on December 7, 1978, at the conclusion of Inspec-

tion No. 50-333/78-28.

Thank you for informing us of the corrective and preventive actions

documented in your letter.

These actions will be examined during a

subsequent inspection of your licensed program.

Our review of the additional information cn item B indicated that the

controls specified by TS 6.11 (A) 2 were required in that equipment was

accessible in this area and during inspection and servicing the radiation

dose rate to the whole body could exceed 1,000 mrem /hr. Specifically,

your survey record dated September 26, 1978, identified a 1,000 mrem /hr

gamma radiation dose rate at the entrance to the area of the drywell

sump. Subsequent surveys identified up to 20,000 mrem /hr gamma radiation

dose rate at 3 inches from a valve, and several thousand mrad /hr beta

radiation dose rate in thie vicinity.

Sincerely,

/

-

Ge rg

H. Smith, Chief

Fu 1

acility and Materials

fety Branch

7sonso % 7

-

-

.

.

Power Authority of the State of New York

2

.

cc w/ encl:

George T. Berry, General Manager and Chief Engineer

P. W. Lyon, Manager - Nuclear Operations

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Quality Assurance Supervisor

J. F. Davis, Chairman, Safety Review Committee

L. R. Bennett, Assistant General Manager - General Counsel

G. M. Wilverding, Licensing Supervisor