Responds to Violations Noted in IE Insp Repts 50-491/78-08, 50-492/78-08 & 50-493/78-08.Corrective Actions:Stockpile Overflow Cleaned Up,Fire Extinguishers Available in Vault Area & Use of New Fire Protection Sys
ML19263B492
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 12/20/1978
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19263B491 List:
References
NUDOCS 7901180307
Download: ML19263B492 (2)


Text

DUKE POWER COMPANY

'**' 88

GENEllAL OFFICES 3 7.a c$

422 SOUTH CHURCH STREET CII ARLOTTE. N. C. 28242 December 20, 1978 Mr. J. P. O'Reilly, Director p

U. S. Nuclear Regulatory Coninission t

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 c.

Re: Cherokee Nuclear Station IE:II:JKR Inspection Reports:

50-491/78-8, 50-492/78-8, 50-493/78-8 Duke File:

CK-1412.11-1

Dear Mr. O'Reilly:

In your subject inspection reports, you identified two deficiencies and one infraction and requested a report be filed within twenty days of our receipt of the reports.

Duke Power Company's responses to the two deficiencies are attached. The third item is under study; Duke will submit a responte to this infraction by January 15, 1979.

Very truly yours, p

L. C. Dail Vice President Design Engineering JEB/sr Attachment 79011803o7

9 DUKE RESPONSES TO INSPECTION REPORTS 50-491/78-8, 50-492/78-8, 50-493/78-8 A.

DEFICIENCY 491, 492, 493/78-08-01 Aggregate Stockpile Overflow 1.

All spilled aggregate was in the non-recoverable part of the stockpile and was therefore not used. The stockpile overflow has been cleaned up and the stockpile drawn down.

2.

The aggregate ordering policy has been changed to prevent any future over-ordering and stockpile levels will be monitored to assure no overfilling takes place.

3.

All corrective action is complete.

B.

INFRACTION 491, 492, 493/78-08 Seives Duke will file a response to this item by January 15, 1979.

C.

DEFICIENCY 491, 492, 493/78-08 Vault Fire Control 1.

In the interim, hand-held fire extinguishers are available in the vault area which is continually monitored during normal working hours. During other than normal working hours, the fire rated vault is secured, and a continuous security force wiTT initiate fire fighting action should a fire develop.

2.

An appropriate Halon fire protection system is on order.

3.

Barring any shipping delays, the system will be installed and full compliance achieved by March 1,1979.