Forwards IE Insp Repts 50-321/78-41 & 50-366/78-50 on 781120-21 & 1201.No Noncompliance Noted
ML19263B460
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/18/1978
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19263B455 List:
References
NUDOCS 7901180274
Download: ML19263B460 (2)


See also: IR 05000321/1978041

Text

I

<*

pm Rf coq

UNITED STATES

[

g

o

NUCLEAR REGULATORY COMMISSION

.

y

3 .f,

g

R EGloN 11

E

101 M ARIETTA sT R E ET. N.W.

-

-

'

o '

I,

8

ATLANTA. GEORGIA 30303

E

% .' .v

,o

...

In Reply Refer To:

OE C 18 $70

RII:ELC

50-321/78-41

50-366/78-50

Georgia Power Company

ATTN:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N. W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. E. L. Clay of this office on

November 20-21 and December 1,1978, of activities authorized by NRC Operating

License No. DPR-57 and Construction Permit No. CPPR-90 at Hatch Nuclear

Generating Plant and to the discussion of our findings held with Mr. Max Manry

at the conclusion of the inspection.

The area examined during this inspection was your program for safeguarding

special nuclear material under the applicable provisions of Title 10, Code of

Federal Regulations, Part 70, "Special Nuclear Material," and specific require-

ments of the above license Nos. DPR-57 and CPPR-90.

Within this area, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of nonconpliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Par t 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

790HSO27f

o

..

.

.

Georgia Power Company

-2-

U _ C 181970

Should you have any questions concerning this letter, we will be glad to

discuss them vith you.

Sincefely,

'

l

fA df f '

A L

,' / .Tilliam B. Ken a, Chief

Safeguards Bra ch

Enclosure:

Inspection Report Nos. 50-321/78-41

and 50-366/78-50

(Not Exempt)

cc w/ encl:

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513