Text
f % g*g ,.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
-
y
j
j
REGION I
g
631 PARK AVENUE
KING OF PRUSSI A. PENNSYLVANI A 19406
2 4 NOV 1978
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection 50-317/78-32 and 50-318/78-29
This refers to the inspection conducted by Mr. D. Johnson of this office
on November 6-9, 1978, at Calvert Cliffs Nuclear Power Plant, Units 1
and 2, of activities authorized by NRC License No.s. DPR-53 and DPR-69
and to the discussions of our findings held by Mr. Johnson with Mr. L.
Russell of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses wfth specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear frem you in this regard within the specified period, the report
will be placed in the Public Document Room.
79010400/8
g
.
.
.
'
Baltimore Gas and E?.cct.ic
2
2 4 NOV 373
Company
,
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
.
f-
- ,e--
Eldon bf. Brunner, Chief
Reactor Operations and Nuclear
Scpport Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Numbers 50-317/78-32; 50-318/78-29
cc w/ encl:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer-
W. Gibson, General Supervisor, Operational QA
R. C. L. Olson, Senior Engineer