ML19262C471

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/79-21 & 50-414/79-21 on 791113-16.No Noncompliance Noted
ML19262C471
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/12/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19262C468 List:
References
NUDOCS 8002140043
Download: ML19262C471 (2)


See also: IR 05000413/1979021

Text

.

.

pn Rtouq'o

UNITED STATES

  1. '

~g

8

NUCLEAR REGULATORY COMMISSION

-

o

$

$

REGION 11

3

o,

'8

101 MARIETTA ST.. N.W., SUITE 3100

E

o

ATLANTA, GEORGIA 30303

DEC 121979

In Reply Refer To:

RII:CRM

50-413/79-21

50-414/79-21

Duke Power Company

ATTN:

W. O . Pa rki. r , J r .

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this office on

November 13-16, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our

findings held with D. G. Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

,

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Tit 1c

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared

so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

-

-

C. E. Murphy, Chi

Reactor Construct on and Engineering

Support Branch

Enclosure:

See Page 2

8002140 Q f

.

.

.

DE O~ 5 ' 13 7'#

' ' '

Duke Power Company

-2-

.

Enclosure:

Inspection Report Nos. 50-413/79-21

and 50-414/79-21

cc w/ encl:

D. G. Beam, Project Manager

P. O. Box 223

Clover, SC 27910

.

9

%

e

P

a