ML19262C301

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/79-36,50-270/79-33 & 50-287/79-36 on 791101-30.No Noncompliance Noted
ML19262C301
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/27/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19262C302 List:
References
NUDOCS 8002110216
Download: ML19262C301 (2)


See also: IR 05000269/1979036

Text

TKL

'

!(f**%q

Q - M/

jo

UNITED STATES

g

ge

NUCLEAR REGULATORY COMMISSION

,,.,

g

g ),

,e

REGION il

101 MARIETTA ST., N.W.. SUITE 3100

o

g . . . . . p"#

ATLANTA, GEORGIA 303o3

In Reply Refer To:

DEC 2 71979

RII:FJ

50-269/79-36

50-270/79-33

50-287/79-36

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspectica conducted by F. Jape of this office on

November 1-30, 1979, of activities authorized by NRC Operating License Nos.

DPR-38, DPR-47 and DPR-55 for the Oconee facility, and to the discussion of our

findings held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

1947

299

em 2IC

soo

.

2719I3

DEC

Duke Power Company

_2_

-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

f

6dd bdO%

tu

I

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report Nos. 50-269/79-36,

50-270/79-33 and 50-287/79-36

cc w/ encl:

J. E. Smith, Station Manager

P. O. Box 1175

Seneca, SC 29678

.

r947

300