ML19262B579

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-31, Use of Incorrect Amplified Response Spectra. No Written Response Required
ML19262B579
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/13/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
References
NUDOCS 7912280586
Download: ML19262B579 (1)


Text

J

?Ich UNITE D STATES

,/pa kcoq'o NUCLEAR REGULATORY COMMISSION g

a' V i

nactoN IV n

';,C' f*

1 j ARLINGTON, TEXAS 76012

$ l o

611 HYAN PLAZA DRIVE, SUITE 1000 O

%.'.# /y December 13, 1979 In Reply Refer To:

RIV Docket No.

STN 50-482/IE Information Notice No. 79-31 Kansas Gas & Elcetric Co.

Attn: Mr. Glenn L. Koester Vice President-Operations Post Office Box 208 Wichita, Kansas 67201 Gentlemen:

This IE Information Notice ic provided as an early notification of a possibly significant matter.

It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions. If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely,

' Karl V. Seyfr t Director

Enclosures:

1.

IE Information Notice No. 79-31 2.

List of IE Information Notices Recently Issued cc: w/ enclosures Messrs. Nicholas A. Petrick, SNUPPS D. T. McPhee, Kansas City Power and Light Company Gerald Charnoff, Shaw, Pittman, Potts & Trowbridge E. W. Creel, Kansas Gas and Electric Company 1649 335 79122 80 N(

a SSINS: o870 Accession No.:

UNITED STATES 7910250507 NUCLEAR REGULATORY COMMISSION OITICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 79-31 Date: December 13, 1979 Page 1 of 1 USE OF INCORRECT AriPLIFIED RESPONSE SPECTRA (ARS)

Description of Circumstances:

Recently, the NRC was informed that, during a review of valve weights in conjunction with the as-built review for IE Bulletin 79-14 at North Anna Unit 1, it was discovered that incorrect amplified response spectra (ARS) had been used as input to the analyses of some piping on both Units 1 and 2.

The reanalyses are being performed by Stone & Webster (S&W), the Architect Engineer for the Virginia Electric & Power Company's facilities.

Similarly, Public Service Company of New Hampshire informed the NRC that the wrong ARS were used for the design of some containment supports at their Seabrook units. The Architect Engineer for these plants is United Engineers & Constructors (UE&C).

The NRC is currently pursuing this issue in detail with S&W and UE&C to determine the extent of the problem and the generic implications for other facilities.

This Information Notice is provided as an early notification of a possible significant matter.

It is expected that recipients will review the informa-tion for possible applicability to their facilities. Specific action has been requested by IE Bulletin 79-14.

This bulletin requires that input to seismic analyses of piping, which includes the use of the corre-t ARS, be verified against the as-built condition of the plant. No specific actions are requested in response to this Information Notice.

If NRC evaluations so indicate, further licensee actions may be requested or required.

If you have any ques-tions regarding this matter, please contact the Director of the appropriate NRC Regional Office.-

No written response to this IE Information Notice is required.

1649 336

IE Information Notice No. 79-31 December 13, 1979 LISTING OF RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 79-26 Breach of Containment 11/5/79 All power reactor Integrity holding Operating License (0L) and Construction Permits (CP3)79-12A Attempted Damage to New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an Operating License (OL) or Construction Permit (CP) 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures at Two PWR holding Operating Licenses Facilities (OLs) and Construction Permits (cps) 79-28 Overloading of Structural 11/16/79 All power reactor facilities Elements Due to Pipe Support with an Operating License (OL) or Construction Permit (CP) 79-29 Loss of NonSafety-Related 11/16/79 All power reactor facilities Reactor Coolant System holding Operating Licenses Instrumentation During (OLs) or Construction Operating Permits (cps) 79-30 Reporting of Defects and 12/6/79 All power reactor Noncompliances, 10 CFR facilities holding Part 21 Operating Licenses (OLs) and Construction Permits (cps) and vendors inspected by LCVIP Enclosure 16119 3,37

-,