ML19262B523

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/79-36 on 791009-11.No Noncompliance Noted
ML19262B523
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 11/23/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19262B521 List:
References
NUDOCS 7912280163
Download: ML19262B523 (2)


See also: IR 05000369/1979036

Text

.

.

~.

'o

UNITED STATES

!

/n

NUCLEAR REGULATORY COMMISSION

3, )

);E

REGION 11

101 MARIETTA ST., N.W., SUITE 3100

o,

'

ATLANTA, GEORGIA 30303

o

NOV 2 31979

In Reply Refer To:

RII:TJD

50-369/79-36

Duke Power Company

Atta:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Thomas J. Donat of this office on

October 9-11, 1979 of activities authorized by NRC Construction Permit No.

CPPR-83 for the McGuire facility, and to the discussion of our findings held

with M. D. McIntosh at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective. examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasors on the basis of which

it is claimed that the informati n is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do ncu hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1648 347

7912280 /8 3

.

.

.

Duke Power Company

-2-

NOV 2 31979

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,

2.C.

R. C.

ewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-369/79-36

cc w/ enclosure:

M. D. McIntosh, Plant Manager

Post Office Box 488

Cornelius, North Carolina 28031

J. C. Rogers, Project Manager

Post Office Box 33189

Charlotte, North Carolina 28242

1648

348