ML19262A603

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/79-09 on 790514-18,21-25, 29-31 & 0601 & Notice of Violation
ML19262A603
Person / Time
Site: Pilgrim
Issue date: 09/10/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19262A598 List:
References
NUDOCS 7912070132
Download: ML19262A603 (2)


See also: IR 05000293/1979009

Text

.

.

,

UNITED STATES

p, agg

o

NUCLEAR REGULATORY COMMisslON

3

o

REGION I

$

..k

$31 PARK AVENUE

f

KING OF PRUSSI A. PENNWLVANIA 19406

%...../

SEP 101979

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts

02199

Gentlemen:

Subject:

Inspection 50-293/79-09

This refers to the inspection conducted by Mr. R. Architzel of this office on

May 14-18, 21-25, 29-31, and June 1,1979 of activities authorized by NRC

License No. DPR-35 and to the discussions of our findings held by Mr. R.

Architzel with Mr. P. McGuire of your staff at the conclusion of the inspec-

tion, and to a subsequent telephone discussion between Mr. Architzel and

Mr. Mathis on June 7, 1979.

Areas examined during this inspection are described in the Office of Inspec-

tion and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of pro-

cedures and representative records, interviews with personnel, measurements

made by the inspector, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activ-

ities were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our cor~

respondence to you dated December 31, 1974.

This notice is sent to you pur-

suant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to

submit to this office, within twenty (20) days of your receipt of this notice,

a written statement or explanation in reply including:

(1) corrective steps

which have been taken by you and the results achieved; (2) corrective steps

which will be taken to avoid further items of noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,' Part 2,

Title 10, Code of Federal Regclations, a copy of this letter and the enclo-

sures will be placed in the NRC's Public Document Room.

If this report con-

tains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure. Any such applica-

tion must be accompanied by an affidavit executed by the owner of the infor-

mation, which identifies the document or part sought to be withheld, and which

1522

533

m 2 ovo

4,g g__

.

.

.

Boston Edison Company M/C Puclear

2

contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4',

of Section 2.790.

The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear

from you in this regard within the specified period, the report will be placed

in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

_

=n

.dg & Brunner, Chief

Reap or Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement

Inspection Report #293/79-09

cc w/ encl:

P. J. McGuire, Pilgi:m Station Manager

A. Z. Roisman, Natural Resources Defense Council (Without Report)