ML19262A603
| ML19262A603 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/10/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G BOSTON EDISON CO. |
| Shared Package | |
| ML19262A598 | List: |
| References | |
| NUDOCS 7912070132 | |
| Download: ML19262A603 (2) | |
See also: IR 05000293/1979009
Text
.
.
,
UNITED STATES
p, agg
o
NUCLEAR REGULATORY COMMisslON
3
o
REGION I
$
..k
$31 PARK AVENUE
f
KING OF PRUSSI A. PENNWLVANIA 19406
%...../
SEP 101979
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. G. Carl Andognini, Manager
Nuclear Operations Department
800 Boylston Street
Boston, Massachusetts
02199
Gentlemen:
Subject:
Inspection 50-293/79-09
This refers to the inspection conducted by Mr. R. Architzel of this office on
May 14-18, 21-25, 29-31, and June 1,1979 of activities authorized by NRC
License No. DPR-35 and to the discussions of our findings held by Mr. R.
Architzel with Mr. P. McGuire of your staff at the conclusion of the inspec-
tion, and to a subsequent telephone discussion between Mr. Architzel and
Mr. Mathis on June 7, 1979.
Areas examined during this inspection are described in the Office of Inspec-
tion and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of pro-
cedures and representative records, interviews with personnel, measurements
made by the inspector, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your activ-
ities were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
These items of
noncompliance have been categorized into the levels as described in our cor~
respondence to you dated December 31, 1974.
This notice is sent to you pur-
suant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to
submit to this office, within twenty (20) days of your receipt of this notice,
a written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results achieved; (2) corrective steps
which will be taken to avoid further items of noncompliance; and (3) the date
when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,' Part 2,
Title 10, Code of Federal Regclations, a copy of this letter and the enclo-
sures will be placed in the NRC's Public Document Room.
If this report con-
tains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this
office to withhold such information from public disclosure. Any such applica-
tion must be accompanied by an affidavit executed by the owner of the infor-
mation, which identifies the document or part sought to be withheld, and which
1522
533
m 2 ovo
4,g g__
.
.
.
Boston Edison Company M/C Puclear
2
contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b) (4',
of Section 2.790.
The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear
from you in this regard within the specified period, the report will be placed
in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
_
=n
.dg & Brunner, Chief
Reap or Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement
Inspection Report #293/79-09
cc w/ encl:
P. J. McGuire, Pilgi:m Station Manager
A. Z. Roisman, Natural Resources Defense Council (Without Report)
1522 3M