a UNITED STATES
[
D NUCLEAR REGULATORY COMMisslON
[
REGION I o
631 PAR K AVENUE 2
KING OF PRUSSIA. PENNSYLVANIA 19406
\\...../
AUG 8 1979 Docket Nn.70-687 Union Carbide Corporation ATTN: Mr. James J. McGovern Production Manager, Radiochemicals P. O. Box 324 Tuxedo, New York 10987 Gentlemen:
Sub. ject:
Inspection 70-687/79-02 This refers to the inspection conducted by Mr. J. Roth of this office on May 14-16, 1979 of activities authorized by NRC License No. SNM-639 and to the discussions of our findings held by Mr. Roth with Mr. Konnerth and other members of your staff at the conclusion of the inspection, and to a subsequent telephone discussion between Mr. Thelin of your staff and Mr. Roth on May 18, 1979.
Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinatioris of procedures and representative records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the items of noncompliance and deviation brought to your attention in a letter dated November 14, 1978. We have no further questions regarding the steps you took to correct Items A, B, D, and the deviation. With regard to Item C, your corrective actions has not been completed at the time of this inspection.
Based on the results of this inspection, it appears that certain of your activi-ties were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorized into the levels as described in our corres-pondence to you dated December 31, 1974. This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office, within twenty (20) days of your receipt of this notice, a written state-(1) corrective steps which have been ment or explanation in reply including:(2) corrective steps which will be taken taken by you and the results achieved; to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.
1522 251 7 L '. 2 07 0 09 C
Union Carbide Corporation 2
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Rocm.
If this report contains any infor-mation that you (.or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The informatior:
sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Geo ge S ith, Chief Fu F cility and Materials Safety anch
Enclosures:
1.
Appendix A, Notice of Violation 2.
Office of Inspection and Enforcement Inspection Report Number 70-687/79-02 cc w/encls:
D. B. Holzgraf, Nucleonics Manager J. W. Paradiso, Reactor Supervisor C. Konnerth, Health Physicist R. Bollinger, Vice President, Medical Products Division 1522 252