Forwards IE Insp Rept 50-346/79-28 on 790813-17,27-31, 0910-14 & 24-28 & Notice of Violation
ML19262A573
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/26/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19262A574 List:
References
NUDOCS 7912070066
Download: ML19262A573 (2)


See also: IR 05000346/1979028

Text

. . . . .

o

UNITED STATES

',

I} ,,c

g

NUCLEAR REGULATORY COMMISSION

4

.4

'

c

REGION 111

~

[

799 ROOSEVELT ROAD

o,,, s

% '...* [

GLEN ELLYN. lLLINOIS 60137

g

~ 7g

Docket No. 50-346

'

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Energy Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Messrs. J. F. Streeter and

K. R. Baker of this office on August 13-17, 27-31, September 10-14 and

24-28, 1979, of activities at your corporate office and at Davis-Besse

Nuclear Power Station, Unit 1, authorized by NRC Operating License No.

NPF-3 and to the discussion of our findings on September 28, 1979 with

Mr. T. D. Murray and other members of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

The inspection showed that action had been taken to correct

and prevent recurrence of Item 1.

Consequently, no reply to this non-

compliance is required and we have no further questions regarding that

matter at this time. However, with respect to Item 2, this notice is

sent to you pursuant to the provisions of Section 2.201 of the NRC's

" Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within twenty days

of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance:

(1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

1522

184

79mo

OM

.

OL . . b/3

Toledo Edison Company

-2-

-

In accordar.ce with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

s

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure.

The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

_ cf v

.--

,

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Insp2ction Report

No. 50-346/79-28

cc w/encls:

Mr. T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NFC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

152!2!

185