Notice of 60-day Period for Requests for re-evaluation of Antitrust Matters
ML19261F385
Person / Time
Site: Grand Gulf, Byron, Braidwood, Susquehanna, Waterford, San Onofre, Bellefonte  
Issue date: 10/18/1979
From: Saltzman J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19261F379 List:
References
NUDOCS 7910260056
Download: ML19261F385 (3)


Text

-

[7590-01]

NUCLEAR REGULATORY COMMISSION OPERATING LICENSES UNDER ANTITRUST REVIEW TIME FOR SUBMISS 10N OF VIEWS ON ANTITRUST MATTERS The Commission has recently delegated authority and approved procedures for the Director of Nuclear Reactor Regulation to review operating license applicatio;. to determine whether there have been "significant changes" in a licensee's activities or proposed activities subsequent to the previous antitrust review under Section 105c(2) of the Atomic Energy Act of 1954, as amended, 42 U.S.C. 5 2135c(2) in connection with the construction permit applicatian.

The following operating license applications are currently under antitrust review:

Susquehanna 1 and 2 Pennsylvania Power & Light Allegheny Electric Cooperative Docket Nos. 50-387A and 50-388A cps authorized 11/2/73 San Onofre 2 and 3 Southern California Edison Docket Nos. 50-361A and 50-362A cps authorized 10/18/73 Grand Gulf 1 and 2 Mississippi Power and Light Docket Nos. 50-416A and 50-417A cps authorized 5/3/74 1~ 7 297 19102600 74

('

, Waterford 3 Louisiana Power & Light Docket No. 50-382A CP authorized 5/14/74 Bellefonte 1 and 2 Tennessee Valley Authority Docket Nos. 50-438A and 50-439A cps authorized 9/17/74 Bryon 1 and 2 Commonwealth Edison Docket Nos. 50-454A and 50-455A cps authorized 12/13/74 Braidwood i and 2 Commonwealth Edison Docket Nos. 50-456A and 50-457A cps authorized 1/13/75 Operating license applications and antitrust information in response to NRC's Regulatory Guide 9.3 have been submitted for the above named plants.

This information and additional material submitted in response to additional staff questions on San Onofre, Waterford, Susquehanna, and Grand Gulf are available in the respective local public document rooms and in the NRC Public Document Room at 1717 H Street, NW, Washington, DC.

On completion of staff antitrust review of each of the above-named applications, the Director of Nuclear Reactor Regulation will issue an initial finding as to whether there have been "significant changes" under Section 105c(2) of the Act.

A copy of this finding will be published

/ 298

c 9

. in the Federal Register and will be sent to the Washington and local public document rooms and to those persons providing comments or information in response to this notice.

If the initial finding concludes that there have not been any significant changes, requests for reevaluation may be submitted for a period of 60 days after the date of the Federal Register notice.

The results of any reevaluations that are requested, will also be published in the Federal Register and copies sent to the Washington and local public document rooms.

Any person who wistcs to have his views considered with respect to significant changes related to antitrust matters which have occurred in the licensee's activities since the construction permit antitrust reviews for the above named plants should submit such views to the U. S. Nuclear Regulatory Commission, Washington, DC 20555, Attention: Chief, Antitrust and Indemnity Group, Office of Nuclear Reactor Regulation, on or before (30 days).

FOR THE NUCLEAR REGULATORY COMMISSION Jerome Saltzman, Chief Antitrust and Indemnit f Group Office of Nuclear Re tor Regulation