ML19261E217
| ML19261E217 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 07/03/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Parr O Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19261E218 | List: |
| References | |
| 482, NUDOCS 7907050291 | |
| Download: ML19261E217 (2) | |
Text
,
c o
VritorNrA E LECTICIO AN D POW E lf COM mNY H ICIIM ON D,VF HOIN I A 2 0U 6 8 July 3, 1979 Mr. Harold R. Denton, Director Serial No. 482 Office of Nuclear Reactor Regulation PG/JPS:sym Atta:
Mr. Olan D. Parr, Chief Docket Nos. 50-338 Light Water Reactors Branch No. 3 50-339 Division of Project Management License No. NPF-4 U. S. Nuclear Regulatory Commission CPPR-78 Washington, D. C.
20555
Dear Mr. Denton:
Mr. Parr's letter, dated May 23, 1979, indicates that the submission of a Process Control Program (PCP) for solidification and an Offsite Dose Calcu-lation Fbnual (ODCM) are required to complete your review of the proposed Radiological Effluent Technical Specifications for North Anna, Unit No. 1.
As regards the PCP, we have provided in our letter of May 29, 1979, a ue-ceription of the operational problems associated with the installed Radio-active Waste Solidfication System.
Since these pr currently prevent 7
operation of this system for its intended purpose, hipment of dewerer-i ed resins is considered a justifiable alternative.
We believe, tha> the cubmission of a PCP is not appropriate at this time.
The ODCM for North Anna Power Station is attached for your revicw. This manual incorporates the guidance of EUREC-0133 and specifies the e.ethodo-logy and parameters to be used for calculating the of fsite dose contribu-tions due to radioactive liquid and gaseous effluents.
The methodology used for determining maximum set point values for radioactive effluent radiacion monitors is included.
As stated in our letter of April 11, 1979, we feel that the information that has been provided is adequate for your review of our license amendment appplication.
We encourage your continuation of this review, and upon completion, would be pleased to me - t with the staff to discuss :ny specific areas of concern if you determine that such would be beneficial.
Yours very truly, 6.;f.\\O/d(2<-6c,D v
/
C. M. Stallings Vice President - Power Supply And Production Operations SPS/4E2 1g}7907050[W
'[!j9a k-Sir 711 i
V "oisir Etternic Axu Po"Eu Comsy To Mr. flarold R. Denton, Director Attachment cc:
fir. James P, O' Reilly, Directc,-
Office of Inspection and Enforcement Region II
- On
'[)))3 I/
'