ML19261E091

From kanterella
Jump to navigation Jump to search
Discusses Schedule of Response to IE Bulletin 78-12,18-12A & 78-12B.C-E Reactor Vessel Manufacturer,Is Engaged in Requested Records Search.Final Response to Bulletin Will Be Made by 790629
ML19261E091
Person / Time
Site: Perkins, Cherokee  Duke Energy icon.png
Issue date: 05/16/1979
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
P81-1412.11, NUDOCS 7907050118
Download: ML19261E091 (1)


Text

e DUKE POWEIt CO31PANY 3p Ei.EcTi<ir ( 'ENTi.:st. Ilox *1:1189, ('iiri<i.orrn. N. C. 2=242 May 16, 1979

. 3., c ,pg

. . , . . ~ . . . - .

3

$c

- to Mr. J. P. O'Reilly, Director V. S. Nuclear Regulatory Comission 5 >Z 101 Marietta Street, Suite 3100 [

is

,>o Atlanta, Georgia 30303 D

ec 9$

.. 2

Subject:

Perkins Nuclear Station a Docket Nos.. 50-488, 50-489, 50-490 - '.'"

Cherokee Nuclear Station Docket Nos.. 50-491, 50-492, 50-493 IE Bulletin: 78-12,12A,12B J Atypical Reactor Weld Material File: P81-1412.ll

Reference:

Mr. A. E. Scherer's letter to Mr. Harold D. Thornburg, Director, Division of Reactor Construction Inspection, dated April 25, 1979

Dear Mr. O'Reilly:

Our reactor vessel manufacturer, Combustion Engineering, Inc., is currently engaged in performing the records search requested by IE Bulletin 78-12 (as modified by Supplement 12A and 12B). They plan to submit a generic report directly to the NRC before June 8,1979 covering all reactor vessels manufactured by CE. We will reference the generic report in our final response to the bulletin which should be transmitted to you on or before June 29, 1979. This schedule is consistent with the referenced communication between CE and the NRC.

Very truly yours, k

L. C. Dail Vice President Design Engineering JDW/jmi 20b Olb 7 907 05 0l/E ' ,,Jr '~ 't OMCI AL COPY