ML19261D849

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/79-03 & 50-509/79-02 on 790312-15.No Noncompliance Noted
ML19261D849
Person / Time
Site: Satsop
Issue date: 04/20/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19261D850 List:
References
NUDOCS 7906260520
Download: ML19261D849 (2)


See also: IR 05000508/1979003

Text

@

.

.

cf# "%g

UNITED STATES

,

yg

,t

NUCLEAR REGULATOnY COMMisslON

Vd

k .h[.

REGION V

0,

MA

b

SutTE 202 W ALNUT CREEK PLAZ A

$

b

1990 N. C ALIFORNI A DOULEVARD

,o

WALNUT C R EEK, C ALIFOR NI A 94596

APR 2 01979

Docket Nos. 50-508

50-509

Washington Public Power Supply System

P.O. Box 468

Richland, Washington 99352

Attention:

Mr. N. O. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of WNP-3 and WNP-5

This refers to the inspection conducted by Messrs. W. G. Albert,

T. W. Hutson and P. P. Narbut of this office on March 12-15,1979, of

activities authorized by NRC Construction Permit Nos. CPPR-154 and

CPPR-155, and to the discussion of our findings held with Mr. W. J. Talbot

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

i

inspection report. Within these areas, the inspection consi:ted of

I

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you be-

lieve to be proprietary, it is necessary that you submit a written

application to this office, within 20 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons why it

2313

194

79062605go

l

-

t

i

-

Washington Public Power Supply System

-2-

ApR 3 0 B79

is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is con-

tained in an enclosure to the application, since the application with-

out the enclosure will also be placed in the Public Document Room.

If

we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

.

s

%

G. S. S encer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-508/79-03

and 50-509/79-02

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

,

cc w/ enclosure:

W. J. Talbott, Division Manager, WPPSS

2313

195

!

l

!

l

1

!

.