ML19261C820
| ML19261C820 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/07/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19261C819 | List: |
| References | |
| NUDOCS 7904100511 | |
| Download: ML19261C820 (2) | |
See also: IR 05000413/1979002
Text
.
.
O
g# "800
UNITED STATES
g,
NUCLEAR REGULATORY COMMISSION
g
.c
g
REGION 11
-
.c
101 M ARIETT A STR E ET, N.W.
8
ATLANTA, GEORGIA 30303
o,s,*****/
MAR 0 71979
In Reply Refer To:
RII:BRC
50-413/79-02
50-414/79-02
Duke Power Company
ATTN:
Mr. L. C. Dail, Vice President
Design Engineering
P. O. Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by B. R. Crowley of this office on
February 6-9,
1979, of activities authorized by NRC Contruction Permit Nos.
CPPR-116 and CPPR-117 for the Catawba Nuclear Station, Units 1 and 2 f acility,
and to the discussion of our findings held with D. G. Beam at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
p rop rieta ry , it is necessary that you make a written application within
20 days to this office to withhold such information f rom publi;. disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
7904100511
,
.
MAR 0 71979
.
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
!N
/1 L
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure.
Inspection Report Nos. 50-413/79-02
and 50-414/79-02
cc w/ encl:
Mr. D. G. Beam, Project Manager
Catawba Nuclear Station
P- 0. Box 223
Clover, South Carolina 29710