Forwards IE Insp Repts 50-413/79-02 & 50-414/79-02 on 790206-09.No Noncompliance Noted
ML19261C820
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/07/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19261C819 List:
References
NUDOCS 7904100511
Download: ML19261C820 (2)


See also: IR 05000413/1979002

Text

.

.

O

g# "800

UNITED STATES

g,

NUCLEAR REGULATORY COMMISSION

g

.c

g

REGION 11

-

.c

101 M ARIETT A STR E ET, N.W.

8

ATLANTA, GEORGIA 30303

o,s,*****/

MAR 0 71979

In Reply Refer To:

RII:BRC

50-413/79-02

50-414/79-02

Duke Power Company

ATTN:

Mr. L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by B. R. Crowley of this office on

February 6-9,

1979, of activities authorized by NRC Contruction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba Nuclear Station, Units 1 and 2 f acility,

and to the discussion of our findings held with D. G. Beam at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

p rop rieta ry , it is necessary that you make a written application within

20 days to this office to withhold such information f rom publi;. disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

7904100511

,

.

MAR 0 71979

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

!N

/1 L

Charles E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure.

Inspection Report Nos. 50-413/79-02

and 50-414/79-02

cc w/ encl:

Mr. D. G. Beam, Project Manager

Catawba Nuclear Station

P- 0. Box 223

Clover, South Carolina 29710