Forwards IE Insp Rept 50-266/79-02 & 50-301/79-01 on 790205-09.Notice of Violation Withheld (Ref 10CFR2.790)
ML19261C346
Person / Time
Site: Point Beach  
Issue date: 03/02/1979
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19261C347 List:
References
NUDOCS 7903220304
Download: ML19261C346 (2)


See also: IR 05000266/1979002

Text

I

s

.

NOR

~

.

/ %

UNITED STATES

pk

,

NUCLEAR REGULATORY COMMISSION

., e

[( 'M J j

REGloN til

'

l;

2

799 ROOSEVELT RoAo

GLEN E LLYN, lLLINoIS 60137

.

,

N10 -2.1979

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATIN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the inspection conducted by Messrs. J. R. Creed

and J. C. Howell of this office on February 5-9, 1979, of activities

at the Point Beach Nuclear Plant, Units 1 and 2 authorized by NRC

Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion

of our findings with Messrs. Reed and Krukowski at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

Prior to the conclusion of this

inspection, action was taken to correct one of the two identified

items of noncompliance and to prevent recurrence. Consequently,

no reply to that noncompliance is required and we have no further

questions regarding this matter at this time.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations. Section 2.201 requires you

to submit to this office within twenty days days of your receipt

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

'

.. ! 'kh" 5 k_

--.u.,--

m.m.......o....,

790322030T

.

.

.

,

Fi?

-2. 979

'

Wisconsin Electric Power

-2-

Company

Areas examined during this inspection concern a subject

matter which is exempt from disclosure according to Section

2.790 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations. Consequently, the enclosure

to this letter, our report of this inspection, and your

response to the noncompliance identified in the enclosure

to this letter will not be placed in the Public Document

Room. Therefore, your statement of corrective action

regarding the noncompliance identified in the enclosure

should be submitted as a separate enclosure to your trans-

mittal letter.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

rC)

-

t~c!AL

I J.A. Hind,Chikf

"

s

Safeguards Branch ;

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Rpt

No. 50-266/79-02

50-301/79-01

(Part 2.790(d) Information)

cc w/encls:

Mr. G. A. Reed, Plant

Manager

Central Files

Reproduction Unit 20b

cc w/o encls:

PDR

Local PDR

Sandra W. Blast, Lakeshore

Citizens for Safe Energy

  • ,

-Att a er ea sP eat

AA=*anane

fi t

v '

m iv

ww i

WN kWj 4415

4 45

av