Forwards IE Insp Rept 50-366/79-04 on 790116-19.No Noncompliance Noted
ML19261C069
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/14/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19261C065 List:
References
NUDOCS 7903140521
Download: ML19261C069 (2)


See also: IR 05000366/1979004

Text

,

  1. gR 88%q'o,,

UNITED STATES

.

.

NUCLEAR REGULATORY COMMISSION

[

REGION il

o

,

5

E

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 3o303

/

%***l!**,

FEB 141979

In Reply Refer To:

RII:RVL

50-366/79-04

Georg a Power Company

Attn:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N.W.

Atlanta, Georgi-

30303

Gentlemen:

This refe.is to the inspection conducted by Mr. R. Vogt-Lowell of this

office on January 16-19, 1979 of activities authorized by NRC License

No. NPF-5 for the Edwin I. Hatch facility, Unit 2, and to the discussion

of our findings held with Mr. H. Nix at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specifiel period, the report will be placed in the

Public Document Room.

79031405;4

.

.

FEB $ 4 1079

.

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

[. (.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-366/79-04

cc w/ enclosure:

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

Post Office Box 442

Baxley, Georgia 31513

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I. Hatch

Post Office Box 442

Baxley, Georgia 31513