u

UNITED STATES

[gMRio

.

o,

NUCLEAR REGULATORY COMMISSION

g

['

' 'n

REClON il

l

. $

101 M ARIETT A STREET, N.W.

I

ATLANTA, GEORGIA 30303

o

%*****/

FEB 2

1979

In Reply Refer To:

RII:AKH

50-348/79-02

Alabama Pcwcr Company

ATTN:

Mr. F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, Alabama 35291

Gentlemen:

This refers to the inspection conducted by A. K. Hardin of this office on

January 8-12, 1978, of activities authorized by NRC License No. NPF-2 for the

Farley Unit 1 facility, and to the discussion of our findings held with

W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

'

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

In accordance with Sectica 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

,

days to this office to withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document. If we do not hear from you in this rcgard

within the specified period, the report will be placed in the Public Document

Room.

7903070 % &

'

...

.

FFD 9

1979

,

Alabama Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

25.dC.

'

R. C.

ewis, Ac 7g Chief

Reactor Operat

and Nuclear

Support Brant

Enclosure:

Inspection Report No. 50-348/79-02

cc w/ enc 1:

Mr. A. R. Barton

Mr. W. G. Hairston

Executive Vice President

Plant Manager

Alabama Power Company

Farley Nuclear Plant

Post Office Box 2641

Drav r 470

Birmingham, Alabama 35291

Ash.3rd, Alabama

Mr. H. O. Thrash

Mr. R. E. Hollands, Jr.

Manager - Nuclear Generation

Quality Assurance Supervisor

Alabama Power Company

Farley Nuclear Plant

Post Office Box 2641

Post Office Box U

~

Birmingham, Alabama .35291

Ashford, Alabama 36312

Mr. C. Biddinger, Jr.

Manager - Corporate Quality

Alabama Power Company

Post Office Box 2641

Birmingham, Alabama 35291

.