Forwards IE Insp Rept 50-285/78-18 on 781211-15 & Notice of Deviation
ML19261B575
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/03/1979
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Short T
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML19261B576 List:
References
NUDOCS 7902280226
Download: ML19261B575 (2)


See also: IR 05000285/1978018

Text

a n8 Coq (o

UNITE D STATES

,

,

NUCLE AR REGULATORY COMMISSION

& P

o

R EGION IV

5

$

C11 RYAN PLAZA DRIVE, SUITE 1000

i

.

E

ARLINGTON, TEXAS 76011

%,[,

January 3, 1979

In Reply Refer To:

Docket tio. 50-285/78-18

0maha Public Power District

ATTN:

T. E. Short,

Assistant General Manager

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by Mr. W. D. Johnson and Mr. G. L.

Constable of this office during the period December 11-15, 1978, of

activities authorized by NRC Operating License DPR-40, and to their

discussions of the findings with members of your staff at the conclusion

of the inspection.

Principal areas examined during the inspection included:

(1) requali-

fication training; (2) refueling outage surveillance; (3) plant operations

review; (4) startup testing after refueling; and (5) startup testing of a

modified system. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

'

Within the scope of this inspection, no items of noncompliance were

identified.

However, based on the results of this inspection, it appears

that one of your activities is in deviation from one of your commitments

to the Commission, as set forth in the Notice of Deviation, enclosed here-

with as Enclosure (1).

You are requested to submit to this office within

20 days of your receipt of this notice, a written statement in reply includ-

ing:

(1) actions which you plan to take to satisfy your conmitment; and

(2) the date when the above actions will be complete.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you or your contractors believe

to be proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons for which

it is claimed that the information is proprietary, and should be prepared so

that the proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

79022802%

..

-

Omaha Public Power District

-2-

January 3,1979

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely ,

yjjf/&.Ly ,J

G. L. Madsen, Chief,

Reactor Operations and

fluclear Support Branch

Enclosures :

1.

Notice of Deviation

2.

IE Inspection Report No. 50-285/78-18