Forwards IE Insp Repts 50-440/78-16 & 50-441/78-15 on 781205-08.No Noncompliance Noted
ML19261B563
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/10/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO., COMMONWEALTH EDISON CO.
Shared Package
ML19261B565 List:
References
NUDOCS 7902280207
Download: ML19261B563 (2)


See also: IR 05000440/1978016

Text

.

e

r-

0"

UNili D F.1 AT f ?

NUCL!/8 - Rf Gill A10HY CO MIJ.lb t !' '

~

,

REGloN Ill

,1

/

.

ae v t a ~;,c

+ q'

r'

,

'e

GL E N E LL Y N. lL LINoIS 60131

....-

Jfd< '

als

Docket No. 50 440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN:

Mr. D. R. Davidson

Vice President - Engineering

Post Office Box 5000

Cleveland, O!! 44101

Gentlemen:

This refers to the inspection conducted by Messrs. G. F. Maxwell

and J. Hughes of this office on December 5 - 8, 1978, of activi-

ties at the Perry Nuclear Plant Project, Units 1 and 2, authorized

by NRC Construction Permits No. CPPR-148 and No. CPPR-149 and to

the discussion of our findings with Messrs. M. R. Edelman and

C. W. Groscup and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted ot a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In acordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations,

a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this reycrt contains information t'1at you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such inf ormation f rom public disclosure.

The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

7902280267

.

.

.

The Cleveland Electric

-2-

JTi."3

~

Illuminating Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

/fAA/

R. F. Heishna'n Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Rpts No. 50-440/78-16

and No. 50-441/78-15

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDI-

NSIC

TIC

U. Young Park, Power

Siting Commission

Mr. Daniel D. Wilt,

Attorney