ML19261B541
| ML19261B541 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/05/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19261B542 | List: |
| References | |
| NUDOCS 7902280159 | |
| Download: ML19261B541 (2) | |
See also: IR 05000445/1978023
Text
. . .
.
7FAA
'
99 * %,
UNITED STATES
p
o
NUCLE AR REGULATORY COMMISSION
- '*
/n
itEGION IV
h .k O
. $
611 RYAN PLAZA DRIVE, SUITE 1000
'
'j
' .
[
ARLINGTON. TEXAS 7G011
"
+....
January 5,1979
In Reply Refer To:
RIV
Docket flo. 50-445/Rpt. 78-23
50-446/Rpt. 78-23
Texas Utilities Generating Company
ATTil: Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Messrs. A. B. Rosenberg and
A. B. Beach of our staff during the period December 18-20, 1978, of
activities authorized by f1RC Construction Permit Nos. CPPR-126 and 127
for the Comanche Peak facility, Units No.1 and 2, and to the discussion
of our findings with Mr. R. G. Tolson and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection con-
sisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
Within the scope of the inspection, no items of noncompliance were iden-
tified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure.
The application
must include a full statement of the reasons why it is claimed that the
information is proprietary.
The application should be prepared so that
any propriet.ary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
,
7902280159
b
_ _ _ _
. . _ _ _ _ . .
- - .
. Texas Utilities Generating
Company
-2-
January 5,1979
be placed in the Public Doe: ment Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
,
h-) , ;_~.
G
_
W. C. Seidle, Chief
Reactor Construction and
Engineering Support Branch
Enclosure-
IE Inspecticn Report tio. 50-445/78-23
50-446/78-23
cc: w/ enclosure
Texas Utilities Generating Company
ATTil: Mr.11. C. Schmidt, Project Manager
2001 Bryan Tower
Dallmo, Texas
75201