WUP PSAR Amendment 20 HAVEN 2/79 INSERTION INSTRUCTIONS Correction pages to the Haven Site Addendum (Volumes 1-5) are identified by " Amendment 20, 2/79."
Change bars (vertical bars in the margin of corrected text and tables) indicate the location of additions, deletions, and changes originating with this amendment. Change bars from previous amendments have been dropped from corrected pages.
Figures do not have change bars, but are identified by
" Amendment 20" under the title block.
Entries herein beginning with T or F designate tables and figures, respectively. All other entries are page numbers.
Remove Old Insert New Location VOLUME 1 WE Letter to Harold Before WE Letter Denton for Amendment to Harold Denton 20/ blank Amendment 19 USNRC Attachment -
Amendment 20, Haven Site Addendum / blank Sol Eurstein Affidavit /
blank MEP-1/MEP-2 MLP-1/MEP-2 Before Volu:re 1 Title Page GENERAL TABLE OF CONTENTS i thru iv i thru iv Before Chapter 1 Tab CHAPTER 1 EP.1-1/ blank EP.1-1/ blank After Chapter 1 Tab 1-1/ blank 1-i/1-ii 1.1-1/1.2-1 1.1-1/1.2-1 F1.2-1 Arter p. 1.2-1 1-'
7902150303
WUP PSAR Amendment 20 HAVEN 2/79 Remove Old Insert New Location CHAPTER 2 EP.2-1 thru EP.2-3/ blank EP.2-1 thru EP.2-3/ blank After Chapter 2 Tab 2.2-i thru 2.2-iii/ blank 2.2-i thru 2.2-iii/ blank Af ter Section 2.2 Tab 2.2-1 thru 2.2-12 2.2-1 thru 2.2-25 T2.2.1-1 thru T2.2.1-3 Af ter p. 2.2-2 5 T2.2.2-2/T2.2.3-1 T2.2.2-2/T2.2.3-1 After T2.2.2-1 (5 of 6/6 of 6)
T2.2.3-2 and T2.2.3-3 T2.2.3-2 thru T2.2.3-12 F2.2.1-5 thru F2.2.1-7 After F2.2.1-4 F2.2.3-1 thru F2.2.3-5 After F2.2.1-7 VOLUME 2 GENERAL TABLE OF CONTENTS i thru iv i thru iv Before Section 2.4 Tab CHAPTER 2 1.4-1 thru 2.4-vi 2.4-i thru 2.4-vii/ blank After Section 2.4 Tab 2.4-17 thru 2.4-22 2.4-17 thru 2.4-22 2.4-33 thru 2.4-38 2.4-33 thru 2.4-38 T2.4.2-2/T2.4.3-1 T2.4.2-2/T2.4.3-1 2.5-v thru 2.5-x 2.5-v thru 2.5-x After Section 2.5 Tab 2.5-23 thru 2.5-26 2.5-23 thru 2.5-26a/ blank 2.5-31/2.5-32 2.5-31/2.5-32 1-2
EUP PSAR Amendment 20 llAVEN 2/79 hemove Old Insert New Location F2.5.1-90 and F2.5.1-9E F2.5.1-9D and F2.5.1-9E F2.5.1-9F and F2.5.1-9G After F2.5.1-9E F2.5.4-7 thru F2.5.4-9 F2.5.4-7 thru F2.5.4-9 F2.5.5-6 F2.5.5-6 F2.5.5-8 thru F2.5.5-10 F2.5.5-8 thru F2.5.5-10 CHAPTER 9 EP.9-1/ blank EP.9-1/ blank After Chapter 9 Tab 9-i thru 9-iv 9-i thru 9-iv 9.4-1/9.4-2 9.4-1 thru 9.4-3/ blank F9.2.3-1 F9.2.3-1 F9.4.1-1 Before F9.4.9-1 CHAPTER 10 EP.10-1/ blank EP.10-1/ blank After Chapter 10 Tab 10.4-3/ blank 10.4-3/ blank F10.4.12-2 and F10.4.12-2 and F10.4.12-3 F10.4.12-3 CHAPTER 15 EP.15-1/ blank EP.15-1/ blank After Chapter 15 Tab 15-i/15-ii 15-i/15-ii T15.4.1-4/ blank After T15.4.1-3 Delete Sheet VOLUME 3 GENERAL TABLE OF CONTENTS i thru iv i thru iv Before App. 2A Tab I-3
WUP PSAR A:nend:nent 20 RAVEN 2/79 Remove Old Insert New Location VOLUME 4 GENERAL TABLE OF CONTENTS i thru iv i thru iv Before App. 2B Tab APPENDIX 2D EP.2D-1/ blank EP.2D-1/ blank After App. 2D Tab 2D-1/2D-2 After Seismic Survey Drawing -
Sheet 8 of 8 F2D-1 After p. 2D-2 VOLUME 5 GENERAL TABLE OF CONT'NTS 1 thru iv 1 thru iv Before NRC Questions and Responses Tab NRC QUESTIONS AND RESPONSES EP.Q-1/ blank EP.Q-1/EP.Q-2 After NRC Questions and Responses Tab Q-v/Q-vi Q-v/Q-vi
'Iab NRC Letter -
Before Tab 222.0 7/18/78 (discard) (Power Systems Branch)
Tab NRC Letter -
Eefore Tab 312.0 8/3/78 (discard) (Accident Analysis Lranch)
I-4
WUP PSAR Amendment 20 HAVEN 2/79 Remove Old Insert New Location Relocate the following mat-erial before Tab 360.0 (Geology /
Seismology) :
Tab 312.0 (Acci-dent Analysis Branch) and Q312.3-1 thru Q312.8-1/ blank Tab 321.0 (Hy-drology) and 0321.1-1 and Q321.2-1/ blank Q312.6-1/ blank Q312.6-1/ blank After Tab 312.0 Q312.8-1/ blank Q312.8-1/ blank Q360.7-1/ blank thru Before Tab 361.0 Q36 0.16 -1/ blank Q360.17-1/Q360.17-2 TQ360.17-1 FQ360.17-1 Q360.18-1/ blank Q361.10-1/ blank Q361.10-1/ blank After Tab 361.0 (Geology /
Seismology) 1-5
WUP PSAR Amendment 20 HAVEN 2 /19 HAVEN SITE ADDENDUM MASTER LIST OF EFFECTIVE PAGES he Lists of Ef fective Pages for the Site Addendum are compiled for each chapter and appendix in Volumes 1 through 4 and the NRC Questions and Responses in Volume 5.
he Master List of Effective Pages presents the dates of issue for each amendment, and the revision number of the General Table of Contents (found at the front of each volume) , and each List of Eff ective Pages (found immediately af ter the respective tab) .
Issue Date Issue Date Amendment 15 12/16/77 Amendment 18 9/22/78 Amendment 16 3/24/78 Amendment 19 11//78 Amendment 17 5/26/78 Amendment 20 2/79 General Table of Contents i 18 11 thru iv 20 Lists of Effective Pages Chapter 1 Appendix 2A EP.1-1 20 EP.2A-1 19 Chapter 2 Appendix 2B EP.2-1 thru EP.2-3 20 EP.2B-1 19 Chapter 3 Appendix 2C EP 3-1 19 EP.2C-1 19 Chapter 8 Appendix 2D EP.8-1 19 EP.2D-1 20 Chapter 9 Appendix 2E EP.9-1 20 EP.2E-1 19 Chapter 10 Appendix 2F EP.10-1 20 EP.2F-1 19 Chapter 11 Appendix 2G EP.11-1 19 EP.2G-1 19 Chapter 13 Appendix 2H EP.13-1 19 EP.2H-1 19 Chapter 15 Appendix 2I EP.15-1 20 EP.2I-1 19 MEP-1
WUP PSAR Amendment 20 HAVEN 2/79 MASTER LIST OF EFFECTIVE PAGES (CONT'D)
Appendix 2J EP.2J-1 19 Appendix 2K EP.2K-1 19 Appendix 2L EP.2L-1 19 Appendix 2M EP.2M-1 19 Appendix 2N EP.2N-1 19 NRC Ouestions and Response EP.Q-1 and 2 20 MEP-2
WUP PSAR Amendment 18 HAVEN 9/22/78 GENERAL TABLE _OF CONTENTS Section Title Volume
1.0 INTRODUCTION
AND GENERAL DESCRIPTION I OF PLANT 1.f INTRODUCTION I 1.2 GENERAL PLANT DESCRIPTION I 1.4 IDE14TIFICATION OF AGENTS AND CONTRACTORS I 2.0 SITE CHARACTERISTICS I 2.1 GEOGRAPHY AND DEMOGRAPHY I 2.2 NEARBY INDUSTRIAL, TRANSPORfATION, AND I MILITARY FACILITIES 2.3 METEOROLOGY I 2.4 HYDROLOGIC ENGINEERING II 2.5 GEOLOGY AND SEISMOLOGY II 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, II AND SYSTEMS 3.4 WATER LEVEL (FLOOD DESIGN) II 3.7 SEISMIC DESIGN II 3.8 DESIGN OF CATEGORY I STRUCTURES II 8.0 ELECTRIC POWER II 8.2 OFFSITE POWER SYSTEMS II 9.0 AUXILIARY SYSTEMS II 9.2.1 REACTOR PLANT SERVICE WATER SYSTEM II 9.2.3 DEMINERALIZED WATER MAKEUP SYSTEM II 9.2.4 POTABLE AND SANITARY WATER SYSTEM II 9.2.5 ULTIMATE HEAT SINK II 9.3.6 BORON RECOVERY SYSTEM II i
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT 'D)
Section Title Volume 9.4.1 AIR CONDITIONING, HEATING, COOLING, AND II VENTILATION SYSTEMS 9.4.9 SERVICE WATER PUMPHOUSE VENTILATION II 9.5.1 FIRE PROTECTION II 10.0 STEAM AND POWER CONVERSION SYSTEM II 10.4.8 STEAM GENERATOR BLOWDOWN SYSTEM II 10.4.12 MAKEUP AND BLOWDOWN SYSTEMS II 11.0 RADIOACTIVE WASTE MANAGEMENT II 11.2 RADIOACTIVE LIQUID WASTE SYSTEM II 11.3 RADIOACTIVE GASEOUS WASTE SYSTEM II 11.6 OFFSITE RADIOLOGICAL MONITORING PROGRAM II 13.0 CONDUCT OF OPERATIONS II 13.3 EMERGENCY PLANNING II 15.0 ACCIDENT ANALYSIS II
15.1 INTRODUCTION
II 15.2 CALCULATED SITE RADIOLOGICAL DOSES II APPENDICES TO SECTION 2 2A BORING LOGS III 2B BACKFILL EVALUATION STUDIES IV 2C REPORT, SEISMIC SURVEY, HAVEN NUCLEAR IV PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2D REPORT, SEISMIC SURVEY, LAKE MICHIGAN IV AREA, HAVEN SITE - SHEBOYGAN COUNTY, WISCONSIN UTILITIES PROJECT BATHYMETRY SURVEY - HAVEN SITE - 1978 ii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF COtTI'ENTS (CONT 'D)
Section Title Volume 2E REPORT, SEISMIC VELOCITY AND ELASTIC IV MODULI MEASUREMENTS, HAVEN NUCLEAR PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2F REPORT - UNCONFINED COMPRESSION TESTS - IV HAVEN SITE (JUNE 1974)
REPORT ON ADDITIONAL UNCONFINED COMPRESSION TESTS - HAVEN SITE (MARCH 1978) 2G REPORT, SOILS LABORA'IORY TEST DATA, IN SITU IV SOILS, HAVEN NUCLEAR POWER PLANT, UNITS 1 AND 2 2H REPORT, RESONANT COLUMN TESTS, IV WEPCO HAVEN SITE 2I REPORT, CYCLIC TRIAXIAL TESTING, IV HAVEN BORROW SANDS, WISCONSIN ELECTRIC 2J REPORT, FAULTING IN THE ANNA, OHIO REGION IV 2K REPORT, SEISMIC RISK ANALYSIS, HAVEN SITE IV 2L REPORT, LABORATORY DYNAMIC TEST DATA, IV STRUCTURAL BACKFILL, HAVEN NUCLEAR PLANT, UNITS 1 AND 2 2M REPORT, GEOLOGY AND SEISMICITY UNDER IV LAKE MICHIGAN 2N BORING LOGS, HAVEN SITE IV NRC QUESTIONS AND RESPONSES V NRC LETTER 1/9/76 IAR310 ACCIDENT ANALYSIS V IAR324 FOUNDATION ENGINEERING V IIAR310 ACCIDENT ANALYSIS V IIAR321 HYDROLOGIC ENGINEERING V IIAR322 METEOROLOGY V iii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT'D)
Section Title Volume IIAR323 GEOLOGY AND SEISMOLOGY V IIAR324 FOUNDATION ENGINEERING V IIAR420 INDUSTRIAL SECURITY AND EMERGENCY PLANNING V 222.0 POWER SYSTEMS BRANCH V 312.0 ACCIDENT ANALYSIS BRANCH V V
321.0 HYDROLOGY V
360.0 GEOLOGY / SEISMOLOGY V
361.0 GEOLOGY / SEISMOLOGY METEOROLOGY V 372.0 EMERGENCY PLANNING BRANCH V 432.0 iv
WUP PSAR Amendment 20 HAVEN 2/79 HAVEN SITE ADDEtOIH LIST OF EFFECTIVE PAGES CHAPTER 1 Page, Table (T) or Revision Piqure (F) Number 1-1 15 1-11 20 1.1-1 15 1.2-1 20 F1.2-1 20 1.4-1 15 EP.1-1
WUP PSAR Amendment 15 HAVEN 12/16/77 CHAPTER 1 TABLE OF CONTENTS Section Page 1.1 Introduer. ion 1.1-1 1.2 General Plant Description 1.2-1 1.2.2 Site Characteristics 1.2-1 1.4 Identification of Agents and contractors 1.4-1 1-1
WUP PSAR Amendment 20 HAVEN 2/79 CHAPTER 1 LIST OF FIGURES Figure Title 1.2-1 Plot Plan 1-ii
WUP PSAR Amendment 15 HAVEN 12/16/77
1.1 INTRODUCTION
By application filed with the Wisconsin Utilities Project Preliminary Safety Analysis Report (PSAR), the Applicants seek a construction permit to build standardized nuclear power plants located on one or more sites in the central and southern half of the State of Wisconsin, under the Atomic Energy Commission Act of 1954 as amended, and the Regulations of the Atomic Energy Commission set forth in Title 10, Part 50 of the Code of Federal Regulations (10CFR50) as amended. By this Site Addendum to the Wisconsi:n Utilities Project PSAR, the Applicants seek to locate such a plant, the Haven Nuclear Plant, Units 1 and 2, consisting of two electric generating units, on a site approximately 5 miles north of Sheboygan, Wisconsin on the western shore of Lake Michigan.
These two units were originally proposed to be located at the Koshkonong site in Jefferson County, Wisconsin. The Site Addendum for the Koshkonong site has been reviewed by the NRC and was the subject, along with the Wisconsin Utilities Project Standard PSAR, of a Staff Safety Evaluation Report in October 1975, supplemented in April 1976 and July 1976. In early 1978 this Haven Site Addendum will be amended to include the commitments made by the Applicants in the course of the NRC Staff review of the Koshkonong site as they relate to Haven. For example, the maximum horizontal ground acceleration in the bedrock for the Safe Shutdown Earthquake (SSE) , and Operational Basis Earthquake (OBE) agreed upon for the Koshkonong site will also apply to the Haven site.
This Site Addendum for the Haven Nuclear Plant is submitted in support of the Wisconsin Utilities Project PSAR and is based on the guidelines provided in proposed Appendix N to 10CFR50,
" Standardization of N'.. clear Power Plant Designs; Licenses to Construct and Operate Nuclear Power Reactors of Dualicate Designs at Multiple Sites."
Presented herein are descriptions of site speciric aspects of design and demonstration that actual site parameters are cor.sistent with the design basis site parameters as described in the Wisconsin Utilities Project Standard PSAR.
The project schedule is based upon Unit No. 1 fuel loading in March 1987 and commercial operation in June 1987. Unit No. 2 is scheduled for fuel loading in March 1989 and commercial operation in June 1989.
1.1-1
WUP PSAR Amendment 20 RAVEN 2/79 1.2 GENERAL PLANT DESCRIPTION A general description of site unrelated aspects of plant design is provided in Section 1.2 cf the Standard PSAR. The genera.7 arrangement of the Haven Nuclear Plant is shown in the plot plan, Figure 1.2-1 of this Site Addendum. A general description of site characteristics is presented in Section 1.2.2 below.
1.2.2 Site Characteristics The Haven Nuclear Plant is located along the western shore of Lake Michigan in Sheboygan County. The site is approximately 625 acres, is about 5 miles north of Sheboygan, 56 miles north of Milwaukee, and 18 miles south of Manitowoc. The surrounding area is quite flat and is primarily farmland. Refer to Section 2.1 for additional information on site characteristics.
1.2-1
m i s > -..
J m . . . . , _
5f4vict raams.cene p t ea=s,onut e anc, l
g g % 1. s, ~ ,. I, %
( '
e I
$TORAGE -
O O D. O LJ Cop sta40s-d
- en# mat Sva r ose t.r evrE TeAWYWuE M Fi A( WAt(s es,
, WAaEHouSE A4 CaseG
/ \
r-
_y l__
l 4
.4 q, c .c W.1,
-4 l L- ]
a I z< ,u a .oa a uncs a 5
p_= =-
--====-e_m=we eem 6 aqye emmamiye .$m& mm A q a a f escas 8
- -____- e wat a mar ceaovt) f G *4t.t i i I)
I e I COP *Te Bolt.De**G Coht BVe L D' **
' l
. i l
1._____
,W
.i-j' ,,, %
e i
m ---- 1 Q- - , h I 'c_,
- - - c ==
c- E
,i ,unr s
C ,i
! N __
f a hl i ' 3 I
- - - - , i j; ritr a on
._ sq.-
m--
' i in I ,e . . . . .
L EC T R Cat
- 0AD*Av : ,
< r *< l, .e , $YA tm ruv4.ro ER im i l' >st IVIu8dl,
OC'E p e SHAF T
(**vrrg 8
<, *% '}&J S Ofwir* tp=' <t i
,- M. ._ # a.w.__2. , J =.sv
,,a.. ' * ??W **' , ll
)
- ll ,
FUEL MDeseG vf41 n,.
s OWY2
.u.n,.a.
- I z Uw 8
%._,,_,5 I
== l g,,,g,g iWC3%
4 j ;
a
, i i u.......a L...___.
, + .
i
____..____.3' y g a g. Q'
- -_ l _ _v+ e --A '"*'
- u 1 r: , s.,i-o, o : e f~ i '
/ ,
e_ . p ,
m- / ,,,,,
uccm
,. a ,4 - .
i e.
e rr.o. .,.1 ..., : - <: stawcr si
'l mosa, '
_ j
( f sman_zanam . ur no ._.sts o. sac
, PL M* %%l
__ .--um-s ium ' 'n= " ' ' _
g, u,
- .is
% s2e '
7 g
.e a :!
~ .... ., s
.. n l##*
..<***ts r ""~ ' * * ., vt..c.t ,
i
- u. . .I --- :< - >
3 . o a -
i + .e : i t OlOlO -
LJ U i 4 CJ g .- .- ,4 LO n!' L il E
~ v. o. , lm .'t- .y. ?. .
w,--- 3 -
e .ig *i .
st
., ve o..
s., cc - . . .. 4sus i
i
- i 4
-q p a
- ";;5"*5 J qf we s,
-h l j '
i i ;i 5 si .)
g l . .a s .
2 i,5 4 Ei. p'. :*7
\
. v -
o si:
f\.Wl b"" j I r-5 i
t . . ..x.s - : . r.-
i - 3,
- c. gg 3 1_ __.- , , e.u -r a u-
- h. ___. _____
lj it.. I--k 4 . ~- *
. , t :;
g -
n 1 is l t.m. -e.t. u m. a. w5 a g :- .
c -
. . .w uw -2 c.
\_ .s' rgM *7? :. a. ---
+,
l
- f
. . . . . , .i
_.e f. v'..:
I .
g 1
. .a m s. 2 - = p
.____ ____ l E .} h l!
sik e 3
J.___ ___ I i;
a
- 4
[<; 1;- l ,i -s ;
. tJ
/', ; ' =g %s4 3
/ i
. , a . .n3 [s < - - -
2 Cl
. . .w -/ ,y 's -
c.t sn 4.
' ... . 4
-, ie 11 , - c.4 !!; g; /
..q6 , p
'. d....<. E$ffPl . '
NNili " !
4 ,..e.I ;p; i g
v"~- ,o : i e
3 JN rot- l l <
g % : :i ?j :.
m it -c se >
-. L m.35:ts 'A .;
- ra :A - "4 mN ~ ;\ l r;-A a: 4 ;- --- - : ~
g .
m u- x r <_ _ , ' ,
V.s aft:r 2:
j--- tm ma .i - . . . - _ - - -.
m l .a. , pd
' ; y -._.1.
....<.'l)
- %w . w .-4..
~..
i 7
.t ,s . .
,,. n v.,. i. , ;
_- = 1 i
p
=g
..,.t.~e, r.-..
.g,.n .
,,v,=. '. . - _'?_;:0 , .= .
t
. 1-m
{ ; a.:. .
b
..,;g . &.r
_4. . ... / ,' .
. l 4
)i=l O' .' s.
j
,- - ,,' s . ' .
P ,,,,,,
ai / , [ ' ! p
/ '
- 4. j._l- g A _
s'm u, -
w h :
=~ ,
A a
__y 5- a t a x.L
, r u m ,.
, p 3a ;,_ ',:; ;
I
,"i r-l g_t lc iI
.v'*4
,- ~ s . . .~ . f i- g 1 g --
j p !
.,( ! m- ! u .,,,,
- .x..,, N ___h ~*, 5 s
d$g p/k.. s M]
' em = < '
. ., { l N I d '
l m . 5, %m Qs l _]
i ,., d .i.
mu ew,
- 1. .a.,
- - ::a.. --- - - " i
... - - - - , - - - - t.
' I I 4 :
,J
- - + - + - - - - - % IIO!O p lviv 6
%'?
l I ,,X.
_l 7,/
- x a.!
4 I ; g
==
~ OO, . -a I
t
/ HAVEN NUCLEAR PLANT FIGURE I.2 -1
/ PLOT PLAN W:SCONS:N UT! LIT lES PROJECT g c,T,. , ==. 2
".u u n"o PRELN! NARY SAFETY ANALYSlS REPCRT
, Y- *k,k m e- < ,= ~
M I. .l'v'{v,Y *
^
'" ""* , . rs se'w* me. 's uw AVENCVENT 20
WUP PSAR A:cendment 20 HAVEN 2/79 HAVEN SITE ADDENDUM LIST OF EFFECTIVE PAGES CHAPTER 2 Page, Table (T) or Revision Page, Table (T) or Revision Fiqure (F) Number Fiqure (F) Number Section 2.0 Section 2.2 2.0-1 19 2.2-1 thru 2.2-iii 20 2.0-11 15 2.2-1 thru 2.2-25 20 2.0-1 19 T2.2.1-1 thru 3 20 T2-1 (1 of 4) and (2 of 4) 15 T2.2.2-1 (6 sheets) 15 T2-1 (3 ot 4) 18 T2.2.2-2 20 T2-1 (4 of 4) 15 T2.2.3-1 20 T2.2.3-2 (4 sheets) 20 Section 2.1 T2.2.3-3 thru 12 20 F2.2.1-1 15 2.1-1 thru iv 19 F2.2.1-2 16 2.1-1 18 F2.2.1-3 and 4 15 2.1-2 and 2a 19 F2.2.1-5 thru 7 20 2.1-3 thru 6 16 F2.2.3-1 thru 5 20 2.1-7 19 2.1-8 thru 16 16 T2.1.2-1 15 Section 2.3 T2.1.2-2 (2 sheets) 19 T2.1.3-1 16 2.3-i/ blank 18 T2.1.3-1A thru 1F 16 2.3-111 and iv 1L T2.1.3-2 thru 4 16 2. 3-1v (a) 16 T2.1.3-5 and 6 18 2.3-v thru xviii 15 T2.1.3-7 16 2.3-xix 19 T2.1.3-8 (2 sheets) 16 2.3-xx and xx1 16 T2.1.3-9 and 10 16 2.3-xxii 18 T2.1.3-11 (2 sheets) 16 2.3-xxili 19 T2.1.3-12 (1 of 5) and 2.3-1 16 (2 of 5) 16 2.3-2 18 T2.1.3-12 (3 of 5) 19 2.3-3 16 T2.1.3-12 (4 of 5) and 2.3-4 18 (5 of 5) 16 2.3-5 thru 16 16 T2.1.3-13 16 2.3-17 thru 18 1J T2.1.4-1 (3 sheets) 15 2.3-19 thru 23 16 T2.1.4-2 (4 sheets) 15 2.3-24 thru 24c 19 T2.1.4-3 thru 5 15 2.3-25 thru 28a 19 T2.1.4-6 and 7 16 2.3-29 thru 34 18 F2.1.1-1 15 2.3-35 and 36 19 F2.1.2-1 18 T2.3.1-1 15 F2.1.2-2 19 T2.3.1-2 18 F2.1.2-3 18 T2.3.1-3 and 4 15 F2.1.2-4 19 T2.3.2-1 15 F2.1.3-1 thru 16 16 T2.3.2-1A 16 F2.1.3-17 and 18 18 T2.3.2-2 15 F2.1.3-19 15 T2.3.2-3 thru 14 18 F2.1.3-20 thru 22 16 T2.3.2-15 and 16 16 F2.1.4-1 15 +2.3.2-17 and 18 15 ti.3.2-18A thru 18G 16 T2.3.2-19 (2 sheets) 15 T2.3.2-20 thru 292 15 T2.3.2-293 18 T2.3.2.294 thru 322 15 T2.3.2-323 18 T2.3.3-1 thru 4 15 T2.3.3-5 (2 she sts) 15 T2.3.3-6 15 EP.2-1
WUP PSAR Amendment 20 HAVEN 2/79 HAVEN SITE ADDENDUM LIST OF EFFECTIVE PAGES (CONT'D)
CHAPTER 2 Page, Table (T) or Revision Page, Table (T) or Revision Piqure (F) Number Fiqure (F) Number T2.3.3-7 19 F2.4.5-2 (Delete Sheet) 19 T2.3.4-1 18 F2.4.13-1 thru 5 15 T2.3.4-2 18 F2.4.13-6 and 7 ~2 T2.3.5-1 18 F2.4.13-8 15 T2.3.5-2 thru 14 16 F2.4.13-9 18 T2.3.5-15 thru 18 18 F2.4.13-10 thru 15 15 F2.3.2-1 thru 15 15 F2.4.13-16 18 F2.3.2-16 thru 23 16 F2.3.2-24 thru 37 15 Section 2.5 F2.3.2-38 thru 40 16 F2.3.3-1 and 2 19 2.5-i thru iv 19 Y2.3.4-1 18 2.5-v 18 2.5-vi thru x 20 Section 2.4 2.5-1 and 2 18 2.5-3 thru na 19 2.4-i thru vii 20 2.5-5 thru 21 18 2.4-1 thru 17 2.5-22 and 22a 19 2.4-18 20 2.5-23 thru 26 20 2.4-18a and 18b 20 2.5-26a 20 2.4-19 19 2.5-27 thru 30 18 2.4-20 and 21 20 2.5-31 and 32 20 2.4-22 19 2.5-33 thru 43 18 2.4-23 thru 26 16 2.5-44 and 44a 19 2.4-27 thru 32a 18 2.5-45 thru 55 18 2.4-33 18 2.5-56 thru 58a 19 2.4-34 thru 38 20 2.5-59 thru 60b 19 2.4-39 16 2.5-61 thru 63 18 T2.4.1-1 16 2.5-64 and 64a 19 T2.4.1-2 15 2.5-65 and 66 19 T2.4.1-3 16 2.5-67 thru 68a 19 T2.4.1-4 and 5 15 2.5-69 thru 113 18 T2.4.2-1 and 2 16 2.5-114 19 T2.4.3-1 20 2.5-115 18 T2.4.3-2 (2 sheets) 16 T2.5.1-1 (2 sheets) 16 T2.4.3-3 (2 sheets) 16 T2.5.1-2 (3 sheets) 16 T2.4.3-4 16 T2.5.1-2A and 2B 16 T2.4.3-5 15 T2.5.1-3 (6 sheets) 19 T2.4.4-1 15 T2.5.2-1 (3 sheets) 16 T2.4.5-1 15 T2.5.2-2 (4 sheets) 16 T2.4.7-1 15 T2.5.2-3 (2 sheets) 15 T2.4.13-1 (29 theets) 18 T2.5.4-1 18 T2.4.13-2 15 T2.5.4-2 (2 sheets) 18 T2.4.13-3 (2 sheets) 15 T2.5.4-3 (33 sheets) 18 T2.4.13-4 (5 sheets) 18 T2.5.4-4 (2 sheets) 18 T2.4.13-5 (2 sheets) 18 T2.5.4-5 thru 7 18 T2.4.13-6 (2 sheets) 18 T2.5.4-8 (2 sheets) 18 F2.4.1-1 16 T2.5.4-9 thru 16 18 F2.4.1-2 thru 12 15 F2.5.1-1 and 2 16 F2.4.2-1 16 F2.5.1-3 (Delete Sheet) 16 F2.4.2-2 15 F2.5.1-3A 16 F2.4.3-1 15 F2.5.1-4 and 5 18 F2.4.3-2 16 F2.5.1-6 and 7 16 F2.4.3-2 (C1) thru (C12) 16 F2.5.1-7A 19 F2.4.3-3 thru 6 16 F2.5.1-8 and 9 (Delete F2.4.4-1 15 Sheets) 16 F2.4.5-1 15 F2.5.1-9A 16 EP.2-2
WUP PSAR Amendment 20 HAVEN 2/79 HAVEN SITE ADDENDUM LIST OF EFFECTIVE PAGES (CONT' D)
CHAPTER 2 Page, Table (T) or Revision Figure (F) Number F2.5.1-9B 18 F2.5.1-9C 16 F2.5.1-9D thru 9G 20 F2.5.1-10 and 11 16 F2.5.1-12 (Delete Sheet) 19 F2.5.1-12A and 12B 18 F2.5.1-13 and 14 18 F2.5.1-15 19 F2.5.1-16 thru 22 18 F2.5.1-23 thru 25 (Delete Sheet) 18 F2.5.1-26 and 27 18 F2.5.1-28 19 F2.5.2-1 thru 5 16 F2.5.2-6 19 F2.5.4-1 thru 6 18 F2.5.4-7 thru 9 20 F2.5.4-10 thru 33 18 F2.5.4-34 thru 41 (Delete Sheet) 19 F2.5.5-1 thru 2.5.5-5 18 F2.5.5-6 23 F2.5.5-7 18 F2.5.5-8 thru 10 20 F2.5.5-11 15 EP.2-3
WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.2' NEARBY INDUSTRIAL TRANSPORTATION AND MILITARY FACILITIES TABLE OF CONTENTS Section Title Page 2.2.1 Locations and Routes 2.2-1 2.2.1.1 Surface Traneportation 2.2-1 2.2.1.2 Air Transportation 2.2-2 2.2.1.2.1 Airports 2.2-2 2.2.1.2.2 Instrument Approaches 2.2-4 2.2.1.2.3 High and Low Altitude Airways 2.2-6 2.2.1.3 Military Air Traffic 2.2-7 2.2.2 Storage and Transportation of Hazardous Materials 2.2-7 2.2.3 Evaluation of Potential Accidents 2.2-8 2.2.3.1 Potential Accidents 2.2-9 2.2.3.1.1 Explosions 2.2-10 2.2.3.1.2 Flammable Vapor Clouds (Delayed Ignition) 2.2-11 2.2.3.1.3 Toxic Chemical Releases 2.2-13 2.2.3.1.4 Fires 2.2-15 2.2.3.1.5 Collisions with Service Water Pumphouse intake Structure 2.2-15 2.2.3.1.6 Liquid Spills 2.2-15 2.2.3.1.7 Aircraft Impact 2.2-16 2.2.3.1.8 Collapse of Onsite Structures 2.2-22 2.2-i
WUP PSAR Ianendment 20 HAVEN 2/79 SECTION 2.2 LIST OF TABLES Table Title 2.2.1-1 Largest Airports, 10-50 Miles from Haven 2.2.1-2 FAA Projections of Sheboygan County Memorial Operations 2.2.1-3 Sheboygan Airport Master Plan Projected Operations 2.2.2-1 Manufacturers - Sheboygan County 2.2.2-2 Frequent Shipments of Hazardous Chemicals by Nearby Industrial Facilities 2.2.3-1 Control Room chlorine Analysis, Maximum and Toxic Concentrations versus Time as a Function of Wind Speed 2.2.3-2 Site Hazard Evaluation Summary 2.2.3-3 Flammable Vapor Cloud Explosions 2.2.3-4 Impact of Onsite Bazardous Materials Frequently Transported by Rail 2.2.3-5 Target Area Information 2.2.3-6 Distribution of Skidding Distances in General Aviation Accidents, 1964 through 1975 2.2.3-7 Distribution of Impact Angles in General Aviation Accidents, 1964 through 1975 2.2.3-8 General Aviation Operations, 1964 through 1975 2.2.3-9 General Aviation Accidents versus Airport Proximity, 1964 through 1975 2.2.3-10 Cumulative Frequency Distribution of General Aviation Airport Accidents and increasing Angular Deviation from Runway 2.2.3-11 Cumulative Frequency Distribution of General Aviation Accidents over 5 Miles from Airport 2.2.3-12 Probability Estimates 2.2-11
NUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.2 LIST OF FIGURES Figure Title 2.2.1-1 Pipelines and Manufacturers 2.2.1-2 Pipelines in Site Area 2.2.1-3 Regional Transportation 2.2.1-4 Airports and Airways
- 2. 2 .1 -5 NOAA Approaches to Sheboygan Airport 2.2.1-6 Sheboygan Airport Projected Operations, 1974-2029 2.2.1-7 Nearest Airways and Minnow MOA 2.2.3-1 Two Unit Haven Plan Area and Shadow Area 2.2.3-2 Frequency Curve of Skid Distance for General Av2Ition Accidents 2.2.3-3 Frequency Curve of Radial Location for General Aviation Accidents 2.2.3-4 Frequency Curve of Angular Location for General Aviation Accidents 2.2.3-5 Frequency Curve of Radial Location for General Aviation Accidents beyond 5 miles 2.2-iii
WUP PSAR Amendment 20 IIAVEN 2/79 SECTION 2.2 NEARBY INDUSTRIAL TRANSPORTATION AND MILITARY FACILITIES 2.2.1 Locations and Routes Industrial and manufacturing facilities within a 10 mile radius of the Haven Nuclear Plant are located primarily in the Sheboygan urbanized area. The largest manufacturer in the area is the Kohler Company, located approximately 8 miles south-southwest of the plant in the village of Kohlerta),
Industrial and manufacturing facilities and pipelines within a 10 mile radius of the Haven Nuclear Plant are shown on Figure 2.2.1-1. Pipelines within the site area are shown on Figure 2.2.1-2.
Transportation facilities within a 10 mile radius of the Haven Nuclear Plant are shown on Figure 2.2.1-3.
Apart from various armed forces recruiting stations, there are no military facilities within a 10 mile radius of the Haven Nuclear Plant.
2.2.1.1 Surface Transportation A natural gas transmission system operated by the Michigan Wisconsin Pipeline Company, consisting of one 10-inch and two 6-inch lines carrying 114.5 million cu ft/ day at pressures ranging from 400 to 975 psi, passes within 4.8 miles of the plant. An 8-inch line operated by Wisconsin Public Service Corporation carrying 400,000 cu ft/hr of natural gas at 60 psig passes 3.7 miles southwest of the plant. No propane is carried or is anticipated to be carried in either of these lines.
Sheboygan Harbor, approximately 7 miles south of the plant, accommodates both foreign and domestic cargo ships carrying materials such as coal, stone, clay, petroleum products, lumber, and fish.
One municipal and two private terminals are together capable of handling three ships. The harbor has a channel 21 ft deep that is navigable for 5,000 ft, with a 25 ft deep turn basin.
Approximately 265,000 sq ft of open cargo storage are now being utilized. The following terminal facilities are available at the Sheboygan port:
- 1. The Municipal Wharf - 125,000 sq f t open storage, 740 f t wharf, 21 ft water depth.
2.2-1
WUP PSAR Amendment 20 HAVEN 2/79
- 2. Sheboygan Port and Warehouse Terminal Limited -
38,750 sq ft transit shed, open storage of 75,000 sq ft, 1,800 ft wharf, 21 ft water depth.
- 3. C. Reiss Coal Company - 65,000 sq ft open storage, 21 ft water depth, railroad siding.
I Additional port facilities are available approximately 18 miles north of the plant in the city of Manitowoc.
Rail service in the area is provided by the Chicago and North-western Railroad (CSNW) . The railroad line passes along the western plant boundary approximately 4,200 ft from the containment structures (2).
US Highway 141 and State Routes 23, 28, 32, and 42, and the city of Sheboygan are located within 10 miles of the plant. US Highway 141, with a heavy duty classification, crosses north-south approximately 1-1/2 miles west of the plant. County Highway LS carries a light volume of traffic within the western plant boundary. Heavily travelled State Route 42 approaches within 4 miles to the west (2). The extension of I-43, under construction approximately 1/2 mile west of 141 (about 2 miles west of the plant) , is expected to be completed in the early 1980's.
2.2.1.2 Air Transportation 2.2.1.2.1 Airports No airport beyond 10 miles from the plant is significant to plant safety as defined by the criteria of USNRC Regulatory Guide 1.70(3). Table 2.2.1-1 lists the largest regional airports, their distance from Haven, and the operations levels.
There are two airports w_ thin a 10 mile radius of the plant.
Bell's Airport is 2.7 miles south-southwest at 43048'43"N, 87045'20"WC*). Sheboygan County Memorial Airport is 8.1 miles southwest at 43046'10"N, 87051'05"WC5). These are shown on Figure 2.2.1-4. A small landing strip now located on the northern portion of the Applicants' property will be closed at the time of plant operation. Seaplane operations on Lake Michigan are rare in Sheboygan County, with an estimated 10 annual operations along the approximately 25 miles of shoreline.
There are no operations reported on Sheybogan Lake or Elkhart Lake (6).
Bell's Airport is a privately owned, nonpublic-use facility (7) with a 2,500 ft runway with no lights, instrument approaches to the airport, or services, such as fuel or maintenance, at the fieldCS). Based on reports to the State of WisconsinC8), three locally based aircraf t weighing under 2,000 lb conduct about 750 operations per year. A formula used by the State of Wisconsin (')
2.2-2
WUP PSAR Amendment 20 HAVEN 2/79 would estimate 520 nonbased (transient) operations if the facility were public. A nonpublic facility would have substantially fewer operations; but, for conservatism, it is assumed that there are 375 transient operations per year. The total number of operations is then 1,125 per year.
No growth in operations is projected for Bell's Airport. It is assumed that it will continue to serve only its immediate neighbors, and that it will continue to be operated in its current manner by the present or future property owners.
Sheboygan County Memorial Airport is a public airport operated by Chaplin Aviation and is the nearest public airport to the site.
This facility has two paved runways 3,600 and 5,000 ft in length.
The layout is shown on Figures 2.2.1-4 and 2.2.1-5. It is attended for 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> on Sundays and 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> other days, with pilot controlled night lighting (20). According to reports to the State of Wisconsince), there are 58 aircraft based at the airport, including three twin-engine turbojet aircraft, seven twin-engine piston aircraft, and 48 single-engine piston aircraft. The largest based aircraf t has an empty weight of 7,329 lb. The empty weights of seven aircraft exceed 3,000 lb and 40 are under 2,000 lb. The airport is served by Midstate Airline which flies Swearingen Metroliners, with a maximum gross weight of 12,500 lb(11), from Sturgeon Bay to Sheboygan to Chicago and return, for a total of 104 operations per week at Sheboygan(12). The total number of aircraft operations of all kinds at Sheboygan in 1977 was estimated by the state to be 42,500(6).
The airport has a practical annual capacity (PANCAP) of 181,600 operations annually and a practical hourly capacity (PHOCAP) of 104 operations under Visual Flight Rules (VER) or 10 operations under Instrument Flight Rules (IFR) .
Planned airport improvements over the next 20 years include a 400 ft extension to the northeast end of the 5,000 ft runway, followed by a 400 ft extension to the northwest end of the 3,600 tt runway (*). In addition, an instrument landing system (ILS) and an approach lighting system (ALS) are proposed to be installed to enable aircraft to use the airport during lower cloud ceiling and visibility conditions than is now possible.
These improvements should increase the safety of flight operations as well as the reliability of scheduled and nonscheduled service. The 5,400 ft primary runway will provide more adequate runway length for business jets as well as most commuter service aircraft, such as the Swearingen Metroliner (*).
It is believed that no significant change in the PANCAP will be associated with these improvements.
The level of future Sheboygan airport operations has been predicted to 19 ' by the FAA (Table 2.2.1-2) , and an independent prediction to .995 was prepared for the Airport Master Plan 2.2-3
WUP PSAR Amendment 20 HAVEN 2/79 (Table 2.2.1-3) . These predictions and Wisconsin Department of Transportation data on present and past operations have been used as into a basis for extrapolating projected operations at the facility the 21st century. Operation levels projected that f ar in the future are extremely tentative due to economic uncertaint'es.
However, if it is assuned that the present PANCAP will remain unchanged throughout the lif e of the Haven Nuclear Plant, the growth in total operations at Sheboygan County Memorial Airport would be as shown on Figure 2.2.1-6. A limit of 181,600 operations would be reached by approximately 2029 following some leveling off of growth as present capacity is approached.
Aircraft crash probability calculations have been based on aircraft operations expected through 2029.
2.2.1.2.2 Instrument Approaches There are three instrument approaches (ta) to the Sheboygan airport currently published by the National Oceanic and Atmospheric Administration (NOAA) (see Figure 2.2.1-5). Two utilize the Sheboygan Falls VOR radio navigational facility as the starting point for the instrument approaches to runways 21 and 3, and are accordingly designated VOR RWY 21 and VOR RWY 3, respectively. The third approach utilizes the Sheboygan Non-Directional Beacon (NDB) , another radio navigational facility, as the starting point for the instrument approach to runway 21, and is designated NDB RWY 21. The approaches shown on Figure 2.2.1-5 are more fully described below.
Description of the VOR RWY 21 Approach to Sheboygan Upon arrival over the VOR, which is 7.9 miles southwest of the Haven site and located at the Sheboygan airport, at or above 2,700 ft above mean sea level (msl) , the pilot intercepts the 023 deg radial outbound from the VOR. After 1 minute the pilot begins a " procedure turn" to the left (west) .
The purpose of the procedure turn is to redirect the airplane to head toward the VOR along the same radial but headed inbound, staying west of that radial at all times. It can take different forms; the usual form is:
- 1. Turn 45 deg to the left. Heading = 338 deg
- 2. Proceed for 1 minute in that direction.
- 3. Turn 180 deg to the right. Heading = 158 deg
- 4. Re-intercept the 023 deg radial and track inbound to the VOR. Heading = 203 deg At this point the pilot has maintained an altitude at or above 2,700 ft mal. Once re-established on the 023 deg radial inbound (heading = 203 deg), descent to the " minimum descent altitude" 2.2-4
WUP PSAR Amendment 20 HAVEN 2/79 (MDA) can begin. The MDA is a function of the airplane's maximum certified landing weight and its approach speed. At Sheboygan, the MDA is 1,200 f t msl or 454 ft above the airport for all categories of aircraft likely to use the airport. If the pilot can see the runway environment and is in a position, after reaching the MDA, to make a normal landing, the landing proceeds.
If these conditions are not met, flying at or above the MDA, the pilot proceeds to the " missed approach point" (MAP) , which is over the VOR, and executes a " missed approach" maneuver turning right to intercept the 223 deg radial from the VOR and climbing to 2,700 ft ms1. Once at 2,700 ft and established on the 223 deg radial, the pilot executes a left turn and proceeds directly to the VOR. The Chicago Air Route Traffic Control Center will then provide further instructions, usually to proceed to his alternate airport or begin another approach to Sheboygan.
Error Limits Positional information is displayed to the pilot in terms of angular deviation from the selected course by the course deviation indicator (CDI). The correct procedure is to maintain a centered CDI or "on-course" indication when not in a procedure turn. Experienced pilots maintain this with little deviation. A full scale deviation of 10 deg would disqualify an applicant for an instrument rating should it occur on the test flight.
Although the naximum permissible instrument error is 6 deg, an error of over 2 deg to 3 deg would be unusual due to frequent checks of the aircraft's VOR receiver required by Federal Aviation Administration regulations.
The altimeter must be calibrated within 2 years preceding any instrument flight. The maximum permissible instrument error is 35 ft at 3,500 ft indicated. As such it is very small and can be considered negligible. The pilot is expected to remain at or above the assigned floor. Thus, when the floor altitude is 2,700 ft mal, the actual altitude is at least 2,665 ft mal.
The VOR RWY 21 approach course is more than 3.0 miles from the plant. When closest to the site, the altitude would be over 2,665 ft msl (2,055 ft above the plant grade). On final approach, at or above 1,165 f t msl, the aircraf t is headed away from the plant. A total error of 6 deg in the course, which is an occurrence of low probability, would have its closest point of approach 2.3 miles from the plant.
Description of the VOR RWY 3 Approach to Sheboygan The VOR RWY 3 approach is analogous to the VOR RWY 21 except that the approach is executed to the southwest side of the airport along the 223 deg radial instead of the 023 deg radial. This can be seen by comparing sheets 1 and 2 of Figure 2.2.1-5. The MDA for this approach is 1,480 f t msl, 280 f t higher than for VOR RWY 2.2-5
WUP PSAR Amendment 20 HAVEN 2/79
- 21. Until the MAP is reached at the center of the runway, all maneuvers are southwest of the airport, and can present no possible hazard to the airport.
If the pilot executes a missed approach, a left turn is made to inte m nt the 023 deg radial outbound from VOR, while climbing to 2.200 ft. , r established on the 023 deg radial and at 2,700 ft mal, the pilot turns lef t and proceeds directly to the VOR. The Chicago Air Route Traffic Control Center provides further ins tructions .
Error Limits The missed approach procedure is performed along the same 023 deg radial used for VOR RWY 21. The 2,700 f t msl minimum altitude used for the procedure turn is also identical. Consequently, the statements on errors and closeness to the plant made for the VOR RWY 21 approach apply to the missed approach portion of the VOR RWY 3 approach.
Description of the NDB RWY 21 Approach to Sheboygan Upon arrival over the Sheboygan NDB, 8.1 miles southwest of the Haven site, at Sheboygan airport at or above 2,700 ft msl, the pilot intercepts and tracks along the 025 deg radial outbound.
Af ter 1 minute, the pilot begins a procedure turn to the left (west) . This is exactly analogous to the turn made in the VOR RWY 21 approach, except the intent is now to be inbt and on the 025 deg radial to the NDB (heading = 205 deg). Once on the radial, the pilot may descend to the MDA, which for this approach is 1,240 ft msl (494 ft above the runway). The pilot then proceeds toward the MAP, which is over the NDB, near the intersection of the two runways.
If the pilot cannot make a nc.rmal landing, the missed approach maneuver is to continue on the 205 deg heading from the NDB, climbing to 2,700 ft msl. Once at 2,700 ft msl, the pilot executes a left turn and proceeds back to the NDB for further instructions.
Error Limits The approach course passes more than 2.8 miles from the plant. A 6 deg error east of the approach course would still miss the plant by 2.1 miles.
2.2.1.2.3 High and Low Altitude Airways The charted airways which are closest to the plant are indicated on Figure 2.2.1-7. In addition, there is an uncharted direct route "near V217"(1*) which is believed to be along the east shore of Lake Winnebago. This is a more direct route for flights scuth out of Appleton. The centerlines of none of these routes 2.2-6
WUP PSAR Amendment 20 HAVEN 2/79 are within 10 miles of the plant. The low altitude airways extend 4 nautical miles on each side of their centerlines.
The high altitude jet route, J101, Green Bay to Milwaukee, is 25.4 miles west of the plant with a minimum altitude of 18,000 ft. This route had a peak day of eight flights in 1977.
Airway V217 is directly below J101, 25.4 miles west of the plant.
It had a peak day of 45 flights in 1977.
Airway V7 is located 11.0 miles west-southwest of the plant and carried 30 flights on its busiest day in 1977.
Airway V450, connecting Green Bay and Muskegon, is 22.2 miles northeast of the site. The peak 1977 day had 29 flights.
The direct route near V217 is estimated to be 29 miles west of the plant, and it carried seven flights on its peak day in 1977.
2.2.1.3 Military Air Traffic There is no scheduled military air traffic within 10 miles of the plant. Occasionally, National Guard helicopters land at Sheboygan County Memorial Airport (12).
There are no known military training routes within 50 niles of the plant (15,16). Two military jets were included in the data on peak daily traf fic for the high and low altitude airways (1* ).
There is a military operations area (MOA) designated MINNOW MOA over Lake Michigan offshore from the plant. At its nearest point, it is 8 miles from the plant. According to information informally supplied by the FAA, the area is used for air combat gunnery practice, air to air refueling, air counter measures missions (e.g. , flak drops) , etc . Electronic simulation is used for 99 percent of practices. There are about 142 aircraft believed to be using the area from time to time. The space was reported occupied by one or more aircraft for 564 hours0.00653 days <br />0.157 hours <br />9.325397e-4 weeks <br />2.14602e-4 months <br /> in 1977 with an average of 2.48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> per day of usage. The aircraft using MINNOW MOA are believed to be based at K.I. Sawyer A.F.B.
on Michigan's Upper Peninsula, Glenview N.A.S. near Chicago, and at Selfridge A.N.G.B. near Detroit. Therefore, access to the MOA should not be near Haven.
2.2.2 Storage and Transportation of Hazardous Materials Within an approximately 10 mile radius of the Haven site, a survey was made to locate potentially toxic or hazardous chemicals used by industry or transported in this area. The l industries contacted and chemicals used are listed in Table 2.2.2-1(17). Using Regulatory Guide 1.78, " Assumptions for Evaluating the Habitability of a Nuclear Power Plant Control Room during a Postulated Hazardous Chemical Release" as a guide, the 2.2-7
h'UP PSAR Amendment 20 HAVEN 2/79 storage and shipment of potentially hazardous chemicals are discussed below.
Storage of Potentially Hazardous Chemicals There is no offsite storage of any hazardous chemicals within a 5 mile radius. Onsite storage of chemicals is described in Section 9.5.8.2 of the PSAR.
Shipments of Potentially Hazardous Chemicals The majority of the industries surveyed are outside a 5 mile l radius of the plant site and are predominantly in Sheboygan and Sheboygan Falls. Shipments for these industries appear to arrive from the south (Chicago and Milwaukee areas) or into the port of Sheboygan. The port of Sheboygan receives barge and tanker l traffic of methanol and fuel oil. The low frequency of shipments, and the fact that most traffic on Lake Michigan generally comes from the south, diminishes the need for concern for this type of traffic.
Rail traffic on the Chicago and Northwestern line from Sheboygan through Manitowoc passes within 4,200 ft of the containment structures. Based upon survey information from the Chicago and Northwestern Railroad, the only hazardous chemicals shipped past the site at a frequency of greater than 30 shipments per year are chlorine and anhydrous ammonia. There are no TNT shipments.
lA survey of the industries in the Manitowoc area was also performed to determine possible traffic through the site from the south. The Heresite Chemical Company of Manitowoc is the only industry in this area that uses hazardous chemicals. Heresite l Chemical Co. presently receives phenol in 55 gallon drums.
Shipments of phenol are assumed to be transported on Route 141 passing approximately 1 mile west of the site. Due to increased steel costs, the drums have become uneconomical as a shipment container and a large tank is presently being constructed to provide storage. This new arrangement will require only four to five rail shipments per year, also within limits for infrequent shipments as defined in Regulatory Guide 1.78.
Chemicals used by industrial facilities in the area are provided in Table 2.2.2-1. A list of potentially hazardous chemicals with quantity, mode, and frequency of delivery is provided in Table 2.2.2-2.
2.2.3 Evaluation of Potential Accidents Potential accidents at the routes and locations discussed in Sections 2.2.1 and 2.2.2 do not present a hazard to the site.
The consequences of postulated explosions, flammable vapor clouds l (delayed ignition) , and fires neither exceed plant design bases nor approach the site.
2.2-8
WUP PSAR Amendment 20 HAVEN 2/79 The Chicago and Northwestern Railroadtra) has stated that 65 ton rail shipments of chlorine pass the site at a frequency of greater than 30 shipments per year. Analysis of postulated rail accidents involving chlorine shipments of this size revealed that redundant QA Category I chlorine detectors would be necessary.
Upon reaching chlorine levels at or above 5 ppm, these detectors will alarm and automatically isolate the air intake for the normal control room ventilation system and start the emergency ventilation system (Section 9.4.1) in the recirculation mode.
This action and the chlorine alarm allow the operator to perform protective actions which include the donning of self-contained portable breathing apparatus. One and one half to 2 minutes is sufficient time for trained operators to begin operating the breathing apparatus.
Saxt**) and the Technical Services Bulletin for Chlorine (20) state that short term exposures to concentrations of 15 ppm chlorine cause irritation of the throat; the Technical Services Bulletin (20) states that short term exposures to concentrations of 30 ppm chlorine are required to cause coughing, while exposure to 40 to 60 ppm is considered dangerous if breathed over 30 minutes. The American Conference of Government Industrial Hygienists (21) documents a case of chronic poisoning when 15 ppm chlorine are breathed, but over a period of years. From the analysis described in Section 2.2.3.1.3 and results presented in Table 2.2.3-1, automatic chlorine dete ction equipment, along with the portable breathing apparatus, adequately protects control room operators.
Consideration was given to the possibility that future shipments may be in excess of 65 tons. However, a probability analysis of an accident resulting in concentrations which would exceed 15 to 20 ppm within 2 minutes results in probabilities of 10-a to 10-9 events per year and, hence, does not constitute a basis for any additional modifications to the control room.
Accidents involving detonations of liquid and gaseous fuels are evaluated using the TNT equivalence of the hazard under consideration and acceptable relationships of blast overpressure versus distance.
Table 2.2.3-2 summarizes the site hazards analyses. l 2.2.3.1 Potential Accidents Design basis events external to the nuclear plant are defined as those accidents which have a probability of occurrence of greater than or equal to 10-7 per year and have potential consequences serious enough to affect the safety of the plant to the extent that 10CFR100 guidelines could be exceeded.
A number of accident categories have been considered to determine if they could be design basis events for the site. Each accident 2.2-9
WUP PSAR Amendment 20 HAVEN 2/79 was analyzed to determine if the effects of the postulated accident were severe enough to be considered as a design basis event. The evaluation has shown that the effects of postulated accidents are not limiting and they are not design bases for this site; therefore, no additional probability studies are required.
The basis for this conclusion is described for each of the following categories of events and is summarized in Tables 2.2.3-1, 2.2.3-3, and 2.2.3-4.
2.2.3.1.1 Explosions Accidents involving detonations of liquid and gaseous fuels are l
considered along waterways, roads, railways, airports, and at nearby industrial facilities.
l Water Transportation The internal traffic patterns of shipping to and from Wisconsin's ports shows that traffic is navigated in the central portion of the lake at considerable distances offshore (22). The immediate shore area in the vicinity of the site is listed as a caution area even for local anglers (17).
However, a hypothetical accident which considers the explosion of gasoline vapor has been performed. The St. Lawrence Seaway allows the use of oceangoing ships on the Great Lakes. For evaluation purposes, a tanker approximately 750 ft long and 34,000 tons (dead weight) has been assumed. Normally, tankers this size carry heavy fuel oil. Tankers of the 34,000 ton l classification draw 34 to 38 ft when loaded. The tankers are constructed with three rows of tanks across and 7 to 10 tanks in each row depending on the capacity and range from 16,000 to.
46,000 tons (dead weight) capacity.
The tanks in the center row are the largest and have twice the capacity of the side (wing) tanks (23). The largest center tanks are found in current designs and contain 74,000 cu ft(23,2*). A loaded tanker could not approach the shore as close as an unloaded tanker due to the shallow water near the site. Due to the explosive limits of gasoline vapor, the maximum hazard would occur it a tanker f ailed to properly purge and inert its tanks after unloading its cargo and had an accident while passing the plant. The tanker was assumed to ground and explode in 20 to 30 ft of water at a distance of approximately 4,300 ft from the safety-related structures located on shore.
Explosive concentrations of gasoline vapors in air range from 1.3 to 7.5 percent by volume (8',25). Using a 5 percent gasoline vapor (butane) in air mixture, the TNT equivalent is 800 lb TNT for approximately 10,000 cu ft of vapor / air mix. Assuming the largest tank (74,000 cu f t) detonates, the TNT equivalent would be about 5,920 lb.
2.2-10
WUP PSAR Amendment 20 HAVEN 2/79 An explosion of this magnitude would result in an ambient peak overpressure of 1 psi at about 800 ft from the tanker using the methodology and equations in Regulatory Guide 1.91, Rev. 1. The design basis of safety-related structures ( PSAR Section 3.3) is such that the postulated tank explosion will not impair the capability for a safe and orderly shutdowe of the plant.
Overland Transportation As discussed in Section 2.2.1, there are several highways in the area; the nearest is County Highway LS, passing 2,900 ft west of the containment structures, which has the potential to be used by propane trucks. Another road, State Route 141, with a heavy duty classification, passes about 1.5 miles west of the containment structures. The extension of I-43', approximately 2 miles west, which is expected to be completed in the early 1980's, should carry the majority of the traffic presently on Route 141. A rail line (Chicago and Northwestern) passes within 4,200 ft of the containment structures. The plant is sufficiently isolated from public highway facilities so that any blast wave created by a maximum probable explosive hazardous cargo for a single truck or for a single rail car would be less than the tornado design pressure (PSAR Section 3.3) for the region, even if such explosives were assumed to be transported near the site. Based on survey information received from the Chicago and Northwestern Railroad, there are no TNT rail shipments past the site. Also, any fires and related incidents, if they were to occur, would not interfere with the capability to safely shut down the plant because of the separation distance from public highways.
A hypothetical propane truck spill along County Highway LS with instantaneous and subsequent delayed explosions is evaluated in Section 2.2.3.1.2.
2.2.3.1.2 Flammable Vapor Clouds (Delayed Ignition)
Accidental release of natural gas from the Michigan Wisconsin Pipeline Company and the Wisconsin Public Service Corporation gas lines have been hypothesized to form unconfined vapor clouds. l After a postulated rupture, it is assumed that natural gas is released at a rate equal to the peak capacity of the pipeline.
It is further assumed that there is not an immediate explosion since the delayed ignition of a large cloud of the gas results in the worst case energy release. The natural gas in the pipelines is approximately 90 percent methane which, if released, would rise rapidly due to its buoyancy. However, in order to determine l the worst case effect of such a break, it is assumed that the gas is as dense as air and forms a flammable cloud which is blown l towards the site. This cloud is assumed to be entirely methane.
Meteorological conditions of Pasquill Stability Class F and a wind speed of 1 m/sec were chosen to maximize the extent of the cloud, consistent with Regulatory Guide 1.3 and 1.4 design basis meteorological parameters. Flammable vapor clouds are evaluated 2.2-11
WUP PSAR Amendment 20 HAVEN 2/79 using U.S. Bureau of Mines methods (26). The extent and incident overpressures and distance are provided in Table 2.2.3-3. Under these conditions the flammable cloud does not reach the site, and the overpressures resulting from a delayed ignition event are less than the dynamic wind pressure associated with the design basis tornado. Therefore, natural gas line breaks do not constitute a hazard to the site.
A spill of a 9,000 gal propane truck along County Highway LS west of the site has also been considered. In the analysis it is assumed that the entire amount of propane is available to continuously leak over a period of 24,000 seconds (6.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br />).
The resulting release is assumed to form an unconfined cloud in the direction of the site. The cloud is conservatively assumed to detonate once it is fully developed using the methods in Burgess and Zabetakis cz6) and the meteorological assumptions described above. Results are presented in Tables 2.2.3-2 and 2.2.3-3.
Under the stated conditions the flammable cloud does not reach the site, and the overpressure resulting from a delayed ignition event is less than the dynamic wind pressure associated with the design basis tornado. Therefore, a spill of a 9,000 gal propane truck along the county highway does not constitute a hazard to the site.
Using the methods and equations of Regulatory Guide 1.91, Rev. 1, the instantaneous release and detonation of the contents of a propane truck (9,000 gal) were conservatively analyzed. The 1 psi peak positive incident overpressure distance was calculated to be 2,029 ft. Since Highway LS is 2,900 ft from the nearest Category I structure, plant safety is unaffected by such an accident. This potential hazard has been conservatively overestimated since, in actuality, only about one-third of the liquid propane will flash-vaporize, and any srbsequent explosion would ignite the remaining spilled propane p.coducing a fire rather than a detonation.
Based on survey information from the Chicago and Northwestern Railroad, the frequency of liquid propane gas passing the site is less than that which warrants f urther evaluation by Regulatory Guide 1.78. However, the potential for delayed ignition of a flammable gas cloud from railcars was analyzed using the method developed by the U.S. Bureau of M.nes(26). For the analysis, a continuous release of flammable gas is assumed. The assumed release rates are the same as considered in the evaluation for toxic gases (Section 2. 2. 3.1. 3) . The resulting peak incident overpressures developed from such a delayed ignition are all less than 1.0 psi at the plant and do not exceed the design basis for the plant (PSAR Section 3.3).
Using the equations and methodolocy of Regulatory Guide 1.91, Rev. 1, the instantaneous release and detonation of the contents 2.2-12
WUP PSAR Amendment 20 HAVEN 2/79 of a propane railroad tank car (34,500 gallons) were conservatively analyzed. The 1 psi peak positive incident overpressure distance was calculated to be 3,175 feet. Since all Category I structures are beyond this distance, the plant would be unaffected by this postulated accident. This hazard has been conservatively overestimated since, in actuality, only about one-third of the liquid propane will flash-vaporize, and any subsequent explosion would ignite rather than detonate the remaining spilled propane.
The Bureau of Explosives has developed recommended practices for handling fires or spills and other dangerous articles in transportation. In cases where evacuation is recommended, the evacuation radius is less than the 4,200 ft separation distance available and evacuation is only recommended if large quantities of material are involved or if a fire becomes uncontrollable.
2.2.3.1.3 Toxic Chemical Releases In order to evaluate the potential effects of maximum con-centration and maximum concentration-duration accidents on control room habitability as identified in Regulatory Guide 1.78(27) toxic chemical releases from frequent shipments along the Chicago and Northwestern Railroad were evaluated. The materials in Regulatory Guide 1.78(27) that were considered (see Tables 2.2.2-2 and 2.2.3-4) and that were transported at a frequency which warranted further evaluation (18,27) were anhydrous ammonia (NH3 ) and chlorine (Cla) . The only onsite source that required evaluation was the fire protection system carbon dioxide (CO 2 ) containers (Section 9.5.1) . Table 2.2.3-4 also summarizes the results of the CO 2 analysis on control room habitability.
For the maximum concentration railroad accident, an instantaneous (puff) release of the entire contents of the tank car was assumed to occur at the closest point of approach to + ae site. For the onsite CO 2 accident, the distance to the control room intake was determined to be controlling. In these cases, only a part of the spilled material will immediately vaporize and form a cloud which could drift toward the control room intake. A flash coefficient (x) representing the fraction which immediately vaporized was determined for each material by relating the specific enthalpy (h) of the material before and after the spill, while taking into consideration the conditions under which each commodity was shipped. A 1 percent ambient dry bulb temperature of 870F was chosen as the temperature occurring during the postulated toxic chemical releases to add some conservatism to the flash coefficient calculations. Equation 2.2.3-1 represents the algorithm used to calculate the flash coefficient. These are listed in Table 2.2.3-4. Thus, h = xh before spill liquid vaporized + (1-x)hliquid spilled 2.2-13
WUP PSAR A=endment 20 HAVEN 2/79 The concentration outside the plant control room was calculated as a function of elapsed time after the postulated event, using a three-dimensional Gaussian diffusion model consistent with the methods presented in Appendix B of Regulatory Guide 1.78(27). A buildup inside the control room occurs since a total of 0.48 volume per hour (2,000 cfe) of outside air is drawn in through the normal air intake. The nor=al air intake is located at the rear of the control room toward the railroad, slightly above grade, at a distance of approximately 3,900 feet from the Chicago and Northwestern Railroad tracks (Figure 2.1.2-1) . In order to retain the conservative nature of this analysis, the control room intake was assumed to be located at ground level.
In analyzing the chlorine release, the control roo= is automatically isolated with a reduced air exchange rate of 0.06 volume per hour 10 seconds after the concentration reaches the 5 pp= detection limit outside the control roo=. The reduced air exchange rate of 0.06 volume per hour as given in Regulatory Guide 1.78(27) was assumed in the evaluation of the effects of continued air exchange during the passage of the toxic vapor cloud over the control roo=. The analysis also included a 5 percentile accident meteorology Pasquill Stability Class F, establishec from cnsite meteorological measurements, and a wake factor of 5.3 =2 representing the mini =um cross-sectional area of the railroad tank car. Both of these parameters are specified in Appendix B of Regulatory Guide 1.78(27). The peak concentration inside the control room for the lowest wind speed under consideration (0.5 meter per second) is listed in Table 2.2.3-4 Eased on the analytical results presented in Tables 2.2.3-1 and 2 . 2 . 3--4 , the design of the control room provides detection and auto =atic isolation of the intakes for chlorine (PSAR Secticns 6.-
and 9.a.1). The tcricity limit of CO 2 is never exceeded, while anhydrous ammonia does not pose a habitability hazard due to its rapid vertical rise in response to its buoyant nature relative to air.
l For the maximu= concentration duration <..:cident analysis, a meteorological condition of Fasquill Stability Class F with a 1 =/sec wind speed, as specified in Regulatory Guide 1.4, Revision 2tze), was applied. A constant-rate continuous leakage with 100 percent evaporation of the entire railroad tank car contents was assumed for a 24,000 second (6.67 hour7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br />) period.
This was based on a duration noted for a chlorine tank car accident (2*,30) and calculation of the release caprcity required by the specifications for tank cars (31). The calculated relief valve capacities generally allow the tank to co=pletely e=pty in a few hours if the pressure in the tank were maintained at the pressure at which the relief valve is rated and tested. The flow rate is established by empirical relations given in the tard: car specifications ( 31 ) which are based on the assu=ption that tl.2 entire surface area of the tank is maintained at 1,2000F. Under these conditions, sufficient relief capacity is provided to 2.2-14
WUP PSAR Amendment 20 HAVEN 2/79 prevent the pressure from reaching the test pressure of the tank.
If a fire at the tank were to develop as a result of the postulated accident, the flow rating would be developed slowly, even if the fire were to engulf the entire tank car. If a fire is not present, the normal tank pressure of approximately 0 to 30 percent of test pressure is still well below the relief valve start-to-dircharge pressure of approximately 75 percent of the tank design pressure. Even if the relief valve or rupture disk is opened, the flow rate will decrease rapidly. Failure of the tank rupture disk or relief valves is not considered likely, since these components are designed to withstard an acceleration of 20 g(32). Using these assumptions it can be seen that the concentration outside the control room could exceed the toxic limit for chlorine. However, the reduced air exchange of an isolated control room and the fresh air supply capable of being provided by the portable breathing apparatus available provides adequate operator protection.
I 2.2.3.1.4 Fires Fires from accidents at the facilities or transportation routes previously discussed do not endanger the safe operation of the plant due to the separation distance. To ensure the safety of the plant, onsite fuel storage facilities arc 3esigned in accordance with the applicable fire codes (see Sect i n 9. 5.1) .
2.2.3.1.5 Collisions with Service Water Pumphouse Intake Structure In the extremely unlikely event that a ship or barge were to collide with and completely incapacitate one of the service water intakes, plant safety would not be j eopardized. The other 100 percent capacity (for both units) intake is separated from the postulated damaged intake and would satisfy plant safety requirements.
2.2.3.1.6 Liquid Snills The service water intake structures are located in Lake Michigan, one approximately 3,300 it of fshore and the other approximately 4,300 ft offshore. The pumphouse/screenwell structure is located inland f rom the lake shoreline. Water is supplied from this facility to the service water, demineralized water, and cooling tower makeup systems. Service water is withdrawn from the bottom of Lake Michigan, thus minimizing the possibility of oil or other floating debris from entering the system. Potential sources of corrosive chemical spills, as discussed in Section 2.2.2, are remote from the site. Any release of corrosive chemicals will be sufficiently diluted by the lake such that concentrations in the service water will have no detrimental effect on plant systems.
2.2-15
WUP PSAR Amendment 20 HAVEN 2/79 2.2.3.1.7 Aircraft Impact General Methodology In order to evaluate the probability of an aircraft striking a critical structure of the plant, it is necessary to identify all flight operations in the vicinity, determine the operation frequency and historical crash rate for each type of aircraft, estimate the crash distribution relative to the locations of airport runways or airways, and factor in the size of both the critical structures and of the impact area which can be expected from the crash of the specific type of aircraf t.
The probability may be expressed by the approximate general relationship P = NARD (2. 2. 3 -2) where:
P = probability of aircraft collision with the " target" per year N = number of operations per year (landings /take-offs or overflights)
A = effective " target area" of the plant R = crash rate, specific to aircraft type and operation D = a density distribution function characterizing the crash location with respect to the runway or flight path Each term is defined and evaluated for each applicable type of aircraft (e.g., general aviation, air carrier, military fighter) and type of operation (airport related or overflight) . Using U.S. aviation statistics, the following steps are required:
- 1. Computing N: The number of aircraft operations currently performed and the number projected over the life span of the power plant are estimated for any airports, approaches, or airways identified as requiring analytical consideration.
- 2. Computing A: The effective " target" area presented by the Haven Nuclear Plant is a sum of three parts: the plan area, the shadow area, and the skidding area. The shadow area is a projection on the horizontal of the vertical face of a structure, using a typical angle of impact for a specific type of aircraft to determine the size of the " shadow.a The skidding area is the product of the typical skidding distance and the length of the side of the plant exposed to the aircraft.
2.2-16
WUP PSAR Amendment 20 HAVEN 2/79
- 3. Computing R: U.S. crash data for each type of aircraft are analyzed to yield crash rates. General aviation accidents are treated as a whole.
- 4. Computing D: By analyzing the distribution of accident location with respect to the end of the runway in terms of polar coordinates (r,0 ) for each aircraft type, a distribution function can be calculated for airport related accidents.
Separate analyses are conducted for those accidents occurring within 5 miles of the airport and those beyond 5 miles from the airport.
A similar analysis can be applied to in-flight accidents. A distribution function is calculated based on perpendicular distance from the crash location to the centerline of the air route.
Operations and Frequency (N)
The flight operations in the site vicinity are reviewed in Section 2.2.1. Most of the aircraft activity described in that section is well below the frequency of operation that the NRC has set as requiring analysista),
By inspection of Table 2.2.1-1, there are no airports with projected operations greater than 1,000 d2 movements per year beyond 10 miles from the site, where d is the distance in miles from the site.
The average seaplane operation on Lake Michigan could be less than 0.2 mile from the plant without exceeding 500 d2 This obviously will not happen with 25 miles of coast from which to choose.
Military pilot training flights in the vicinity are confined to the MINNOW Military Operations Area (MOA) . Since the area is not a practice bombing range, and the MOA is a minimum of 8 miles from the plant, a detailed analysis of operations within the MOA is unwarranted.
The centerlines of the high and low altitude airways shown on Figure 2.2.1-7, as well as the direct route near V217, are a minimum of 11.0 miles- from the plant. According to Section 3.5.1.6 of Regulatory Guide 1.70, Rev. 2, detailed analysis is not needed if the edge of the airway is more than 2 statute miles from the plant.
Operations at Sheboygan County Memorial Airport, which is 8.1 miles from the plant, currently exceed 500 d2, or 33,000 operations, designated as the level where Regulatory Guide 1.70, Rev. 2, states that a detailed probability analysis is required.
2.2-17
WUP PSAR Amendment 20 HAVEN 2/.79 Future operations are expected to increase as shown on Figure 2.2.1-5.
A detailed analysis of Bell's Airport, 2.7 miles away, is required because it is within 5 miles of the plant. The frequency and type of operations are discussed in Section 2.2.1.
Area of Impact (A)
The potential area of impact, or " target" area, in the Haven analysis is based upon the combined areas of all Category I structures.
The following structures contribute to the " target" area:
- Containment Structure
- Fuel Building
- Main Steam Valve Houses
- Auxiliary Building
- Safeguards Area
- Crble and Pipe Tunnels
- Service Water Pumphouse
- Control Building
- Diesel Generator Building and Fuel Oil Tanks (underground)
For simplicity as well as conservatism, all the area within the facade around the containment, auxiliary building, safeguards area, etc., is to be included in the plan area. The plant configuration is shown on Figure 2.2.3-1. The total plan area of these structures is shown in Table 2.2.3-5.
The critical structures are most exposed to general aviation approaching from the east, directly off the lake, when viewed in terms of potential shadow and skidding areas. The turbine building and cooling tower shield the critical structures f rom a significant portion of pou dble approaches from the west, and the critical structures are narrower in the east-west direction than in the north-south direction.
i Skidding Distance A representative skidding distance is defined or computed here for accidents during each of the aircraft operations possibly important to the Haven site. These are exclusively general aviation accidents.
The aircraft accident tapes (33) of the National Transportation Safety Board (NTSB) list skidding distance information for 3,508 fatal general aviation accidents during the period 1964-1975.
Table 2.2.3-6 displays the distribution of skidding distances.
It is noteworthy that the critical Haven structures begin only 70 to 185 ft from the top of the shore protection slope.
2.2-18
WUP PSAR Amendment 20 HAVEN 2/79 A plot of the cumulative fraction of accidents with stopping distances greater than or equal to a specific value, SD, is shown on Figure 2.2.3-2. An exponential curve is fit to the data points in piecewise fashion. This function, F (S D) , is
~
F (S D e D for SD I
~8 D/
0.56e for 75'<SD I '
O.25e ~bD ! for 375<SD1 925 (2.2.3-3) 0.045e -8D ! for 925<SD 1 3000' Integrating F(SD) between 0 and 3,000 yields a representative skidding distance of 126 ft.
Impact Angle The NTSB tapes contain impact angles for 1,121 fatal general aviation accidents. The distribution of angles is shown in Table 2.2.3-7. The probability density function listed is the fractional number of occurrences divided by the 10 deg interval width. A " weighted" impact angle is computed by applying a weighting factor to the probability density distribution. The factor is the inverse of the tangent of the impact angle (1/ tan &) which measures the projection of the vertical aspect of a structure onto the horizontal surface. The integral of the product of the weighting factor and the probability density function yields the ratio of the length of the horizontal projection to the height of the structure. If an integration is performed piecewise using the data of Table 2.2.3-7 and using the central angle of the 10 deg interval as representative, the result is 1.91. The corresponding impact angle is
& = tan 4(T = 28 degrees (2.2.3-4)
Shadow Area and Skidding Area The shadow areas associated with the above impact angles were computed graphically. The shadow areas are shown on Figure 2.2.3-1.
The skid area for general aviation was calculated assuming an approach from the east. The length of the side of the critical structures exposed to the aircraft is 941 ft. Added to this width is the width of half an aircraf t wing span on each end of the plant. The addition recognizes the nonpoint nature of the missile hitting the " target.' For general aviation, a 50 ft wing 2.2-19
WUP PSAR Amendment 20 HAVEN 2/79 span was used (most general aviation aircraft are smaller than this) ( 3 * ) to provide a total width of 991 ft.
The input data and the results of the target area calculation are contained in Table 2.2.3-5.
Accident Rates m)
General aviation accident statistics for the period 1964-1975 indicate a total of 2,750 fatal accidents with airport data, i.e., airport related. Of these, 84 accidents occurred beyond 5 miles of an airport (33). The total number of operations for this time period is estimated from several sources (35,as,37). Table 2.2.3-8 summarizes the data.
The accident rates corresponding to these two cases are:
2.15 x 10-6 crashes / operation, all accidents with airport data; 6.56 x 10-a crashes / operation, accidents with airport data beyond 5 miles.
Spatial Distribution Function (D)
The locations of accidents may be conveniently measured relative to the location of airports by using polar coordinates where r is the distance from the runway to the crash in miles, and 0 is the angle between the airport runway centerline and the radial line to the crash location.
The density distribution D may be assumed to be the integral of a product of a function of r, f (r) , and a function of 0, g ( 0) .
The function D (r,0) was derived for general aviation accidents with airport data both within and beyond 5 miles of the airport.
Table 2.2.3-9(33) gives the distribution of fatal general aviation accidents as a function of airport proximity (1964-1975). These data are plotted on Figure 2.2.3-3. An exponential
- fit to these points yielded the function e-r/1.57 Now, f (r) is the derivative of 1 minus this function or f(r) = 0.637e -r/1.57 (2.2.3-5)
In determining g (0) , 69 accidents were reviewed c as , s e ) . The data that were analyzed are shown in Table 2.2.3-10. The value plotted on Figure 2.2.3-4. The best fit exponential is e-gp grg -
so that the function g (0) is 0.020e -0/49.6 (2.2.3-6)
Because 0 has a maximum value of 180 deg, a constant factor is multiplied to g (0) so that its integration between 0 deg and 2.2-20
WUP PSAR Amendment 20 HAVEN 2/79 180 deg equals 0.5. The function D (r,0) for accidents within 5 miles of the airport becomes e -0/49.6 0.37 D(r,0) = e -#! ' (2.2.3-7) r For accidents beyond 5 miles it was assumed that there is a uniform distribution in 6. The function f (r) tas derived based on 51 accidents (sa,s') with radii distributed as in Table 2.2.1-11. These data are plotted on Figure 2.2.3-5.
The best fit exponential has the form e- (r-5) /4. 5 6 (2. 2.3-8) and the function D (r,0 ) is given by 0.034e - (r-5 ) /4. 56 _
r Probability of Impact (P)
It is assumed that Bell's Airport had 1,125 operations per year in 1977 and is expected to have the same in 2029 (N=1,125) . All flights were general aviation and, therefore, the " target" area of the plant PL) is 0.02077 sq ad. The general aviation crash rate, R, equals 2.15 x 10-6 crashes per operation for general aviation considering all accidents with airport data. The density distribution, D, for general aviation within 5 miles of the airport is e -0/49.6 0.37 D(r,0) = e ~#! * (2 . 2 . 3 -10) r or 0.00574 for Bell's Airport relative to the nearest target.
The probability in either 1977 or 2029 would therefore be P = 2.88 x 10-7 Sheboygan County Memorial Airport had 42,000 operations in 1977, all of which are considered general aviation (N=42,500) . The
" target" area UL) is again 0.02077 sq mi. Since the airport is over 5 miles away from the plant, the general aviation crash rate, R, equals only 6.56 x 10-a crashes per operation. The density function, D, for general aviation beyond 5 miles from the airport is 0.034 D(r,0) = e -(r-5)/4.56 (2.2.3-11) r or 0.00213 for Sheboygan relative to the nearest target. The probability of impact in 1977 was, thnp Scc 1, P= 1.23 x 10-7 2.2-21
WUP PSAR Amendment 20 HAVEN 2/79 In 2029, Sheboygan is expected to have 181,600 operations. If the crash rate and distribution characteristics are unchanged and if it is assumed that all operations are still considered general aviation, the probability will become P = 5,27 x 10-7 The results of Table 2.2.3-12 should i regarded as highly conservative. Some of the conservative assumptions have been mentioned before, but it is worth enumerating some significant ones.
- 1. The number of transient operations at Bell's Airport was assumed to be 70 percent of the number it would have been if it were a public airport. This should be very conservative.
- 2. Haven Nuclear Plant structures designed against tornado missiles (see PSAR Table 3 . 5. 2- 1) have significant capacity to resist impactive loads caused by light aircraft.
- 3. The skidding distance of an aircraft, as reported by accident investigations, is often the total distance over which wreckage is spread. A large fraction of the momentum would be dissipated over an appreciably shorter distance.
- 4. The direction of approach to the Haven Nuclear Plant was chosen to maximize the target area. No weighting of the various possible directions was performed.
- 5. In the event of an accident, the pilot usually has partial control of the aircraft. The pilot could be expected to attempt to maneuver the aircraft to impact in an open space, where the chances of survival are better, rather than toward the massive buildings of a nuclear plant.
It is believed that the cumulative effect of these and other assumptions makes the results shown in Table 2.2.3-12 acceptably low.
2.2.3.1.8 Collapse of Onsite Structures Structures important to safety, or whose failure would affect the safe shutdown of the plant, are designed to withstand the effects of natural phenomena as described in PSAR Section 3.1.2.2.
The possible collapse of the circulating water system cooling towers when subjected to tornado or seismic loading will not affect plant safety. The towers are located at a sufficient distance from the plant so that in the event of their collapse they will not strike any safety-related portion of the plant.
2.2-22
WUP PSAR Amendment 20 HAVEN 2/79 REFERENCES
- 2. Wisconsin Department of Transportation, Division of Highways.
County Transportation Maps for Sheboygan and Manitowoc, Public School Directory, 1969-1970.
- 3. Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, LWR Edition, NUREG-75/094, Regulatory Guide 1.70, Rev. 2, USNRC, September 1975, p 2-6, 3-8.
- 4. Sheboygan County Memorial Airport, Airport Master Plan, Summary Report, Donohuet Associates, Inc., Sheboygan, WI, 1976.
- 5. FAA Form 5010-2 describing Bell's Airport, dated June 13, 1972.
- 6. Personal Communication: Mr. J.A. Koslosky, Bureau of Aeronautics, State of Wisconsin, Madison, WI, September 20th and 28th, 1978.
- 7. Sectional Aeronautical Chart, 'icago. National Oceanic and Atmospheric Administration, U.S. Department of Commerce, 14th Edition, May 1977.
- 8. Report 61-008-25-01, Division of Aeronautics, Department of Transportation, State of Wicconsin, September 1, 1978, p 481-488.
- 9. Letter from Wisconsin Department of Transportation to D.
Lemieux, Stone & Webster, February 4, 1974 with attached formulas for estimating operations at Wisconsin Airports.
- 10. AOPA's Airports USA, 1977. Aircraft Owners and Pilots Association, Washington, D.C., 1977, p 524.
- 11. Personal Con:munication : Mr. R. heindorf, Midstate Airline Operations, Chicago, November 7, 1978.
- 12. Personal Communication: Mr. H. Chaplin, Manager, Sheboygan County Memorial Airport, September 21, 1978.
- 13. Sheboygan County Memorial Approach Plates (VOR RWY21, VOR RWY3, NDB RWY21) . National Oceanic and Atmospheric Administration, U.S. Department of Commerce, September 21, 1978.
- 14. Personal Communication: Mr. W. Olson, Federal Aviation Administration, Great Lakes Region, Des Plaines, Illinois, September 27, 1978.
2.2-23
WUP PSAR Amendment 20 HAVEN 2/79
- 15. Area Planning AP/1B Chart, Military Training Routes - Eastern U.S., Defense Mapping Agency Aerospace Center, St. Louis Air Force Station, Eff ective October 6, 1977.
- 16. Area Planning AP/1B Chart, Military Training Routes - Central U.S., D.M.A.A.C., St. Louis Air Force Station, Effective October 6, 1977.
- 17. Sheboygan Angler, 1977.
1R. Personal Communication : F. Steffen, Chicago S Northwestern Railroad to B. Mehraan, Stone & Webster Engineering Corporation, November 13, 1978.
- 19. Sax, N.I. Handbook of Dangerous Industrial Materials, 3rd Edition, 1968, p 791.
- 20. Canadian Industries Limited. Technical Service Bulletin for Chlorine.
- 21. American Conference of Government Industrial Hygienists.
Documentation of the Threshold Limit Values for Substances in Workroom Air, 3rd Edition, 1971.
- 22. Wisconsin's Great Lake Ports: Alternative State Policy Options, 1976.
- 23. Society of Naval Architects and Marine Engineers. Essential Characteristics for Group of Tankers Ranging from 25,000 to 106,000 Deadweight Tons, Volume 68, 1960, p 804.
- 24. Personal Communication: Mr. R.L. Ladd, U.S. Coast Guard, Measurement Division, Customs House, Boston.
- 25. Perry, J.H. Chemical Engineers Handbook, 1950, p 1868.
- 26. Burgess, D .S . and Zabetakis, M.S. Detonation of a Flammable Cloud of a Propane Pipeline Brea'., U.S. Department of the Interior, Bureau of Mines Repsrt of Investigations RI 7752, 1973.
- 27. Nuclear Regulatory Commission, Regulatory Guide 1.78, Office of Regulatory Standards, June 1974.
- 28. Nuclear Regulatory Commission. Regulatory Guide 1.4, Revision 2, Office of negulatory Standards, 1974.
- 29. Accidental Episode Manual, Resources Research, Incorporated, 1972.
- 30. Howerton, A.E. Estima'ing the Area Affected by a Chlorine Release, American Chlo- Tnstitute, 1967.
2.2-24
WUP PSAR Amendment 20 HAVEN 2/79
- 31. Association of American Railroads, Specifications for Tank Cars, Effective November 1, 1974.
- 32. GATX Tank Car Manual, 3rd Edition, General American Transportation Corporation, 1972.
- 33. National Transportation Safety Board Aircraf t Accident and Reporting System. Stone & Webster Computer Program EN-96.
- 34. Jane's All the World's Aircraf t. J.W.R. Taylor (Ed .) , Jane 's Yearbooks, Iondon (Annual) .
- 35. FAA Air Traffic Activity. Calendar Year 1976, U.S.
Department of Transportation, Federal Aviation
'.dministration, Office of Management Systems, Information and Statistics Division, December 31, 1976.
- 36. Personal Communication: Mr. Gene Mercer, Federal Aviation Administration, Washington, D.C., March 27, 1978.
- 37. Aviation Forecasts - Fiscal Years 1977-1988. FAA-AVP-76-17.
Federal Aviation Administration, U.S. Department of Transportation, September 1976, p 59-73.
- 38. Notes taken at the Offices of the National Transportation Safety Board, Nashington, D.C. from air carrier and general aviation accident files. C.D. Miller, March 15-16, 1978.
- 39. Data collected at the National Transportation Safety Board Offices, Washington, D.C., K. Scribner and Y.C. Chang, 1974.
- 40. Sectional Aeronautical Chart, Green Bay. National Oceanic and Atmospheric Administration, U.S. Department of Commerce, 14th Ed, August 1977.
- 41. Terminal Area Forecast, 1977-1987. FAA-AVP-76-5. Federal Aviation Administration, U.S. Department of Transportation, January 1976, p GL30-GL35.
2.2-25
NUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.1-1 LARGEST AIRPORTS, 10-50 MILES FROM HAVEN Approximate Fiscal Yr Fiscal Yr Airport Distance (d)
- 1977 1987 1000 and City f rom !!aven( 7,
- 0 3 Operations Operations (*83 de Outagamie County Appleton, WI 48 mi 55,000 125,000 2,304,000 Austin-Straubel Green Bay, WI 48 mi 89,000 106,000 2,304,000 Manitowoc Municipal Manitowoc, WI 20 mi 22,000 47,000 400,000 Wittman Field Oshkosh, WI 42 mi 131,000 299,000 1,764,000 NOTE:
- d is the distance in miles from the airport to the Haven Nuclear Plant.
1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.1-2 FAA PROJECTIONS OF SHEBOYGAN COUNTY MEMORIAL OPERATIONS (*33 Actual Operations (000) FY1975 FY1977 FY1978 FY1979 FY 1982 FY1987 Air Carrier 0 0 0 0 0 0 Air Taxi 7 8 9 10 13 21 Itinerant 24 27 30 33 41 58 Total 35 40 44 48 60 85 Instrument Approaches 728 855 943 1031 1306 1922 1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.1-3 SHEBOYGAN AIRPORT MASTER PLAN PROJECTED OPERATIONS ( * )
Operations (000) 1973 1960 1985 1995 Single Engine Piston 31.3 38.8 47.0 59.0 Multi-Engine Piston 3.9 6.8 12.0 21.0 Turbo Prop 1.G 6.3 11.0 19.0 Jet 0.8 2.0 3.0 6.0 Other 0 1.5 1.5 3.0 Total 37.0 55.4 74.5 108.0 1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.2-2 FREQUENT SHIPMENTS OF HAZARDOUS CHEMIOLLS BY NEARBY l INDUSTRIAL FACILITIES Chemical Shipment Type Quantity Frequency Methanol Lake Barge 30,000 7 to 9 shipments barrels per year Phenol Truck 75-55 gallon 7 shipments per drum year Natural Gas Pipeline 4.0 x 105 ft3 Continuous l per hour Natural Gas Pipeline 114.5 x 106 Continuous l ft3 per day Chlorine Rail 65 tons Greater than 30 shipments per year Anhydrous Rail 33,500 Greater than 30 Ammonia gallons shipments per year 1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-1 i CONTROL ROOM CHLORINE ANALYSIS
- MAXIMUM AND TOXIC CONCENTRATIONS VERSUS TIME AS A FUNCTION OF WIND SPEED Wind Speed (met ers/sec) *
- 0.3 0J M M M M M M M M M M Time to Reach 15 ppm (sec)
- 350 230 180 150 130 120 110 10 0 90 90 NA NA Time to Reach 20 ppm (sec) **
- 370 250 200 170 150 130 130 NA NA NA NA NA Time to Reach Maximum Concentration (sec) *** 940 580 420 320 270 220 200 180 150 130 120 110 Maximum concentration (ppm)**** 112 67.3 48.1 37.5 30.7 26.0 22.5 19.9 17.8 16.1 14.1 13.5 NOTES:
- Based on rail shipnent capacity of 65 tons
- Accident meteorological conditions of Pasquill Stability Class F were assumed and the wind speed was varied in arder to maximize the control room concentrations (see Regulatory Guide 1.78, Appendix B) . The peak concentration inside the control room occurs with a wind speed of 0.3 meter per second.
m Time refers to the time period after detection of control room normal intake (af ter ambient concentration rrw Tes 5 ppm) until time stated. All times listed are to the nearest 10 second iteration.
- Flash coefficients (Table 2.2.3-4) were applied to the control room concentration evaluation (instantaneous r 4 ease of entire tank contents). Control room concentration is based on a 0.48 volume per hour air exchange rate, followed by a reduced air exchange rate of 0.06 volume per hour 10 seconds af ter 5 pga is reached outside the control roorn. No credit was allowed for chlorine removal by the emergena ventilation system.
1 of 1
WUP PSAR Amend:r.ent 20 HAVEN 2/79 TABLE 2.2.3-2 l SITE HAZARD EVALUATION
SUMMARY
Distance to Direction Basis for Conclusion Potential Site from That the Hazard Need Ha zard (mi) Site Not Be Considered
- 1. Explosions - -
- a. Water l
Trans-portation Gasoline 0.8 E A 1 psi peak reflected Ship overpressure occurs 34,000 ton approximately 800 feet from the ship.
- b. Overland l Transpor-tation County 0.53 W Based on Reg. Guide 1.91, Highway LS quantities for truckload and railroad shipments of TNT, the peak reflect-ed overpressure of 1 psi would be approximately 1,700 feet and 2,100 feet away from the respective source.
Route 141 1.5 W Chicago S 0.8 W North-western Railroad
- c. Adjacent There are no industrial Industrial sources of explosives Facilities within 5 miles of the site.
1 of 4
WUP PSAR Amendment 19 HAVEN 11/78 TABLE 2.2.3-2 (CONTop}
Distance to ... action Basis for Conclusion Potential Site from That the Hazard Need Hazard (mi) Site Not be Considered _
- 2. Flammable Vapor Clouds (delayed ignition)
- a. Michigan 4.8 W An incident overpressure Wisconsin of 1 psi extends only Pipeline 3,640 feet from a break.
Company-one 10 inch and two 6 inch natural gas pipelines carrying 114.5 million cubic feet per day
- b. Wisconsin 3.7 SW An incident overpressure Public of 1 psi extends only Service 930 feet from the break.
Corporation-one 8 inch natural gas pipei.ne carrying 400,000 cubic feet per hour
- c. 9,000 gallon 0.53 W An incident overpressure propane of 1 psi extends only truck 380 feet from the truck spill for delayed ignition or along 2,029 feet from the county truck for a puff release road and detonation.
2 of 4
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-2 (CONT
- D)
Distance to Direction Basis for Conclusion Potential Site from That the Hazard Need Hazard (mi) Site Not Be Considered
- d. 34,500- 0.80 W An incident overpressue Gallon of 1 psi extends 3,175 Propane feet from the truck for Railroad a puff release and deto-Tank Car nation.
Spill
- 3. Toxic Chemi-cals
- a. Chicago 4,200 feet W See Tables 2.2.3-1 and and North- 2.2.3-4 western Railroad
- b. US Highway 1.5 W Phenol is not considered 141 (nex+ a hazard as it is nor-largest mally shipped in dry form.
route is With respect to quantity State and distance, the Chicago Highway and Northwestern source 42-4 represents a more severe miles from case.
the site) 75 55-Gallon !
Phenol Druns
- 4. Fires - - There are no adjacent industrial or chemical plants.
- 5. Collisions with Intake Structure
- a. Ships or - - The service water system Barges has redundant and sepa-rate intake structures.
3 of 4
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-2 (CONTap}
Distance to Direction Basis for Conclusion Potential Site from That the Hazard Need Hazard (mi) Site Not Be Considered
- 6. Liquid The service water s: stem Spills has redundant and sepa-rate submerged intake structures. Spills would also be diluted in the lake.
- 7. Failure of The cooling towers are Cooling far enough from safety-Towers related structures to prevent damage follow-ing tower collapse.
- 8. Aircraf_t, Crash
- a. Bell's Air- 2.7 SSW Table 2.2.3-3 port
- b. Sheboygan 8.1 SW Table 2.2.3-3 County Memorial Airport NOTE:
- Evaluation was performed using Regulatory Guide 1.78 as a basis.
4 of 4
WUP PSAR Amendment HAVEN 2/79 TABLE 2.2.3-3 l
FLAMEABLE VAPOR CIDUD EXPLOSIONS Extent of Equivalent Flammability Flannable Blast TNT Extent of Incident Postulated Source Limits in Air Cloud Equivalent Overpressure Icnition Source (cf s) (V %) (m) (KT) (1.0 psi Isopleth)
- 1. 9,000-gal propane spil) on County Higi.vay LS Delayed ignition 13.4 2.8-7.0 65 0.000077 380 it Puff release -
1.8-7.0 -
0.0458 2,029 f t
- 3. Wisconsin Public Service 111 5.3-14 155 0.0012 930 ft pipeline break (delayed ignition)
- 4. 34,500 gal propane -
2.8-7.0 -
0.176 3,175 ft railroad tank car on Chicago railroad (puf f release) 1 of 1
WUP PSAR Amendment 20 IIAVEN 2/79 TABLE 2.2.3-4 IMPACT OF ONSITE HAZARDOUS MATERIALS FREOUENTLY TRANSPORTED BY RAIL Control Maximum Room Duration Recorr. mended Released Evacuation Gaseous Toxicity DOT Maximum Concentration Quantity Limit Section No./ Flash Concentration
- Outside** Radius ***
Hazardous fppm) fft)
(q) (ppm) Cla ssif ication (bef f icient fppm)
Material Anhydrous Ammonia 7.97x107 100 173.314/Non FE 0.2162 0**** 0**** -
111 350 2,500 Chlorine ***** 5.90x107 15 173.314/Non FG 0.2206 1.47x107 10,000 Not Applicable 0.5366 423 1,540 -
Carbon Dioxide NOTES:
- Accident meteorological conc cions of Pasquill Stability Class F were assumed and the wind speed was varied in order to maximize the control room concentrations. The peak concentration inside the control room occurs with a wind speed of 0.3 meter per second.
- Maximum duration accidents were evaluated by assuming that entire tank contents were released in 24,000 seconds. The steady state outside air concentration is listed in ppm. Pasquill stability Class F and 1 meter per second wind speed were assumed.
- ** Recommended evacuation distance by the U.S. Bureau of Explosives
- Results from buoyant nature cf anhydrous ammonia
- Flash coef ficients were applied to the maximum control room concentration evaluation only (instantaneous release of entire tank contents) . Maximum control room concentratior is based on a 0.48 volume per hour air exchange rate, followed by a reduced air exchange rate of 0.06 volwce per hour, 10 seconds af ter 5 ppm is reached outside the control room. No credit was allowed for chlorine removal by the emergency ventilation system.
NUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-5 TARGET AREA INFORMATION Aircraft Type: General Aviation (all)
(Operatior.)
Plan Area (f t2) : ~73,000 Shadow Area (f t2) : 181,000 Frontal Exposure of Plant (f t) : 991 Skidding Distance (f t) : 126 Skidding Area (ftz) : 125,000 Total Target Area:
fta - 579,000 mir - 0.02077 1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-6 DISTRIBUTION OF SKIDDING DISTANCES IN GENERAL AVIATION ACCIDENTS 1964 THROUGH 1975 Range of Range of Distance (ft) Number of Distance (ft) Number of Sg Occurrences Sg Occurrences 0-50 2,129 1201-1300 4 51-100 391 1301-1400 2 101-150 262 1401-1500 4 151-200 175 1501-1600 1 201-250 136 1601-1700 0 251-300 109 1701-1800 0 301-350 58 1801-1900 1 351-400 40 1901-2000 2 401-450 40 2001-2100 2 451-500 33 2101-2200 1 501-550 10 2201-2300 1 551-600 32 2301-2400 0 601-650 9 2401-2500 1 651-700 14 2501-2600 0 701-750 8 2601-2700 0 751-800 8 2701-2800 1 801-850 2 2801-2900 0 851-900 10 2901-3000 1 901-950 6 -
951-1000 5 -
1001-1100 3 -
1101-1200 7 5801-5900 1 Total 3,508 1 of 1
WUP PSAR Arrendment 20 HAVEN 2/79 TABLE 2.2.3-7 DISTRIBUTION OF IMPACT ANGLES IN GENERAL AVIATION ACCIDENTS 1964 THROUGH 1975 Number of Range of Angles Occurrences in Probability Weighting (degrees) 10 Degree Interva.ls Density Function Factor 0-10 103 0.0092 11.430 11-20 51 0.0045 3.732 21-30 134 0.0120 2.145 31-40 46 0.0041 1.428 41-50 209 0.0186 1.000 51-60 185 0.0165 0.7002 61-70 51 0.0045 0.4663 71-80 96 0.0086 0.2679 81-90 246 0.0219 0.0875 1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-8 GENERAL AVIATION OPERATIONS, 1964 THROUGH 1975(as,3s,a7)
Total Operations at Calendar Operations at Towered and Non-Towered Year Towered Airports (000) Airports (000) 1964 23,020 63,945 1965 26,573 73,814 1966 33,445 92,903 1967 37,223 103,397 1968 41,567 115,464 1969 41,957 116,547 1970 41,384 114,956 1971 40,401 112,225 1972 38,172 115,400(37) 1973 41,363 114,897 1974 43,124 125,700(37) 1975 45,297 130,700C37)
NOTE:
References 36 and 37 indicate that nontowered general aviation operations constituted, conservatively, 64 percent of all operatiots for the period 1972-1977. This percentage was used to compute t.ue total column for years with no indicated reference.
1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-9 GENERAL AVIATION ACCIDENTS VERSUS AIRPORT PROXIMITY 1964 THROUGH 1975 Number of Fatal Accidents With Airport Without Airport Proximity Total Data Data In Traffic Pattern
- 685 673 12 Within 1/4 mi 302 296 6 Within 1/2 mi 242 237 5 Within 3/4 mi 90 90 1 Within 1 mi 242 242 0 Within 2 mi 438 427 11 Within 3 mi 328 324 4 Within 4 mi 267 263 4 Within 5 mi 117 115 2 Total within 5 mi 2,711 2,666 45 Total beyond 5 mi 3,640 84 3,556 Total 6,351 2,750 3,601 NOTE:
- For purposes of analysis, those accidents in the " traffic pattern" were distributed among the other categories (as their precise location is unknown). This is accomplished as follows for accidents with airport data:
There are eight other categories and 673 = (84 x 8) + 1.
Therefore, after distribution the totals are:
Within 1/4 mi = 85 + 296 = 381 Within 1/2 mi = 84 + 237 = 321 Within 3/4 mi = 84 + 89 = 173 Within 1 mi = 84 + 242 = 326 Within 2 mi = 84 + 427 = 511 Within 3 mi = 84 + 324 = 408 Within 4 mi = 84 + 263 = 347 Within 5 mi = 84 + 115 = 199 1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-10 CUMULATIVE FREQUENCY DISTRIBUTION OF GENERAL AVIATION AIRPORT ACCIDENTS AND INCREASING ANGULAR DEVIATION FROM RUNWAY Angle,0 , from Runway Center Cumulative Fraction of Accidents Line (Degrees) with Angular Deviation 2 0 0 69/69 = 1.0 10 50/69 = 0.72 20 37/69 = 0.54 30 30/69 = 0.43 40 29/69 = 0.42 50 25/69 = 0.36 60 22/69 = 0.32 70 22/60 = 0.32 80 19/69 = 0.28 90 17/69 = 0.25 1 of 1
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-11 CUMULATIVE FREQUENCY DISTRIBUTION OF GENERAL AVIATION ACCIDENP OVER S MILES FROM AIRPORT 7 Cumulative fraction 2 7 5 51/51 = 1.0 6 47/51 = 0.92 7 38/51 = 0.75 8 28/51 = 0.55 9 22/51 = 0.43 10 20/51 = 0.39 11 16/51 = 0.31 12 14/51 = 0.27 13 11/51 = 0.22 14 7/51 = 0.14 15 6/51 = 0.12 20 3/51 = 0.06 25 2/51 = 0.04 1 of 1 ,
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 2.2.3-12 PROBABILITY ESTIMATES Annual Probability Airport Year Operations (Collisions /Yr)
Bell's 1977 1,125 2.88 x 10-7 Bell's 2029 1,125 2.88 x 10-7 Sheboygan 1977 42,500 1.23 x 10-7 Sheboygan 2029 181,600 5.27 x 10-7 1 of 1
^
A.o. 2 SHEBOYGAN COUNTY MEMORIAL VOR RWY 21 ^'-5 2 " ('^^ ) 5 =ma" *6m~5:~
CHICAGO CENT 1R 125 7 306.3 pcN$' ~ % manif 0 WOC A lq* y
! s
- . N
/ we
/ 5Hh05H 0
- \-
/
\
.m
.~ .F
\
l l &"a F ALL5
{
' @A io, . FAH i!-:-
'A 1456 /' - 914 1100 1
\ +# l j
Ob+o a els.ecer een ag on UNICOM 1
N y 22 o, w,8.o,...
ee. o.e . '
hene ao'.o.o.ioWe.
,e a o,,4 wie Geeea gi' ..e4 o,,
% /
saew h y$
y* /
N /
N . _l c ae a min $AFE ALT 75 NM 2600 M55tD APPROACH yon Remo* 7O 203* k Ct.mbeae **ehwra o 2700 we'ha 10 NM FAH VOR on R 223 F AH voa 'ee'u.c
- F AH VOE oad held 02y 70 ,
2700 9
%, 203 #
~
~ .. / c .i CATEGOeY A 8 C D 5 21 1200 1 454tS00ii 12
,g 1l.
1 3 2 cinctiNG 120051 45. ,3oo i,
,2 j,30 ,,
- c. .. . ., _.. _ e... s . .. e . ..._ o 1400-144 1400-2'4
- 52' 1400-1 6*4 7ac i, SEIL R.y 21 e,4a700 It.4 654 7002 .
t 400134 " ' * * " 3 2 ' * * * ' 3 3 '
1400-2 cinctiNo 14001 63 , oo ,
,,, roo , 8. , . , . 7x ,' ..
- *<vo.e M.h t A . , 3 .' l oeia e ; J i I .' 2 g E ao'n 60 90 I120 f 150 180 a . s., e , i ,
~ ~re v VOR 2'""'"*
RWY 21 <> a~-arSr*
s
...u.,,.. . -. co .,ic,,H{gpYG AN COUNTY MEMORIAL HAVEN NUCLEAR PLANT FIGURE 2.2.1 - 5 ( l OF 3)
NOA A APPROACHES TO SHEBOYGAN AIRPORT WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
Ad2 SHEBOYGAN COUNTY MEMORIAL VOR RWY 0 at527"'^^i 5M= =^~ = o~m CM'CAGO CENTtt 125 7 306 3 g(TI
%~% MANITOw OC
@ \
E N
/ gS*
~ ~ - ,__
'g
/ / x I
g \
lfO.),%5l J
.e 6
\
.m ...
l "'
f Alt 5
!.014 FAHih7 .
A 3454 3 914 f ai 1100* ^
~
O
/
/
\ .
/
\ Y x I
' Obeom ot*me'ee semag oa UmeCOM 122 8.=kea act o.oJoble. .se x._.-
r' O.....-o..-......o.
, ..... . .. o..o ..d x/.. O /
%![~
5 /
..~..
,[% canya 7 MIN 5 AFE Alf 25 NM 2600 8'"'a'a yon MISSID APPROACH flIV 7dO
- din 10 NM Cf.mb.no left e.ni e, 2700 ea R 023 FAH REIL t y 21 g3 voe ee* wen to F AM v04 MiRL R=v, 3 21 Q
ond hold end 13 31
,3
_2700 on. ,
f
\ ~ ./
/
e p
( a f' ".XM T A . C D 53 14801 734 .srx> i, 1480 2 7344800 7, 1480 21) 714 R00 7 ' t .
4h's t
( *c ti% 14801 734 soo-i l48 2 1 80 2
'3/l 7
..a... .........,...n-..
> +
1680 254 1680 3
- 53 1680-l'. 934.icou l'. 914 100075 914 1000 3 043**o Im Im3 -
oe ow s 1680 l'. -
914 iotc i . 9 u . im,. ,>.i-
- p. . .. . .. ... ... ..,, . .o , . . , , 3 , .2. _
~ .0 i .
VCR RWY 3 >a~-ar3i- **m e '=~
. in - SHEBOYGAN COUNTY MEMORIAL POSLIS8eEO SY se06 ten && TO IACC Sfute F60.T40 ell HAVEN NUCLEAR PL ANT FIGURE 2.2.1- 5 ( 2 OF 3 )
NOAA APPROACHES TO SHEBOYGAN AIRPORT WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
Aa*3
$HEBOYGAN COUNTYMEMORIAL NDB RWY 21 At n 7 4 ^^) 5 = vcA~.*5m~5a C" Cf NTER p e %
27 06 3 MANTO*OC
/ 4{/
/p N
N
/ ) N Ea \
OSHKOSH
/
N .
\
89Qi I
i
,,,1456 t*/ \
Smit YGAN 914
\
~ ~ a- ,,e ,
\e /
/
o . .s u~,CC-
* ~'" ~'
%,g t .'.... .' , _? '.;.A' .'.~4-2E. * ~
~-
\ /
N /
. 00 . g hi ,.-
/
% NA p MIN $AFE ALT 2$ NM 2600 ues
= * 5'aN'.
m158D APPtOACH ,, 8%"gg Chmb= 2700.a 70$' fDIE 4 b.oehg from NDe teken J 746 KNOB on4 h.W U LOO 2o5' Caff GORY ' A 9 C D %
' 21 1241 494 m it 1240-1 %
494 iSOO 1 '.)
1240-1 %
494(5@ lbi 2 J CIRC LIFr 1240-1 494.50c1i ,,I ,2 4, 1, , ,,13
, 2) e.............s...,...... ,
1440-2 1440 2 W 5 21 *1440-1 694(700il 694i700 2) 694 # 700 2 %> RElt e-y 2 9
- 3 D * '3 "
CiRLCiro 1440-1 694 tto0 Il ace.oe.wst a.yO)1.nd l3 31 122 8
[7 0 4,0 m aoes 60 90 120 150 190 a - . s..
[RDB RWY 21 .n. ~-ar si w w .c ~ . *e~ss ai5m im ,_ ,,,,,,,,,,, m -,)HEBOYGAN COUNTY MEMORIAL H AVEN NUCLEAR PLANT FIGURE 2.2.1 -5 ( 3 OF 3 )
NOAA APPROACHES TO SHEBOYGAN AIRPORT W1SCONSIN UTILITIES PROJECT PRELIMIN ARY S AFETY ANALYSIS REPORT AMENDMENT 20
18 0 170 -
160 150 -
140 - U 8
isc -
E ti i20 - 5 E 8 s a u> no - <
o a E 5 g loo -
g e
H 8
90 -
O E 80 -
9 e
@ 70 -
t O 60 -
O so -
g
+O 40 -
o
+ o so -
20 -
to -
t I t I 1970 1980 1990 2000 2 010 2020 2030 YEAR NOTE : HAVEN NUCLEAR PLANT PR CT CAL ANNUAL CAPACITY: 181,600 FIGURE 2.2.1 - 6 KEY SHEBOYGAN AIRPORT o TOTAL OPERATIONS (REF 40) PROJECTED OPERATIONS -1974-2029 X TOTAL OPER AT10NS(REF 4) WISCONSIN UTILITIES PROJECT
+ TOTAL OPER ATIONS(REF 6) PRELIMIN ARY S AFETY AN ALYSIS REPORT AMENDMENT 20
ET,', %- ( ch"
, k~2
. g -x-~
f em n - a+
?y:L a
_ l - $s-~ _s sea, u A
% ...n W gLw ,. r_ ,, (.
a__ -
A -q '
m . M\ ,
M *= , ,. .Py
, .. "ll.. y e- %
o -Ei .
- o l ( - l j ff= M "'
+~ee ~~q .
"'2*C Com's
[
9 c- HAPEN d ,J 5 ^G +
r-me = c 3
w =sem. MOA i
/
- #g
- u. w a .. , y
$3 5 w
- easseia -on cant sum Tv-
M=, =
~
wm l
, .. &- a b
a- 7. ~m .
Q c '"'
-< *Nb
. c**W
~""
- aTir Phd7';
~
o ,,,, , , , ,
[ {
M F51X o Lf*: jQp; LAKE MICH/G A N O 10 20 -
t e I t SCALE-MILES HAVEN NUCLEAR PLANT FIGURE 2.2.1 -7 NEAREST AIRWAYS AND MINNOW MOA WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
CONTROL BUILDING F =-
C>- hI UNIT I DIESEL GEN. BLDG, DIESEL GEN. BLDG.
- 4 lb!
@Mg @ h #:.:.:.:...... -@
- 7 UNIT 2
. -~~e UNIT I
' SAFEGUARD AREA AUXILIARY BUILDING FUEL BLDG.s UNIT 2 CONTAINMENT STRUCTURE g / FUEL BUILDING A GUARD AREA A LIARY BUILDING
\
L UNIT l CONTAINMENT STRUCTURE SERVICE WATER - -. . -
PUMPHOUSE \
o zoo 40o I I I SCALE - FEET KEY HAVEN NUCLEAR PLANT FIGURE 2.2.3-1 CATEGORY l AREAS TWO UNIT HAVEN PLAN ADDITIONAL AREA DUE TO $:28 AREA AND SHADOW AREA SHADOW AREA ROOF IS X FT ABOVE PLANT WISCONSIN UTILITIES PROJECT Ox' GRADE PhELIMINARY SAFETY AN ALYSIS REPORT AMENDMENT 20
1__.
9.__ _
8-- -
7-- - e-S3/72 6--
o 5 m 4....
Al W 3---- -
o Z
r 2 .56e -s3/ iso 9
c 9
g i ._ _ __
9 l- 8 4 7---
- 6 ----
5 ----
Q g 4 ---- -S 3 /239
~
u 3 o
h- 2 O
z 9
H o 1__ .__
q 9.._.
(r 8- -
- u. 7- -
6- -
N 5 --- .045e-sa/624 i- 4-4 J
D 3- -
2 D
2---
I f f I f I I I f f I y
O 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 SKlO DISTANCES IN FEET-So HAVEN NUCLEAR PLANT FIGURE 2.2.3- 2 FREQUENCY CURVE OF SKID DISTANCE FOR GENERAL AVIATION ACCIDENTS WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
10 --
9._._
8--
7----
6 5
Al 4 _
g 3.. _
4 m
e-r/1.57 4 2-v)
H z
w 9
8 4 1 g9 _
8- -
O 7 ---
6--
< 5- -
g u.
y 4 ---
2
< 3--
_J o
2 o
O 2- -
y, i I I I i 0 1 2 3 4 5 r-DISTANCE FROM RUNWAY END IN MILES HAVEN NUCLEAR PLANT FIGURE 2.2.3-3 FREQUENCY CURVE OF RADIAL LOCATION FOR GENERAL AVIATION ACCIDENTS WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
39_:. . _
8--- -
7-----
6 0
z 4- - - --
e-6/49.6 3-----
85 u_ g 2-----
Oo z.u 90 h $ 9= =
ez e- ---
u< 7----
uJ z a----
2t- 5.- -
D3 4. _._
_J j 3----
o O
2-- -
j_ l i I I I I I l 1 0 10 20 30 40 50 60 70 80 90 100 110 120 6= ANGLE OF CRASH FROM RUNWAY CENTF_RLINE H AVEN NUCLEAR PLANT FI G U R E 2.2.3 FREQUENCY CURVE OF ANGULAR LOCATION FOR GENERAL AVIATION ACCIDENTS WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
1-9...
8----
7-6 ----
5----
w 3, 4----
u) a 3----
O tr F 2---- e -(r- 5 ) /4.56 z
o 5 1 4
9.._
O 8- -
y 7---
5 O
6 ---
u.
5---
h.! 4---
2 w
$ 3---
o 2
a 2 ---
l l 1 j_
5 10 15 20 25 30 r : DISTANCE FROM END OF RUNWAY IN MILES HAVEN NUCLEAR PLANT FIGURE 2.2.3-5 FREQUENCY CURVE OF RADIAL LOCATION FOR GENERAL AVIATION ACCIDENTS BEYOND 5 MILES WISCONSIN UTILITIES PROJECT PRELIMIN ARY SAFETY ANALYSIS REPORT AMENDMENT 20
WUP PSAR Amendment 18 HAVEN 9/22/78 GENERAL TABLE OF CONTENTS Section Title Volume
1.0 INTRODUCTION
AND GENERAL DESCRIPTION I OF PLANT
1.1 INTRODUCTION
I 1.2 GENERAL PLANT DESCRIPTION I 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS I 2.0 SITE CHARACTERISTICS I 2.1 GEOGRAPHY AND DEMOGRAPHY I 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND I MILITARY FACILITIES 2.3 METEOROLOGY I 2.4 HYDROLOGIC ENGINEERING II 2.5 GEOLOGY AND SEISMOLOGY II 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, II AND SYSTEMS 3.4 WATER LEVEL (FLOOD DESIGN) II 3.7 SEISMIC DESIGN II 3.8 DESIGN OF CATEGORY I STRUCTURES II 8.0 ELECTRIC POWER II 8.2 OFFSITE PCWER SYSTEMS II 9.0 AUXILIARY SYSTEMS II 9.2.1 REACTOR PLANT SERVICE WATER SYSTEM II 9.2.3 DEMINERALIZED WATER MAKEUP SYSTEM II 9.2.4 POTABLE AND SANITARY WATER SYSTEM II 9.2.5 ULTIMATE HEAT SINK II 9.3.6 BORON RECOVERY SYSTEM II i
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT 'D)
Section Title Volume 9.4.1 AIR CONDITIONING, HEATING, COOLING, AND II VENTILATION SYSTEMS 9 4.9 SERVICE WATER PUMPHOUSE VENTILATION II 9.5.1 FIRE PROTECTION II 10.0 STEAM AND POWER CONVERSION SYSTEM II 10.4.8 STEAM GENERATOR BLOWDOWN SYSTEM II 10.4.12 MAKEUP AND BLOWDOWN SYSTEMS II 11.0 RADIOACTIVE WASTE MANAGEMENT II 11.2 RADIOACTIVE LIQUID WASTE SYSTEM II 11.3 RADIOACTIVE GASEOUS WASTE SYSTEM II 11.6 OFFSITE RADIOIDGICAL MONITORING PROGRAM II 13.0 CONDUCT OF OPERATIONS II 13.3 EMERGENCY PLANNING II 15.0 ACCIDENT ANALYSIS II
15.1 INTRODUCTION
II 15.2 CALCULATED SITE RADIOLOGICAL DOSES II APPENDICES TO SECTION 2 2A BORING LOGS III 2B BACKFILL EVALUATION STUDIES IV 2C REPORT, SEISMIC SURVEY, HAVEN NUCLEAR IV PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2D REPORT, SEISMIC SURVEY, LAKE MICHIGAN IV AREA, HAVEN SITE - SHEBOYGAN COUNTY ,
WISCONSIN UTILITIES PROJECT BATHYMETRY SURVEY - HAVEN SITE - 1978 ii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT ' D)
Section Title Volume 2E REPORT, SEISMIC VELOCITY AND ELASTIC IV MODULI MEASUREMENTS, HAVEN NUCLEAR PLANT SITE, SHEPOYGAN COUNTY, WISCONSIN 2F REPORT - UNCONFINED COMPRESSION TESTS - IV HAVEN SITE (JUNE 1974)
REPORT ON ADDITIONAL UNCONFINED COMPRESSION TESTS - HAVEN SITE (MARCH 1978) 2G REPORT, SOILS LABORA'IORY TEST DATA, IN SITU IV SOILS, HAVEN NUCLEAR POWER PLANT, UNITS 1 AND 2 2H REPORT, RESONANT COLUMN TESTS, IV WEPCO HAVEN SITE 2I REPORT, CYCLIC TRIAXIAL TESTING, IV HAVEN BORROW SANDS, WISCONSIN ELECTRIC 2J REPORT, FAULTING IN THE ANNA, OHIO REGION IV 2K REPORT, SEISMIC RISK ANALYSIS, HAVEN SITE IV 2L REPORT, LABORATORY DYNAMIC TEST DATA, IV STRUCTURAL BACKFILL, HAVEN NUCLEAR PLANT, UNITS 1 AND 2 2M REPORT, GEOLOGY AND SEISMICITY UNDER IV LAKE MICHIGAN 2N BORING LOGS, HAVEN SITE IV NRC QUESTIONS AND RESPONSES V NRC LETTER 1/9/76 IAR310 ACCIDENT ANALYSIS V IAR324 FOUNDATION ENGINEERING V IIAR310 ACCIDENT ANALYSIS V IIAR321 HYDROLOGIC ENGINEERING V IIAR322 METEOROLOGY V iii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT *D)
Section Title Volume IIAR323 GEOLOGY AND SEISMOLOGY V IIAR324 FOUNDATION ENGINEERING V IIAR420 INDUSTRIAL SECURITY AND EMERGENCY PLANNING V 222.0 POWER SYSTEMS BRANCH V 312.0 ACCIDENT ANALYSIS BRANCH V 321.0 HYDROLOGY V 360.0 GEOLOGY / SEISMOLOGY V 361.0 GEOLOGY / SEISMOLOGY V 372.0 METEOROLOGY V 432.0 EMERGENCY PLANNING BRANCH V iv
WUP PSAR An:endment 16 HAVEN 3/24/78 SECTION 2.4
, HYDROLOGIC ENGINEERING TABLE OF CONTENTS Section Title Page 2.4.1 Hydrologic Description 2.4-1 2.4.1.1 Site and Facilities 2.4-1 2.4.1.2 Hydrosphere 2.4-1 2.4.1.2.1 Lake Michigan 2.4-1 2.4.1.2.2 Local Basin Characteristics 2.4-2 2.4.1.2.3 Surface Water Use 2.4-4 2.4.2 Floods 2.4-4 2.4.2.1 Flood History 2.4-4 2.4.2.2 Flood Design Considerations 2.4-5 2.4.2.3 Effects of Local Intense Precipitation 2.4-6 2.4.3 Probable Maximum Flooding of Local Streams 2.4-8 2.4.3.1 Probable Maximum Precipitation 2.4-8 2.4.3.2 Precipitation Losses 2.4-9 2.4.3.3 Probable Maximum Flood Flow 2.4-9 2.4.3.4 Water Level Determinations 2.4-10 2.4.3.5 Spillage Flow f rom Adjacent basins 2.4-13 2.4.3.5.1 Adjacent Basins 2.4-13 2.4.3.5.2 Pigeon Rive.' 5asin Characteristics 2.4-13 2.4.3.5.3 Probable Maximum Flooding of Pigeon River 2.4-13 2.4.3.5.4 Spillage Flows 2.4-13 2.4.3.5.5 Effects of the Pigeon River PMF Spillage 2.4-14 on the Site 2.4.3.6 Coincident Wind-Wave Activity 2.4-15 2.4-i
WUP PSAR Amendment 20 HAVEN' 2/79 HYDROLOGIC ENGINEERING TABLE OF CONTENTS (CONT ' D)
Section Title Page 2.4.4 Potential Dam Failures 2.4-15 2.4.5 Probable Maximum Surge and Selche Flooding 2.4-16 2.4.5.1 Probable Maximum Winds and Associated Meteorological Parameters 2.4-16 2.4.5.2 Surge and Seiche History 2.4-16 2.4.5.3 Surge and Seiche Sources 2.4-17 2.4.5.4 Wave Action 2.4-18 2.4.5.5 Resonance 2.4-18 2.4.5.6 Runup 2.4-19 2.4.5.7 Protective Structures 2.4-19 2.4.6 Probable Maximum Tsunami Flooding 2.4-20 2.4.7 Ice Flooding 2.4-20 l 2.4.8 Cooling Water Canals and Reservoirs 2.4-21 2.4.9 Channel Diversions 2.4-23 2.4.10 Flooding P2 otection Requirements 2.4-23 z.4.11 Low Water Considerations 2.4-23 2.4.11.1 Low Flow in nivers and Streams
- 2.4-23 2.4.11.2 Low Water Resulting from Surge and Selche 2.4-23 2.4.11.3 Historical Low Wate.- 2.4-23 2.4.11.4 Future Control 2.4-24 2.4.11.5 Plant Requirements 2.4-24 2.4.11.6 Heat Sink Dependability Requirements 2.4-24 2.4.12 Environmental Acceptance of Effluents 2.4-24 2.4.13 Groundwater 2.4-25 2.4-11
WUP PSAR Amendment 20 HAVEN 2/79 HYDROLOGIC ENGINEERING TABIE OF CONTENTS (CONT
- D)
Section Title Page 2.4.13.1 Description ano Onsite Use 2.4-25 2.4.13.1.1 Regional Groundwater 2.4-25 2.4.13.1.2 Site Groundwater 2.4-27 2.4.13.1.3 Plant Requirements 2.4-29 2.4.13.2 Sources 2.4-29 2.4.13.2.1 Groundwater Usage 2.4-29 2.4.13.2.2 Groundwater Table Conditions 2.4-31 2.4.13.3 Accident Effects 2.4-32 2.4.13.4 Monitoring of Safeguard Requirements 2.4-33 2.4.13.5 Design Basis for Subsurface Hydrostatic 2.4-33 Loading 2.4.14 Technical Specification and Emergency Operation 2.4-33 Requirements 2.4-iii
WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.4 LIST OF TABLES Table No Title 2.4.1-1 Hydrologic Considerations of Safety-Related Equipment 2.4.1-2 General Information: Great Lakes Basin 2.4.1-3 Sevenmile Creek Drainage Basin Characteristics 2.4.1-4 Municipal Water Intakes on Lake Michigan within 50 Miles 2.4.1-5 Utility Water Intakes on Lake Michigan within 50 Miles 2.4.2-1 Probable Maximum Rainfall Intensity and Duration (All Seasons) 2.4.2-2 Probable Maximum Rainfall Intensity and Duration (Winter) l 2.4.3-1 Average and Maximum Precipitation 2.4.3-2 River Channel Cross Section (Sevenmile Creek) 2.4.3-3 Cross Section Characteristics of Sevenmile Creek 2.4.3-4 Water Surface Elevations Associated with the 25-Year and Probable Maximum Floods, Sevenmile Creek 2.4.3-5 Water Surface Elevations Associated with the 25-Year and Probable Maximum Flood, Switchyard Channel 2.4.4-1 25-Year Rain Storm Characteristics 2.4.5-1 Sheboygan: Wave Height Frequency, Deep Water Waves 2.4.7-1 Water Surf ace Elevations at Stream Stations for Winter PMF 2.4.13-1 Private Wells within 5 Miles of the Site 2.4.13-2 Withdrawal Use of Water in 1968 in Million Gallons per Day 2.4.13-3 Municipal Water Use in 1968 and Source of Water 2.4-iv
WUP PSAR Amendment 20 HAVEN 2/79 LIST OF TABLES (CONT)
Table No. Title 2.4.13-4 Non-Private Wells within 15 Miles of the Site 2.4.13-5 Wells within One Mile of the Site 2.4.13-6 Calculated Concentrations of Radioactive Liquid Effluents from Accidental Releases to Lake Michigan (pci/gm) 2.4-v
WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.4 LIST OF FIGURES Figure Title 2.4.1-1 Present and Proposed PMF Drainage Features and Outline 2.4.1-2 Lake Michigan Basin 2.4.1-3 Offshore Profile 2.4.1-4 Evaporation from Lake Michigan 2.4.1-5 Precipitation on Lake Michigan 2.4.1-6 Lake Michigan Basin, Areal Runoff Distribution 2.4.1-7 Lake Michigan Basin, Seasonal Runoff Distribution 2.4.1-8 Net Basin Supply to Lake Michigan 2.4.1-9 Lake Michigan - Huron Water Levels 2.4.1-10 Probability of Extreme Lake Level 2.4.1-11 Drainage Area - Local Basins 2.4.1-12 Surface Waters within 5 Miles 2.4.2-1 Typical Yard Profile Pump / Normal Drainage 2.4.2-2 Typical Roof Profile 2.4.3-1 PMF Hydrograph of Sevenmile Creek and Meeme Creek 2.4.3-2 River Channel Cross Sections (Sevenmile Creek) 2.4.3-2 (C1-C12) River Channel Cross Sections (Sevenmile Creek) 2.4.3-3 Drainage Area - Pigeon River Basin 2.4.3-4 Spillage Flow from Pigeon River to Centerville Creek 2.4.3-5 Spillage Flow from Pigeon River to Sevenmile Creek 2.4.3-6 PMF Hydrograph of Sevenmile Creek and Meeme Creek, and the Spillage Flow from Pigeon River 2.4-vi
WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.4 LIST OF FIGURES (CONT *D)
Figure Title 2.4.4-1 Critical Channel Section for Safe Shutdown Earthquake 2.4.5-1 Cross Sections for Critical Wind Setup 2.4.5-2 Deleted - Amendment 19 2.4.13-1 Hydrogeologic Provinces of Wisconsin 2.4.13-2 Hydrogeologic Characteristics of Geologic Units in Eastern Wisconsin 2.4.13-3 Areal Distribution of the Sandstone Aquifer 2.4.13-4 Areal Distribution of the Dolomite Aquifer 2.4.13-5 Areal Distribution of the Sand and Gravel Aquifer 2.4.13-6 Wells within 1 Mile Radius of the Site 2.4.13-7 Non-Private Wells within 15 Miles of the Site 2.4.13-8 Population and Pumpage Trends Projected to 1980 2.4.13-9 Private Wells within 5 Miles of the Site 2.4.13-10 Piezometric Map of the Artesian System (Sandstone Aquifer) 2.4.13-11 Hydrograph of Regional Observation Well at Milwaukee 2.4.13-12 hydrographs of Observation Wells in Sheboygan County 2.4.13-13 Piezometric Map of the Combined Dolomite and Sand and Gravel Aquifer 2.4.13-14 Location of Observation Wells 2.4.13-15 Hydrograph of Observation Well in Manitowoc County 2.4.13-16 Water Table Elevation vs Piezometer Tip Elevation 2.4-vii
_ _ __ _ _ _ _ _ _ _ _ _ _ _ _ - _ . _ - . . . -. . - - - . . . . - - - . ~ _ - _ - - - - - - - - - - -- - - - --
WUP PSAR Amendment 16 HAVEN 3/24/78 amplified the initial conditions. The resulting reflected surge observed in Chicago, approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> later, was from 3 to 8 feet.C32) 2.4.5.3 Surge and Seiche Sources Seiches or free oscillations of the lake normally occur due to rapid decay of wind setup conditions. Because of the geometry of the lake with respect to the plant site, seiches are not considered to be controlling mechanisms with respect to flooding.
To compute the value of wind setup at the site, a one-dimensional computer model was used. Program input contains the basic physical characteristics of the laPa. Average length, width, and depth were computed for a series of sections located along each selected wind path. The probable maximum wind speed and the wind stress coefficient are also input. This wind speed of 80 miles per hour is assumed to attain a steady-state over the entire length of the wind path.
Wind stress coefficients vary for different lakes. Given a fixed wind speed and the physical dimensions of the lake, it is the assumed wind stress coefficient which controls the predicted wind setup. The wind stress coefficient was determined by adjusting the coefficient until the computer model output matched the wind setup values produced by a historical storm.
The severe storm of November 16 through 17, 1955, was used to calibrate the model. Instantaneous lake level readings were recorded at Ludington, Michigan.(3*) Wind speeds for the same period were recorded at Muskegon, Michigan.C35) These recording stations are located nearly due east across the lake from the Haven site. During the historical storm, winds of nearly 50 miles per hour produced a wind setup of 1.2 feet. The wind stress coefficient, which brought the model into agreement with recorded data, was 3.3 x 10-6 This derived stress coetficient was assumed to be applicable for each wind path leading to the Haven site. This calibration is based on the assumption that the physical parameters of the lake are reasonably symmetric about the longitudinal axis.(36)
The program solves equations for the steady-state slope of the water surface while concurrently satisfying the conservation of volume equation. This program is based on the work of Hellstrom, Langhaar, and Keulegan, which is summarized in " Shore Protection, Planning, and Design," U.S. Army Coastal Engineering Research Center.(30) Several trials of wind direction were used to predict the critical path which would produce the maximum wind setup.
Figure 2.4.5-1 presents the critical path as determined by this scheme.
2.4-17
WUP PSAR Amendment 20 HAVEN 2/79 Eighty mile per hour winds with the wind stress coefficient of 3.3 x 10-6 produced a setup of 2.5 ft. In addition to the wind setup value, barometric pressure will add to the wind setup; an additional 0.25 ft has been added to the wind setup value to allow for pressure changes across the lake. This figure is arrived at by computing the pressure differential which 17 associated with the maximum setup. Input includes a Coriolis parameter, air density, wind speed, and distance. The total value for the maximum storm surge is 2.75 f t. The value adopted for the study of wave runup is 3 ft.
2.4.5.4 Wave Action Wave action has been assumed coincident with the maximum recorded monthly mean lake level (583.18 msl) and maximum surge (3 f t) as discussed in Section 2.4.5.3. The maximum wind of 80 miles per hour was assumed to be of unlimited duration over the maximum fetch to the site of 90 miles. A maximum significant deep water wave of 30 f t was calculated. A significant wave is defined as the average of the highest one-third of all waves occurring in a given period. The maximum probable wave is defined for this study as the average of the highest percentage of waves in a representative spectrum. The deep water wave corresponding to this condition is 50 ft. The periods for these waves would range from 11 to 16 seconds.
Table 2.4.5-1 presents expected frequencies of deep water waves offshore of the Haven site. Runup and shoaling are discussed in Section 2.4.5.0.
Littoral Drift The Haven site overlooks Lake Michigan along a stretch of shoreline which is characterized by bluffs 45 to 60 ft high.
Partially cobbled teaches, ranging in width from 5 to 35 ft, are found along this section(55). Inspection of the bluffs reveals some slumping and erosion. The bluffs are roughly two-tiered, i.e., a moderate slope from the beach to a middle plateau region with a sharper rise from there toward the crest of the bluff.
The bluffs have a moderate cover of grass, bushes, and small trees. Offshore of the site, the bottom material is composed of clay, silty clay, and sandy clay with interspersed rocks and boulders.
Little information regarding littoral drift movement is available for the reach from Sheboygan to Manitowoc. Two promontories (to the north, Rawley Point, which is located north of Two Rivers, and to the south, Sheboygan Point, which is located north of Sheboygan Harbor) shelter the region bounded between them from wave attack directly from the north and south. This precludes using sediment buildup around any structure in the lake (e .g . ,
groin, breakwater) near or beyond Rawley and Sheboygan Points for an estimate of littoral drift. There are no structures suitable 2.4-18 E - - _ _ _ . _ _ . . . . . .
NUP PSAR Amendment 20 HAVEN 2/79 for this purpose sufficiently inside the bounded region. Aerial photographs obtained from the National Archives were used to investigate shoreline changes. The magnitude of the littoral was estimated based on a semi-empirical equation that appears in the Shore Protection Manual (31) and on meteorological weather data taken at the site.
Shoreline recession is discussed in Section 2.5.1.2.1. The recession rate estimated there agrees with an independent estimate made by the State of Wisconsin (55).
Meteorological data taken at the Haven site from June 1, 1973 to May 31, 1974 were used to predict the wave characteristics and the corresponding sediment transport. Wind speed and direction based on these data show a marked similarity to data gathered at General Mitchell Field in Milwaukee during this same period and also from January 1, 1955 to December 31, 1964(56). Analysis indicates that the prevailing deep-water wave heights range from 1.2 to 2.0 ft with a wave period of 3 seconds. The predominant littoral drift is from north to south with a net littoral transport rate of 24,000 cu yd/yr. The gross transport, which is the sum of the transports from the south to the north and from the north to the south, is approximately 79,000 cu yd/yr. A complementary study has been performed by the Chicago District of the Corps of Engineers at Hika Park, 5 miles north of the site (56). Daily visual observations of breaking wave heights and breaker angles for the period April 5 through September 6, 1974 were analyzed using methods described in the Shore Protection Manual. The observed breaker heights ranged from 1 to 3 ft. In the Corps analysis, the littoral drif t rate estimated over part of the year was taken to be representative of the whole year.
The prevailing drift was from north to south. A smaller north-to-south net transport obtained by the Corps of Engineers arose because winter waves, which are predominately from the north and which produce littoral drift to the south, were not included in their study. Consequently, the littoral drift rate based on the 1 year of meteorological data taken at the site was adopted.
2.4.5.5 Resonance The Haven site should not experience any water level changes due to reflection or other harbor related fluctuations, as the site is located on a simple open lakeshore. Its location also precludes any appreciable rise due to disturbances along tne main axis of the lake. The possibility of transverse resonance is present; however, the maximum instantaneous level at Ludington, Michigan (located almost directly across the lake) has never exceeded the recorded high water of 581.94 IGLD in the 20 years of record.
Free oscillations of the lake are usually the result of a decaying wind setup. Reinforcement by a change in wind direction or other external force is needed to create a rise higher than 2.4-18a
~~
WUP PSAR Amendment 20 HAVEN 2/79 that of the initial condition. No records available show any values of instantaneous fluctuations which would reach significant proportions.
2.4-18b
WUP PSAR Amendment 19 HAVEN 11/78 2.4.5.6 Runup Wave runup was calculated using a bottom profile which consisted of a 3 to 1 slope of the shorefront revetment structure and the lake profile running perpendicular to shore located halfway between Units 1 and 2 of the Haven Nuclear Plant. Runup due to waves having various periods and breaking at different offshore locations along this profile was investigated using the methods outlined in the Shore Protection Manual (31).
The method is one of successive approximations involving the replacement of the actual composite slope with a hypothetical single slope running from the lake bottom, at the point where the incident wave breaks, up to the point of maximum runup on the structure. This procedure is repeated until convergence is attained. An assumption invoked is that the revetment has a smooth slope. This is a conservative assumption, because the structure would, normally, have a smaller runup due to its rough and permeable surface. In the unlikely event that glazed ice forms on the revetment structure, ice buildup in the nearshore area would force waves to break farther offshore, resulting in a smaller wave runup.
The runup value for waves impinging on a smooth impermeable slope was obtained using data derived in previous small-scale laboratory experiments. A correction factor for scale effects, as described in the Shore Protection Manual (32), was subsequently used in the analysis to obtain the runup value for the prototype structure.
A 3 to 1 riprap revetment structure along the shore will be provided to protect the beach from erosion. Figure 2.5.5-10 depicts the shorefront configuration with the revetment structure. On the basis of this profile, and the maximum lake level, the maximum runup is el 608 msl.
2.4.5.7 Protective Structures The design requirement imposed on the plant with respect to lake flooding is that the plant grade elevation be above the extent of maximum wave runup. The design wave runup elevation of 608 ft mal leaves 2 f t of freeboard to the plant grade elevation of 610 ft msl. On sides other than the lake side, the site will be graded for protection from the inland PMF flooding. The ground floor of all safety-related structures will be at least 6 inches above finish grade to prevent flooding during the local PMF.
Shoreline stabilization will be necessary to halt the erosion which is presently occurring. A design wave height of approximately 12 ft will be used for the shoreline revetment design.
2.4-19
WUP PSAR Amendment 20 HAVEN 2/79 2.4.6 Probu ale Maximum Tsunami Flooding An analysis of tsunami flooding is not considered applicable to inland lakes.
2.4.7 Ice Flooding Ice formation ia a common occurrence along all shoreline areas of Lake Michigan. However, the open lake freezes over completely only during the severest of winters. The winter of 1971-72 was near normal in accumulated freezing degree days. A freezing degree day is defined as a day with a temperature 10F below freezing. Thus, a day with a mean temperature of 25 degrees would provide 7 freezing degree days. During 1971-72, the maximum ice coverage was reported as 40 percent (37). This coverage is roughly equivalent to a 5-mile barrier extending lakeward from all shorelines. Normally, most shorelines are covered completely out to the 30 ft depth contour. Intermittent coverage occurs between the 30 ft and 100 ft contourcsa),
The existing ice sheet may deteriorate due to thermal effects or be broken up by onshore / offshore winds and waves. Broken sheets of ice drift with the wind. With continuous onshore wave action, ice floe hummocks (i . e . , small ice ridges) pile against the frozen beach surface. By this process, an ice foot forms.
Nearshore ice development in Lake Michigan was observed on the beaches adjacent to the Donald C. Cook Power Plant south of Benton Harbor, Michigan during 1969-1970 and 1970-1971. It was observed that the ice structure in the area consisted of an ice foot, a frozen lagoon of brash ice, an outer barrier of ice, a second frozen lagoon, a second outer barrier, and finally a transient field of floe ice. The outermost barrier was generally the largest of the lake ice barriers. It was estimated to be 25 ft high(3').
At the Haven site, however, since offshore winds prevail during winter, the ice foot fornation is less severe than on the east coast of Lake Michigan. An ice reconnaissance was conducted at the Haven site during the early part of 1974. It was found that a pressure ice barrier 6 to 12 ft high was located approximately 30 to 150 ft offshore of the bluff. Soft ice or semi-solid ice intervened between the bluff and the ice barriertsa). The first appearance of ice is usually reported in early December. Ice formation generally peaks in late January and early February and slowly diminishes toward spring. The ice foot formation will not affect the service water intakes.
Where there is no ice cover on the surface and substantial turbulence in the water body induced by wind and wave action, frazil ice can occur when the water is rapidly super-cooled and its temperature drops from above to below 320F without freezing.
2.4-20
WUP PSAR Amendment 20 HAVEN 2/79 Under these super-cooled conditions, the frazil ice is in its active stage and is able to adhere to other materials.
Therefore, whenever this super-cooled frazil ice-producing water is circulated to the depth of an intake structure, an ice buildup may occur that could eventually prevent passage of water into the intake.. The frazil ice can also adhere to the underside of the leading edge of an ice cover to form anchor ice. Anchor ice formation is primarily associated with intensive turbulence induced by onshore breaking waves. Past observations of anchor ice at the Haven site are not available. The largest anchor ice formation observed at the beach near the Donald C. Cook Power Plant was found to be grounded on the bottom in a 12-foot water depth (39). Since onshore winds at the Haven site are less severe than those on the east shore of Lake Michigan during winter, anchor ice at the Haven site is unlikely to occur to a 12 ft water depth..
Two submerged intake structures are provided for the service / makeup water systems. These intakes are located in sufficient water depth to preclude anchor ice from restricting the required flow. The intake design includes electrical bar racks used as a frazil ice preventive measure.
Section 9.2.5 provides a description of the design intake and intake locations.
Ice jam flooding of Sevenmile Creek has been evaluated. The PMF, l which could be coincident with ice formation (November through March) , is 11,000 cu ft per second, or less than one-half the PMF which could be derived from the all-season envelope. A backwater curve calculation was performed with a starting lake elevation of 595 ft msl to simulate a shoreline ice jam condition. The resulting profile was calculated for Sevenmile Creek and its tributaries and was found to be at a lower level than that l indicated for the all-season probable maximum flood. Flood elevations computed at specific locations are listed in Table 2.4.7-1.
2.4.8 Cooling Water Canals and Reservoirs No canals or reservoirs have been employed in design of the Haven Nuclear Plant other than the cooling tower basins which are located west of the plant. The normal water surface elevation in the basins is near the grade elevation of 630 ft ms1 at the cooling tower sites.
The cooling tower basins are below grade; the unlikely event of a cooling tower basin failure during a Safe Shutdown Earthquake 2.4-21
WUP PSAR Amendment 19 HAVEN 11/78 THIS PAGE LEFT INTENTIONALLY BIANK 2.4-22
WUP PSAR Amendment 18 HAVEN 9/22/78 The initial radioactivities in the boron recovery tank are assumed to be NUREG 0017 values adjusted to 1 percent failed fuel. Assumed radionuclide removal by plant process systems is consistent with NUREG 0017.
Concentrations at the nearest potable water intake are calculated in the following manner:
C = BRT P" DF total where:
C = concentration in potable water (pCi/cc)
C = concentration in boron recovery tank bCi/cc)
BRT A = radioactive decay constant t = total travel time to potable water DF = total dilution factor otal Calculated radionuclide concentrations as a result of this postulated spill are presented in Table 2.4.13-6 and are lower than 10CFR20 Appendix B Table Il concentrations for water.
2.4.13.4 Monitoring of Safeguard Requirements The equipment required for monitoring the groundwater in case ot any radioactive spill will be a portion of that used for the radiological environmental monitoring program. This program is described in Section 13.3.4.3 of the PSAR.
2.4.13.5 Design Basis for Subsurface Hydrostatic Loading Safety-related structures are designed for water pressure and buoyancy based upon a maximum groundwater level at plant grade, El. 610 ft. Site groundwater conditions are discussed in Sections 2.4.13.1.2 and 2.5.4.6.
2.4.14 Technical Specifications and Emergency Operation Requirements Safety-related equipment is protected from the maximum postulated flood water levels as described in Section 3.4. Technical specifications and emergency procedures for plant shutdown related to hydrological events are not required.
2.4-33
WUP PSAR Amendment 20 HAVEN 2/79 REFERENCES
- 1. U.S. Department of the Interior, Federal Water Pollution Control Administration. Lake Michigan Bathymetric Charts, Great Lakes Region. Great Lakes-Illinois River Basins Project, Chicago, Illinois.
- 2. Haven Site - Sheboygan County Aerial Survey, Chicago Aerial Survey 2140 Wolf Road, Des Plaines, Illinois.
- 3. St. Wendel, Cleveland, Howards Grove, and Sheboygan Quadrangles, 7.5 minute series (topographic) , U.S. Geological Survey, 1954.
- 4. Pollution of Lako Michigan and Its Tributary Basin, Proceedings of Conference, Volume 1, October 1970.
- 5. National Shoreline Study, Great Lakes Region Inventory Report, Army Engineers Division. North Central, Chicago, Illinois, August 1973.
- 6. Seismic Survey, Lake Michigan Area, Haven Site, Wisconsin.
Weston Geophysical Engineers Inc., 1973.
- 7. Jones, D.M.A., and Meridith, D.D. Great Lakes Hydrology by Months, Proceedings of the 15th Conference, International Association of Great Lakes Research, University of Michigan, Ann Arbor.
- 8. Pentland, R.L. Runoff Characteristics in the Great Lakes Basin. Proceedings of the 15th Conference, International Association of Great Lakes Research Division, University of Michigan, Ann Arbor.
- 9. Federal Water Pollution Control Administration. Lake Currents. Great Lakes Region, Chicago, Illinois, November 1967.
- 10. U.S. Department of Commerce, National Oceanographic and Atmospheric Administration, Lake Survey Center. Unpublished Records of the Office of Vertical Control, Detroit, Michigan.
- 11. U.S. Department of Commerce, National Oceanographic and Atmospheric Administration. Monthly Bulletin of Lake Levels, Lake Survey Center, Detroit, Michigan.
- 12. Pierce, D.M., and Voght, J.E. Method of Predicting Michigan-Huron Lake Level Fluctuation. Division of Engineering, State Department of Health, Lansing, Michigan.
2.4-34
WUP PSAR Amendment 20 HAVEN 2/79
- 13. Department of Natural Resources Sheboygan River Drainage Basin, Pollution Investigation Survey. State of Wisconsin, September 1971.
- 14. Department of Natural Resources. State of Wisconsin, Regulation Section, Bureau of Water Regulation and Zoning, Madison, Wisconsin.
- 15. Truchen, James G. Lake Michigan Water Intakes, Michigan Department of Natural Resources, Water Quality Appraisal Section, August 1973.
- 16. Department of Natural Resources. Report on an Investigation of the Pollution in Manitowoc River Drainage Basin Made during 1968. Division of Environmental Protection, Madison, Wisconsin.
- 17. Wisconsin Department of Natural Resources, Division of Environmental Protection. Twin, Door and Kewannee Pollution Investigation Survey, September 1971.
- 18. Skinner, E.L., and Borman, R.G. Water Resources of Wisconsin Lake Michigan Basin, Hydrologic Investigations Atlas, HA432. Department of the Interior.
- 19. U.S. Department of Agriculture, Statistical Reporting Service. Wisconsin Assessor of Farm Statistics.
Agricultural Statistician, 1972.
- 20. U.S. Department of Commerce. Hydrometeorological Report No. 33, Seasonal Variation of the Probable Maximum Precipitation East of the 105th Meridian for Areas from 10 to 1000-Square Miles and Durations of 6, 12, 24 and 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
Weather Bureau, Washington, D.C., April 1956.
- 21. U.S. Department of Commerce. Weather Bureau Hydrometeorolo-gical Report No. 45, Probable Maximum and T.V.A. Precipita-tion for Tennessee River Basins Up to 3000-Square Miles in Area and Duration to 72 Hours. Silver Springs, Maryland, May 1969.
- 22. U.S. D2partment of Commerce. Weather Bureau Technical Paper No. 40 Rainf all Frequency for Durations from 30 Minutes to 24 Hours and Return Periods from 1 to 100 Years. Atlas of the United States, Washington, D.C. , May 1961.
- 23. Statistical Reporting Service. Snow and Frost-Wisconsin.
Madison, Wisconsin, June 1970.
- 24. Wisconsin Electric Power Company and Michigan Electric Power Company. Point Beach Environmental Report, U.S. Atomic Energy Commission, Docket No. 50-3Q1.
2.4-35
WUP PSAR Amendment 20 HAVEN 2/79
- 25. U.S. Department of Agriculture, Soil Conservation Service.
Sheboygan County Interim Soil Survey, Parts 162, June 1973.
- 26. U.S. Department of the Interior, Bureau of Reclamation.
Design of Small Dams. Section Edition, 1973.
- 27. U.S. Department of the Interior. Water Supply Paper 2005, Model Hydrographs.
- 28. U.S. Nuclear Regulatory Commission. Regulatory Guide 1.59, Design Basis Floods for Nuclear Power Plants. April 1976.
- 29. Handbook of Applied Hydrology, V.T. Chow, ed., McGraw-Hill Book Company, 1964.
- 30. U.S. Army Corps of Engineers. HEC-2, Water Surface Profiles, 1976.
- 31. U.S. Army Coastal Engineering Research Center. Shore Protection Manual, 3rd Edition, 1977.
- 32. Weigel, R.L. Oceanographical Engineering, Prentice-Hall, Inc., 1964.
- 33. U.S. Department of Commerce, National Oceanographic and Atmospheric Administration. Mariners Weather Log, Vol. 17, No. 3.
- 34. National Oceanic and Atmospheric Administration. Hourly Water Levels - Ludington, Nov. 15-16th, 1955. U.S. Lake Survey, Detroit, Michigan.
- 35. U.S. Weather Bureau Wind Speed Data Nov. 15-16th, 1955.
Muskegon County Airport.
- 36. Federal Water Pollution Control Administration. Lake Michigan Bathymetric Chart, Great Lakes-River Basin Project, Great Lakes Region, Chicago, Illinois.
- 37. National Oceanic and Atmospheric Administration. Great Lakes Ice Cover 1971-1972, Technical Memorandum No. LSC D6. Lake Survey Center, Detroit, Michigan.
- 38. Randy, D .R . Great Lakes Ice Atlas. National Oceanic and Atmospheric Administration, Technical Memorandum No. LSCR1, Lake Survey Center, Detroit, Michigan, September 1971.
- 39. Ayers and O'Hara. Stages of Shore Ice Development.
Proceedings of the 15th Conference of the International Association of Great Lakes hesearch, University of Michigan, Ann Arbor.
2.4-36
WUP PSAR Amendment 20 HAVEN 2/79
- 40. Zumberge and Wilson. Effects of Ice on Shore Development.
Proceedings of the 4th Conference on Coastal Engineering.
- 41. Chamberlin, T.C. Geology of Eastern Wisconsin, In: Geology of Wisconsin; Wisconsin Geological and Natural History Survey, Vol 2, Part 2, 1977, pp 93-405.
- 42. Cotter, R.D.; Hutchinson, R.D.; Skinner, E.L.; and Wentz, D.A. Water Resources of the Rock-Fox River Basin: U.S.
Geological Survey - Wisconsin Geological and Natural History Survey, Hydrologic Investigations Atlas HA-360, 1969.
- 43. DeVaul, R.W. Trends in Ground Water Levels in Wisconsin through 1966: U.S. Geological Survey - Wisconsin Geological and Natural History Survey, Information Circular No 9, 1967, p 109.
- 44. Erickson, R.M. Trends in Ground Water Levels in Wisconsin, 1967-71: U.S. Geological Survey - Wisconsin Geological and Natural History Survey, Information Circular No. 21, 1972, p 40.
- 45. Hutchinson, R . D .- Water resources of Racine and Kenosha Counties, Southeastern Nisconsin: U.S. Geological Survey, Water Supply Paper 1878, 1970, p 63.
- 46. Jordan, P.R.; Olcott, P.G.; and Brown, R.D. Appendix E, Ground Water and Geology: Volume III, Upper Mississippi River Comprehensive Basin Study, 1970, p 74.
- 47. Taylor, D.W. Fundamentals of Soil Mechanics. John Wiley and Sons, 1948.
- 48. Walston, W.C. Groundwater Resource Evaluation. McGraw-Hill Book Company, Inc., 1970, p 644.
- 49. Weidman, S., and Schultz, A.R. The Underground and Surf ace Water Supplies of Wisconsin: Wisconsin Geological and Natural History Survey, Bulletin 35, 1915, p 664.
- 50. Zeizel, A.J., et al. Groundwater Resources of DuPage County, Illinois: Illinois State Water Survey and Illinois State Geological Survey, Cooperative Groundwater Report 2, 1962.
- 51. U.S. Army Engineer WES, Corps of Engineers, Floods Resulting from Suddenly Breached Dams. Vicksburg, Mississippi, 1960.
- 52. U.S. Nuclear Regulatory Commission. Regulatory Guide 1.27, Rev. 2, Ultimate Heat Sink for Nuclear Power Plants.
- 53. Eagleson, P .' S. Dynamic Hydrology, McGraw-Hill, New York, N.Y., 1970.
2.4-37
WUP PSAR Amendment 20 HAVEN 2/79
- 54. Harr, M. Ek Groundwater and Seepage. McGraw-Hill, New York, N.Y., 1962.
- 55. Hadley, D.; Fricke, C.; Edil, T.; and Haas, B., Wisconsin Coastal Management. Shore Erosion Study, Technical Report, Appendix 5, Shoreline Erosion and Bluff Stability along Lake Michigan and Lake Superior Shorelines of Wisconsin, Sheboygan County, April 1977.
- 56. Wisconsin Electric Power Company. Environmental Report, Vol. 2, Haven Nuclear Plant, Units 1 and 2, 1978, Table 2.6-24.
- 57. Department of the Army, Chicago District of the Corps of Engineers. Revised Preliminary Feasibility Report for Harbors between Kenosha and Kewaunee, Wisconsin. April 1977.
- 58. Industrial Bio-Test Laboratories, Inc. Report on Ice Condition Offshore from the Haven Site. February and March 1974.
2.4-38
WUP PSAR Amendment 16 HAVEN 3/24/78 TABLE 2.4.2-2 PROBABLE MAXIMUM RAINFALL INTENSITY AND DURATION (WINTER)
Intensity Duration (In. )
48 hrs 18.4 24 hr 15.06 12 hr 11.96 6 hr 9.43 5 hr 8.72 4 hr 8.02 3 hr 7.16 2.5 hr 6.60 2 hr 6.13 1.5 hr 5.47 1 hr 4.62 0.5 hr 2.83 15 min 2.18 10 min 1.81 5 min 1.27 1 of 1
WUP PdAR Amendment 20 HAVEN 2/79 TABLE 2.4.3-1 AVERAGE AND MAXIMIM PRECIPITATION Average Annual Maximum Annual Maximum 24-hr Location Precip, Inches Precip, Inches Rainfall, Inches Kenosha 29.86 41.84 3.55 Racine 31.90 48.33 4.00 Milwaukee 27.62 41.86 5.28 Shorewood 31.64 42.46 --
Port Washington 27.96 38.39 --
Sheboygan 29.27 40.14 4.55 Manitowoc 28.39 46.43 6.39
'Dro Rivers 28.65 41.17 -
Kewaunee 26.53 34.99 4.92 Sturgeon Bay 27.20 39.65 4.57 Green Bay 26.56 38.03 3.68 Washington 28.11 37.25 Island 1 of 1
WUP PSAR Amendment 18 IIAVEN 9/22/78 SECTION 2.5 (CONT 8D)
LIST OF TABLES Table Title 2.5.4-12 Clay Mineralogy of Shore Wood and Manitowoc Tills in Eastern Wisconsin 2.5.4-13 Rock Properties 2.5.4-14 Summary of Geophysical Data 2.5.4-15 Input Motions for Analysis of Liquefaction Potential and Dynamic Subsidence 2.5.4-16 Summary of Earthquake Induced Settlements on Seismic Category I Structures 2.5-v
WUP PSAR Amendment 20 HAVEN 2/79 SEC*rION 2.5 LIST OF FIGURES Figure Title 2.5.1-1 Regional Physiographic Map 2.5.1-2 Regional Surficial Geology 2.5.1-3 Deleted with Amendment 16 2.5.1-3A Geologic Time Scale for Pleistocene Epoch 2.5.1-4 Regional Stratigraphic Column 2.5.1-5 Regional Surface Bedrock Geology 2.5.1-6 Regional Crosu Section - East-West 2.5.1-7 Regional Cross Section - North-South z.5.1-7A Geologic Cross Section - Central Lake Michigan C-C 2.5.1-8 Deleted with Amendment 16 2.5.1-9 Deleted with Amendment 16 2.5.1-9A Regional Fold Map 2.5.1-9B Regional Fault Map 2.5.1-9C Faulting within 50 Miles 2.5.1-9D Structure Contours Top of the Maquoketa 2.5.1-9E Structure Contours Top of the St. Peter 2.5.1-9F Structure Contours - Top of the St. Peter Sandstone 2.5.1-9G Structure Contours - Top of the Trempealeau Group 2.5.1-10 Regional Bouguer Gravity Map 2.5.1-11 Residual Total Magnetic Anomaly Map 2.5.1-12 Deleted with Amendment 18 2.5.1-12A Boring Location Plan 2.5.1-12B Boring Location Plan 2.5.1-13 Site Geologic Cross Section North-South A-A 2.5-vi
WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.5 (CONT 8 D)
LIST OF FIGURES Figure Title 2.5.1-14 Site Geologic Cross Section East-West B-B 2.5.1-15 Site Geologic Cross Section North-South C-C 2.5.1-16 Perspective Block Diagram 2.5.1-17 Site Subsurface Profile A-A 2.5.1-18 Site Subsurface Profile B-b 2.5.1-19 Site Subsurface Profile C-C 2.5.1-20 Site Subsurface Profile D-D 2.5.1-21 Site Subsurface Profile E-E 2.5.1-22 Site Subsurface Profile F-F 2.5.1-23 Deleted with Amendment 18 2.5.1-24 Deleted with Amendment 18 2.5.1-25 Deleted with Amendment 18 2.5.1-26 Selected Deep Wells in Site Vicinity 2.5.1-27 Site Stratigraphy 2.5.1-28 Linears from ERTS Photographs 2.5.2-1 Earthquake Epicenter Map 2.5.2-2 Isoseismal Map, New Madrid Earthquake, 1811 2.5.2-3 Isoseismal Map, May 26, 1909 Beloit Earthquake 2.5.2-4 Isoseismal Map, March 9, 1937 Anna, Ohio Earthquake 2.5.2-5 Intensity - Acceleration helationships 2.5.2-6
- Regional Fault and Epicenter Map 2.5.4-1 Modified Deere and Miller Engineering Classification of Haven Site Rock 2.5.4-2 Bedrock Contour Map 2.5-vii
P WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.5 (CONT 'D)
LIST OF FIGURES Figure Title 2.5.4-3 Bedrock Contour Map 2.5.4-4 Site Excavation Profile A-A 2.5.4-5 Site Excavation Profile B-B 2.5.4-6 Site Excavation Profile C-C 2.5.4-7 Site Excavation Profile D-D 2.5.4-8 Site Excavation Profile E-E 2.5.4-9 Site Excavation Profile F-F 2.5.4-10 Piezometer Location Plan
- 2. s' .4-11 Onsite Piezometer Data 2.5.4-12 Onsite Piezometer Data 2.5.4-13 Onsite Piezometer Data 2.5.4-14 Onsite Piezameter Data 2.5.4-15 Onsite Piezometer Data 2.5.4-16 Site Excavation Plan 2.5.4-17 Service Water System - Offshore Location Plan and Profile 2.5.4-18 Service Water System - Offshore Trench Sections 2.5.4-19 Cyclic Stress Ratio vs Effective Confining Pressure for Compacted Fill 2.5.4-20 Comparison of Shear Stresses in Free Field 2.5.4-21 Comparison of Shear Stresses below Diesel Generator Building 2.5.4-22 Comparison of Shear Stresses below Control building 2.5.4-23 Comparison of Shear Stresses below Fuel Building 2.5.4-24 Comparison of Shear Stresses below Fuel Oil Pump-House 2.5-viii
WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.5 (CONT 8 D)
LIST OF FIGURES Fiqure Title 2.5.4-25 Comparison of Shear Stresses below Main Steam Valve House No. 1 2.5.4-26 Static and Dynamic Lateral Earth Pressures 2.5.4-27 Lateral Static Earth Pressures Due to Compacted Fills against Unyielding Walls 2.5.4-28 Passive Earth Pressure Coefficients for Vertical Wall 2.5.4-29 Pressure Test Results-Permeability vs Elevation 2.5.4-30 Plant Foundation Elevation and Load Data 2.5.4-31 Summary of Static Settlement-Seismic Category I Structures 2.5.4-32 Volumetric Strain vs Cycle Ratio 2.5.4-33 Range of Grain Size Distribution for Structural Fill 2.5.4-34 Deleted with Amendment 19 2.5.4-35 Deleted with Amendment 19 2.5.4-36 Deleted with Amendment 19 2.5.4-37 Deleted with Amendment 19 2.5.4-38 Deleted with Amendment 19 2.5.4-39 Deleted with Amendment 19 2.5.4-40 Deleted with Amendrc.ent 19 2.5.4-41 Deleted with Amendment 19 2.5.5-1 Location Plan - Permanent Slopes, Subsurface Profil es 2.5.5-2 Permanent Slope - Subsurface Profile A-A 2.5.5-3 Permanent Slope - Subsurface Profile B-B 2.5.5-4 Permanent Slope - Subsurface Protile C-C 2.5-ix
WUP PSAR Amendment 20 HAVEN 2/79 SECTION 2.5 (CONTeg}
LIST OF FIGURES Figure Title 2.5.5-5 Permanent Slope - Geometry and Soll Properties -
Long Term Stability Case 2.5.5-6 Permanent Shoreline Slope - Geometry and Soil Properties - Iong Term Drained Stability Case 2.5.5-7 Permanent Slope - Geometry and Soil Properties -
Seismic Loading Case 2.5.5-8 Permanent Shoreline Slope - Geccetry and Soil Properties - Seismic loading Case 2.5.5-9 Shoreline Modifications - Location Plan 2.5.5-10 Shoreline Modifications - Sections 2.5.5-11 Shoreline Erosion 1941-19'n 2.5-x
WUP PSAR Amendment 20 HAVEN 2/79 States (Ref. 9) , both published by the U.S. Geological Survey.
Thwaites* delineation of the faults is based almost completely on differences in elevations of various formations as recorded in wells, assuming elevation differences to be faults and extending these down to the Precambrian.
Since Thwaites' Buried Precambrian Map of Wisconsin was published in 1931 and updated in 1957, additional well data have become available. In light of the availability of these new data, additional studies were conducted for the purpose of more clearly defining the extent of the postulated faulting and also for establishing the existence of these faults.
5.hese studies consisted of a literature search of published and unpublished data, interviews with geologists currently active in the area, geomorphic studies, and structure contouring of the top cf the Maquoketa Group, the St. Peter sandstone, and the Trsmpealeau Group. The structure map of the Maquoketa is shown on Fig. 2.5.1-9D. Only a portion of the structure map of the St.
Peter, pertinent to faulting within 50 miles of the site, is shown on Fig. 2.5.1-9E. A complete structure map of the St.
Peter sandstone and the top of the Trempealeau Group for southeast Wisconsin are shown on Figs. 2.5.1-9F and 9G, respectively.
The methods of conducting these studies and the general con-clusions derived are discussed below. Faults within the area of investigation are discussed individually in the following paragraphs.
The structure contour map of the top of the Maquoketa Group was constructed from the analysis of about 200 drilled wells. The structure contour maps of the top of the St. Peter sandstone and the Trempealeau Group were constructed from approximately 800 data points. These data consisted principally of well records from the files of the Wisconsin Geological and Natural History Survey (Wisconsin Survey) , the Private and Public Water Supply Sections of the Wisconsin Department of Natural Resources, and the Illinois State Geological Survey (Illinois Survey) . The Wisconsin Survey also provided unpublished outcrop data for Dane County, Wisconsin and the preliminary results of unpublished faulting investigations immediately east of Madison (Yahara Hills Area).
Several thousand well records were examined and evaluated. The data used in constructing the structure contour maps represent the most reliable information available for those records. In most cases, this information consists of the elevations of formation contacts determined by geologists of the two state surveys. In areas where such data are sparse, interpretations 2.5-23
WUP PSAR Amendment 20 HAVEN 2/79 from well drillers' logs were used to complement the more detailed geologic logs.
Geomorphic studies consisted of an examination of the 7 1/2 and 15-minute topographic quadrangles , delineation of lineaments present on Earth Resources Technology Satellite (ERTS) imagery, and low-level aerial reconnaissance by helicopter.
Analysis of topography depicted on quadrangles did not reveal any clear cut instances of surface expression of fault traces. Along portions of the Janesville (6) and Madison (7) faults, fault 5, and the North Branch of fault 3, there appears to be some correspondence of drainage courses with the trend of the faults.
There is no evidence to suggest development of any post-Pleistocene faulting features such as scarps or lateral offset of Pleistocene land forms. Certainly there was adequate time for pre-Pleistocene erosion to establish major drainage courses along the weaker rocks of fault zones. It is equally plausible to expect some portions of these drainage courses to have survived glacial erosion and/or deposition in modified and subdued form.
These older modified patterns have been integrated into the post-Pleistocene drainage pattern.
ERTS Photographs E-1359-16091 and E-5511-15172 were studied at scales of 1:1,000,000 and 1:250,000. The 1:1,000,000 scale was found to have sharper detail and was, therefore, more useful for this study. The study identified a great many linears. Of these, only linears greater than 5 miles in length are piutted on Fig. 2.5.1-28 and described in Table 2.5.1-3. Minor morainic features and drumlin fields were not plotted.
Linentions interpreted from ERTS imagery show strong glacial overprints in the form of moraines, moraine (Lobe) margins, drumlin trains and similar, linear glacial features. In addition, the regular north-south / east-west subdivisions of land areas tend to mask natural lineations with similar trends. A large number of linears found in the study region could be related to glacial features. Other linears shown on Fig. 2.5.1-28, numbered 5, 8, 20, 21, 22, 23, 24, 25, 26, 35, 46, 56, 73, and 75 approximately parallel the strike of bedrock and may represent indistinct erosional cuestas. Linears 1, 2, 3, 6, 10, 11, 14, and 15 on the Door Peninsula do not follow the trend of glacial related linears or bedrock strike, but may reflect jointing or fracturing in the bedrock. There are lineations which correspond approximately to the trends of the Janesville (6) and Madison (7) faults. These are considered to reflect pre-Pleistocene erosional features as previously discussed. It is also possible that they may reflect surficial effects of localized groundwater anomalies caused by increased permeability along fault / jointing zones. No disturbance of Pleistocene glacial features was noted.
2.5-24
WUP PSAR Amendment 20 HAVEN 2/79 A study of regional geomorphic lineaments and their origin using LANDSAT (ERTS) imagery has been conducted by Saunders and Hicks and has identified eleven sets of lineaments throughout the continental United States (Ref. 203) . They conclude that the major lineament set trending ESE originated during the early Precambrian in conjunction with a sea floor spreading event.
Subsequent changes in crustal stresses were responsible for the development of the ten remaining lineament sets. The last stress change occurred during the Early Mesozoic.
The proposed origin of these lineament sets does not conflict with the geologic studies conducted for the Haven site and are in general agreement with the current theories of plate tectonics and presumed mantle convection patterns (Ref . 203) .
Of the lineaments mapped by Saunders and Hicks, only the Lake Michigan lineament passes close to the site. Its location coincides with the west shore of Lake Michigan, north of Milwaukee, and apparently is related to the lake-shore bluf f that developed as a result of shoreline recession. Lineaments such as the Green Bay and Racine lineaments are coincidental with smaller Jineaments 23, 35, 94, and 96 shown on Fig. 2.5.1-28. Other lineaments mapped by Saunders and Hicks in the area of the site are not evident on Fig. 2.5.1-28.
Aerial reconnaissance of the Madison fault (7), the Janesville fault (6) , the Waukesha fault (3) , and fault 5 was flowa, using a helicopter and an average flight height of 1,500 f eet. No instances of disturbance of Pleistocene deposits along fault trends were noted. The location of the Waukesha Quarry fault (3A) was closely examined. It also had no surface expressions in the overlying soil materials. It is concluded from geomorphic evidence that movements on faults within the area must be a minimum of pre-Wisconsinan in age.
Where surface outcrops of faults could be located, radiometric dating of the gouge was attempted. The mineralogy of the sedimentary rocks of the area does not typically include radiometrically datable species and the lack of major tectonism provides no readily identifiable heating events. Gouges are typically granulated wall rock, either unaltered or modified by surficial or near surface weathering. Secondary mineralization, where present, typically consists of deposits left by downward percolating groundwater.
Two samples of gouge material were obtained from fault 3A for potential radiometric age dating. The locations and radiometric ages of the samples are shown in Table 2.5.1-2A. The mineralogical composition of the gouge samples is shown in Table 2.5.1-2B.
2.5-25
WUP PSAR Amendment 20 HAVEN 2/79 The contact between the Ordovician Maquoketa Group and the Silurian Niagaran dolomite was chosen for structure contouring because it is the youngest reliable horizon present over much of the area in the site vicinity. The contact (top) of the Maquoketa Group is conformable with the overlying Mayville Formation in Sheboygan County (Ref . 153). This contact should reflect any post-Ordovician deformation. Over 500 well logs were examined; however, relatively few wells penetrate the Maquoketa bedrock because it generally occurs more than 400 ft below ground surface. Clusters of deep wells do exist in many towns south and west of the site. Very little well data are available for correlation north of the site.
In the area contoured, the Niagaran dolomite occurs as a north-south trending belt about 35 miles wide. On the western border of the area the Silurian strata have been eroded and the Maquoketa is overlain by Pleistocene deposits. No data are available on the Silurian-Ordovician contact east of the site (beneath Lake Michigan) .
Two anomalously low points at the top of the Maquoketa are located over 40 miles from the site in southern Ozaukee County.
These low points trend northeast-southwest (Fig. 2.5.1-9D) . The contours of the top of the underlying Galena limestone show a similar trend (Ref. 153) .
The top of the St. Peter sandstone was chosen for contouring because it is the youngest reliable horizon present west of the Maquoketa study area. The contact (top) of the St. Peter with the overlying Platteville Formation is unconformable but a flat genu , dipping surface would provide contrast for recognition of either faulting or erosional modification of the contoured surface. Because of its relatively shallow depth in the area contoured, a large number of wells penetrate the St. Peter and afford good control. The St. Peter /Platteville conta ct is continuous over the study area except in the northwestern corner where streams have eroded the contact from their valleys. Even in this region a sufficient extent of erosional remnants remains to provide good control.
The top of the Trempealeau Group (Jordan Formation) was contoured principally as a check on the results of the St. Peter contouring. In addition, its lower stratigraphic position afforded more continuous control in the northwestern portion of the study area. A portion of the structure contour map of the top of the St. Peter sandstone is shown on Fig. 2.5.1-9E. A complete structure map of the St. Peter in southeast Wisconsin is shown on Fig. 2.5.1-9F.
2.5-26
WUP PSAR Amendment 20 HAVEN 2/79 Appleton Fault (Fault 1)
The Appleton fault, as described by Thwaites (Ref. 116) , is composed of two segments, each with a different trend. One portion trends southwest from Lake Michigan to southeastern Brown County. Another portion of the fault extends from this point essentially west to southwestern Waupaca County. However, recent work in the area by geologists at Lawrence University in Appleton indicates that there is no evidence for the fault (Ros s , 1973, oral communication) .
Thwaites (Ref s . 116, 117, 118) indicates that faults occur in Precambrian and Paleozoic rocks in the Green Bay and Door Peninsula area. These faults include the Green Bay and Appleton faults, the postulated locations of which are shown on Fig.
2.5.1-9B. Little evidence for this interpretation exists in these publications. The 1957 publication is a map titled " Buried Precambrian of Wisconsin" and is a diagrammatic map of the state at a contour interval of 100 feet and a scale of 1:2,500,000. No text accompanies the rap which is based on well data obtained from Thwaites* previone studies. Faults indicated in the 1940 and 1931 publications are also drawn on the Precambrian surface and all data were obtained from driller's records and well logs.
One other fault in the Green Bay-Door Peninsula area reported by Thwaites and Bertrand (Ref . 117) is based on records of two wells at Algoma drilled 200 feet apart. From these two data points, a fault, which is the eastern part of the Appleton fault, is mapped for a distance of 35 miles and extends from approximately 9 miles of fshore in Lake Michigan, through Kewaunee County and into Brown County for 6 miles. The only information on the nature of the fault is that it strikes north of east and the southeast side is downthrown. The amount of displacement is not given for either fault.
Thwaites* postulated f aults north of Two Rivers (Ref. 116) were discounted by Thwaites and Bertrand (Ref . 117). They state that the original conclusion was based on a driller's log of an old well in Two Rivers which does not check with newer wells nearby.
They therefore concluded that no such faults exist in the vicinity of Two Rivers.
Thwaites and Bertrand CRef. 117) also recognized that reef struc-tures in the Silurian rocks of the Green Bay and Door Peninsula area are difficult to distinguish from faults. They stated the following:
2.5-26a
WUP PSAR Amendment 20 HAVEN 2/79 No detailed gravity or magnetic studies have been made of the Janesville area of Rock County. Present regional gravity maps (Ref s . 133, 41) and regional magnetic maps (Ref . 37) are too small scale to define specific bedrock configurations. Seismic profiles have not been conducted across Rock County to delineate subsurf ace information (Ostrom , 1974, personal communication) .
Based on structure contours of the top of the St. Peter sandstone, the Janesville fault is shown to extend from 42044'N, 88040'W to beyond 42042'N, 89050'W. Thwaites (Ref. 117) extended the fault over a distance of 72 miles, an additional 14 miles west of the area contoured. The results of this study correspond closely to Thwaites' determination of the Janesville fault; thus it is reasonable to extend the fault over the entire 72 miles.
The strike of the fault varies within about 110 deg, but averages N860E. The available well data are not sufficiently closely spaced to allow an accurate determination of dip; the dip direction is northerly and the trace of the fault plane across contours suggests a steep dip angle. Vertical displacement at the top of the St. Peter sandstone is about 100 feet, with the l north side downthrown.
Definition of the Janesville fault is provided by approximately 10 wells. Extension of the fault eastward beyond 89000'W is somewhat speculative since there are few wells in that area.
Supplemental to low-level aerial reconnaissance by helicoptor and examination of topographic quadrangles, an air photo study and fi eld reconnaissance were made along the trend of the Janesville fault.
Aerial photographs (1 to '2,500 scale) were studied along the fault trend from 10 miles east to 20 miles west of Lake Koshkonong. No geomorphic evidence of the fault was found by analysis of the aerial photographs.
A field reconnaissance was made of the Janesville fault area for a distance of about 50 ndles, extending eastward from Argyle to Milton. The reconnaissance concentrated on rock outcrops in road cuts and quarries throughout the study area. No exposures or faults were found.
Heyl (1975, oral communication), while working in the lead-zine district of southwestern Wisconsin, checked the mines and quarries for an extension of the Janesville fault into this area, but found none. He did observe evidence of folding. Heyl also investigated the area of the Janesville fault as located by Thwaites, and found no surface expression of the fault.
Contacts with geologists knowledgeable of the geology of southern Wisconsin, regarding faulting in the area, revealed no new information on the extent or age of f aulting.
2.5-31
WUP PSAR Amendment 20 HAVEN 2/79 The age of the Janesville fault is considered to be post-Devonian to pre-Cretaceous, based on regional considerations (Ostrom, 1975 personal communication) and the lack of geomorphic expression.
There are no macro-seismic earthquakes associated with the fault.
Madison Fault (Fault 7)
The Madison fault extends from 42058.5'N, 89004'W to 42057'N, 89052'W, a distance of about 41 miles. Thwaites (Ref . 117) showed a length of about 36 miles; the additional length suggested by structure contours of the top (.~ the St. Peter sandstone is a westward extension of the previously mapped location. The strike of the fault along its eastern half averages east-west changing to N820E along the western portion.
Available well data for this f ault are the best of any in this investigation. The dip of the Madison fault is essentially vertical, with occasional local variations that favor steep southerly dips. Maximum vertical displacement is approximately 40 feet, with the north side downthrown. Some data indicate as much as 100 feet of localized displacement.
l About 25 wells, all of them logged by geologists, served to define the contours in the area of the Madison fault. A portion j of this fault is in the Yahara Hills area currently under investigation by the Wisconsin Survey. The results of this study and the preliminary results of the Wisconsin Survey investigation agree closely.
A number of faults reported in Dane County do not appear equiva-lent to the Madison Fault as mapped by Thwaites. Several faults have been found or inferred as the result of recent geologic investigations by the Wisconsin Geological Survey in the Madison area. These include faults exposed in a roadcut west of the village of Mt. Vernon, and faults at the Yahara Hills golf course, east of Madison, which have been inferred from water well data. Anomalies in elevations of formation contacts in water wells and of formations in outcrops have suggested faults at various other locations in the Madison area.
According to Ostrom (oral communication, November 1974) , there is little doubt as to the validity of the data that indicate the existence of these faults in the Madison area. However, the inferred faults are covered by overburden and available surface data are insufficient to establish their orientation or length.
No gravity, magnetic or seismic surveys of Dane County exist other than the regional magnetic map (Ref . 37) , and gravity maps (Refs. 133 and 41) which are too small scale to define faults.
2.5-32
'0 3
7 l' , I S R
8 C
8l -
~ L 3
R I
O W
O T
I
^
O 8 1
- N C 3 ll' EO E
N U
/g
/
O
/
3 2
A
- M
_ E A C f j
~ W O _
W
- 4 7
8 ~
f v I 1 5
7 3
E 1K O T
I N
A
/
/
/
M
- ~ f m 4
6 c
4 c f
/ e. I f
,O N C O
C A. N A
'0 G 0
8 w Y 8
n O B
4
' , li l I
2 4 6 E 6, H W 9, 8
4
- S O
R 4
6 8, B
[
J
. I I l 1 f 2 9
3 7
8 r
2 8
~'
_O ,$ , 5 C /
8
/
'5 1
- l T " ^
8 8 E ' '
M O. U C L E C I
A O
G M
A G
A T
' l E KE AN A
Bl l f
U L IN
'O
)
W
'0 3 _
'0 8
8
- 0 3
4 33 4
4
{t)*O 4 4
4
fl!
l D % +
N D 0
-N A G
Y 2k % y O
B N E O E H T S G T
I S NIH MN /
S A
W 2
1 3,
4 5 - [J T
.
- 5 R 3.- . ; *0 /
/ 03 O \ gl
, 2
- /
D ' P 0
O
- 5 ,
7 C ,
6 3_ g 5
, 34
- ;/e'
. ' '0, C I 1
,. 1 O f 5
C 1
O c g 4
W f ],.
l'E ' f ",
E 5
O_ E a.
TI O 3 i *0, 2 N C! _K U /
//,,2 q A 5 6
.A M N O Z 9 A i s
'4
~
0 C O i
2/ 0 2
1
\
\
N I
_GY 3 I O
4 A
G s A j l l B 5 g
E I Y O
H S B E
1 \ 5 2
5 g 3 o
_ H ?
5 4
3 S
I
,I 6
0 v
6 - ,
i 5
' 5 3 4 e O" 5 C,5 6
~O C
b
},
( i 0
0 , N T a h T
O C s .- T\ -
\
A f 7 .
G O L 5 8 N C E 'T I H
s u '
S\ i
\
'D D 5 5 2
5 6
8 A
W'
.3 3
g d - ~A
%
- o H N 9 s
O ' ' ,
S
'F - ' -
, 5 5I 3
ll E O K 0
E 5 9
_ C A U g
)
'5
- 4 3
4 g
3 I
(
w '0 3
3 4
,3, 3
4 E
M*
O
'D
Il5*I '545 8 j '
-iOI I l \ ( PORT WASHINGTON I
l 200' 40 955 * [.94-9e 635' F5I0 555*
li0 k k l g6 *((282 290 43*l5 -
/l -/ u -a I45 g /
/ '525
' .g tr* < B5 (4 r 67 N
'DO)GE' CO. l
/{ -
555 530 -1304
"~
ig
' h.
AUKESHA~ CO.-\ 545 _4,5 I a 243 a5
.e n g *0 3 ,40yir y\ 5 o
$25 L ,
I 1,,5.hi,@/'ugg,,1&"s
* 66 I-
=..
ao 9 95 p
583
')Ikthl'h'k*9^uxes
>a ~ v m
=* q, z.ve3 zizi
,4,
- s. -
. 8,0 345
.1e05 -
,,- M,,y- ,a i =A 1- 805 w l(,004-6n e%
"i,% p a _ fsd i in e
... a , , 9
- .14 43 00 s.,o
,,0 f ,
h,' l 3 %...l..."...si.'.'333. ' *
- V***-
e t SCALE- MILES is 50ie 585o ' 366
'IdM3I u 330 I o 330 b2 WAUKESHA CO. h MILWAUKE CO. 2624 - 264 5 @ $ WALWORTH CO. RAC NE CO. 340 g ,
hEHCP Z $ 433 200 18 5 4T6 24
"' * ( f
$ p8 h> 665 638* 47,o 46f._4 TO o
- 338 AROZ
-4 u) C H W 4
4 0O EXPLANATION NOTES p
m7
- DENOTES ANOMALOUS DATA POINT
- 19 5 WELL LOCATION AND ELEVATION k $ ITi m g { NOT CONTOURED pggM g OF TOP OF MAOUOKETA OTHER ANOMALOUS DATA POINTS WITHIN QO H # CONTOUR LINES - MILWAUKEE CITY LIMITS ALSO NOT ,
9 o / CONTOUR INTERVAL 100FT CONTOURED u) m m g- g** DASHED LINE DENOTES PROBABLE FAULT .
E DATUM-MEAN SEA LEVEL ,!
g g y [ DOTTED LINE DENOTES POSSIBLE FAULT
! ' ,e Q
, ~\
M *j MILW Aufstt,
- ru 695 g3 E" ; h;Nf] #*
. .T *
- . g$* ,
f 43 /3 -
I2 - [, tg lg-
- i(s* l Q (,.
1 43*00' -h -
- m. ,' j;glt
. . . , . ,. \4x;l 4to t3 1 _Am i
r g,,3 5 10
- 425 N...h...410,R.l.,Sn.
495 i} O, i a
$o '
~~**
N SCALE- MIL ES 565o 566 501 I, * **; _7;g 8 w 130 :<30 1 o 515 262.a -264 4 U) 2! I ,I 14i g MILWAt)KEE CO T
mg "J O -I o > CO. ~
Nw mo mac< WAUKESHA CO- RAC NE CO.
540 2D g m$ WALWORTH
$O o *44g
- 4 j3
, gg)
N.
N g 240 ' """
D2. -4 I %CUt 4 36,
-j
$j$$8E2 '_ _
" ' # 1___ m 46c. m'"' _
NOTES d
-4 u) C --I E XPL AN ATION
- DENOTES ANOMALOUS DATA POINT ,
-< g OO .o WELL LOCATION AND ELEVATION NOT CONTOURED
% I 19 5 OF TOP OF MAOUOKETA OMH ANOMALOUS WA NNTS WITM
&O fri m MILWAUKEE CITY LIMITS ALSO NOT ,
gc_gU)
--i CONTOUHED C # # CONTOUR LINES-CONDOH INTERVAL LOOF T ,
9 (A
d[ DASHED LINE DENOTES PROUABLE FAULT DATUM-MEAN SEA LEVEL 8-m h
- ri m
[c..***** DOTTED LINE DENOTES POSSIBL E FAULTNUMBER jom O ~
AHEA It1 WHICH THE M AOUOKETA IS EHODED . .
-i Z ' .
y -
q 7_.-. _
%N-%,
y V o
%Ong.
m $
m
- s:a _
s O
4 7, n2 ex 006- OM Q. 4 3
~
'@r.
N
- N
- N Cor.
- b%
A 9 4:
h $' $
'm'
- -001 -
y o- "
e 0
. .,0 8-g-
@ 300 a
f
?
so o/. $
$00 W
m ,.
~
> 7 6 s: 2 4
n' N.
.M, T
i ,1[ y j i
x 3
( s % u g E u k y N
O E
K t
s T U .
G A s, 7I N W gH L 4 3 7 , 2.g aS IM5 2 2 2 -
3, _ _ x n.
pA 4 ,
,2 W 3 ,*o'e 25,2 23 i'. z a
- '2 -
f'. . .
I@i H4.. g t?2 . s
- A 2;- : ,7 0 3 A 7 . r 4
0 9
2 J
r e
3, 3 o . !g h' ,
l .
i g iD i .
e iw3'7'
.t;::
[W ,' $. m
.* JJ,
. j. = g s,0
- i. 4 Ya].-ts 3 2 3 .
04 0 .
i( _
r.
3 ,
0 E, ex" 3 - .ai -
D$
5 i.o
.\
oi
/Q y ,
,@ ".27 o..
42 4 .. a.j*Ss J j,0 4 g- ,o 1
k,.
o.
'd
. 3 3 uez ,T.f ,, o o, z.
s*gv.
3 ,
- o 3, s. -
o e. -
o
. . i o
, . w%
- .s, s5 s0
- a e.
7 4
- 4 4:
- U '-
. s
., u.
5,
.33 1:
D -
/*4'5* o. s. '
3 o--
x
. ss ." '<
s 2,
i o,U g 2 0
0, N i s
s
- i %
3 3
2
' u
\
s 4
~- ' ' 14 o os 0
0 2
m s. ,#.s s y i
g [\
1
,% ,2 2
2
, . 8 I
- 2 2m '
2
\f ,.
6 .
2 0 2
"oo 3 s g, s 4 , 3 2
s 3, . g 4
lj n
- I 2
3 3
4 s 5, o
\0 ,
4 4
\ ;
e 3 o g,
\,g 2
' . 7
- 3. r 7
4
@\ * ' , *'2,.
3 3 3
\ 4 4
3 P ..- g o #o 8 ,
g \) . .
0, 0 s.
3
- o 4
6 3
s 7
5, 3 , 6 3
3 4 *4 ) /
- s t \
.r s o
< 8 e
- .s s
. s9 =s 6 -
- o. 0 s 5 i 7
- s. .
s 2
6 e
s
- m. r
'o o a/
o 4
43*00' f .,
D. :, rio
..o . ,,. s ..m_... s. . 3..- , Aa ,
,e ,. _ s .,.,s
/
l *sro N y *L. .so.L as _ % :vs "
/ p x e
j R. , \ L a 4 ,
f* .. ,,, ,'O' j ,,, g~. ;;
. . i r,
'" ,r . '
/e .,,, y y q j -tsS*
g g - i,s .
+ 3cs
% v -rss'
- 2w ) -sso
,,,, -2 o*
..s, -
( .
' IS -
O 5 10 f f EXPL AN ATION b^
,,,3 WELL LOCATION AND ELEVATION OF TOP OF THE ST. PETER SANDSTONE gg CONTOUR LINES- -
^ CONTOUR INTERVAL 100FT.
g *@ 7 * " * . FAULTS- DASHED LINE WHERE PROBABLE FAULT; DOTTED LINE WHERE POSSIBLE FAULT OR FOLD.
NUMBERS REFER TO DETAILED DESCRIPTION IN TEXT gggg p $ m m c} <
I CITY LIMITS E2m8A9 f $ $ to z NOTE'
- 2) c m 2 uiE
- DENOTES ANOMALOUS DATA POINT, NOT CONTOURED
%y --Q
>im oe> OTHER ANOMALOUS DATA POINTS WITHIN Aym zmm MILWAUKEE CITY LIMITS ALSO NOT CONTOUREO (.
Qy$o T p 32 O C DATUM -ME AN SE A LEVEL A
ggy * * * **. FAULTS- DASHED LINE WHERE PROBABLE FAULT; DOTTED LINE WHERE POSSIBLE FAULT OR FOLD.
NUMBERS REFER TO DETAILED DESCRIPTION IN TEXT m :E: -1 m 3 I CITY LIMITS 2 m ali' pommc I-1o ><
-O CD m Ezmomz z NOTE:
f "E ' NN
- DENOTES ANOMALOUS DATA POINT, NOT CONTOURED "cm 3 mE OTHER ANOMALOUS DATA POINTS WITHIN
%M -Q MILWAUKEE CITY LIMITS ALSO NOT CONTOURED
>4m oo>
m5m zm"" DATUM-MEAN SEA LEVEL Q $o
-888 ;
E m -4 = -4 r- o O I T O w ,
E m O 9 3 E 'l 9
-1 O
, e e
,,..,. erw e,. ,s- ww se <s- ww 43 w P / ,
, t ch' .= ,...
d '
g
- es g 8 Tg, n::
a h
.v is. , 7 m bo
.=
[ '
l o
!.- V Q
n 9.. ~
b
( .. o/*..'
- t .
yv is
.. , -K.
N ffg_ .~ - "'A \:., <
".[, f .[.'
Q j J.%, :
... u.::. :: ~a\ %
>~
'J ~ ".t
- >.1
(
d\ '\ th
,.,, pp: . ,', , - *:a
\
x:7.. .
Q .. .
. sy , .:- - .- / 30 y .c. -
~
.=,,_
,p f '
~
(, ..
,g..
$ 4
- - *tes
. e r b l 7
- ~
,,, _, l l 'O "
p
. :.;,, -;.s y
- ~
s a ...-
. . . , ~, . - ~ n, c..
x y.
q- - -
.w.g.. _ :)
, p. .- #
azw\e
\
a see s u,n, s .,.
Mi
_. ~
..k! l *" --['
/
2
.=
~
( ..
e
, . >e t
s s , . a. ,% I p
4
/w ,,
,, .*y' @ ,
,,,, .ma
- .* j* *, "*
. ..', w, c,~ ,,
.,,, ,.. '"5.*',
42 is.
o
..,n~
/v . . . . .?
a Gy : .,. .
,/ -
, i ;/ i
se* 30' se* TT ee= 00' s \ a 1
\3 \o EXPLANATION
~ \ **
0 j _ CONTOUR Lit.ES -
9M-1 1 f CONTOUR INTERVAL 100 FT i
\ s
\ '
k,#@\
' I @ "** FAULTS -DASHED LINE WHERE PROBABLE FAJLT, DOTTED LINE
\
/
9 f I WHERE POSSIBLE FAULT OR FOLD f
i NUYSERS REFER TO DETAtLED
-l l DESCRfDTIONS IN TEXT N
& \ } ARE A IN W HICH THE ST PETER N g SANDSTONE IS DISCONTINUOUS
, DUE TO EROSION
.. l
[ Og NOTE
/ **
" OENOTES ANOMALOUS DATA POINT, NOT CONTOURED
,.. FOR DATA PO:NTS IN NORTHEAST SECTION OF FIGURE SEE FIGURE 2 5 t-9E w.Ig
- L' , * * * ,
[ (
DATUM-MEAN SE A LEVEL p O 5 10 15 20 n *
- s SCALE - MIL ES rga - ..,,, i /n -
7
! HAVEN NUCLEAR PL ANT
/ g FIGURE 2.5.1 -9F 8 '
STRUCTURE CONTOURS-TOP OF THE ST. PETER SANDSTONE WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT l
AMENOMENT 20 I,
4
erw .c.e .w ev v .c w or ,s
, i
- i
. 3 3,
- w TREMPEALE AU GROUP ABSENT l . .
p ...
8 .
.~
~,
w l #
,o@ .
p...
S P
t m
z
- ,, a
"- .' .TREMPEALE
. E' Nr Q ,.j. '
- ..."***.** .2 ,
. DiscoNTI
~ ~
goo.j ,,,
. . .. ;i * * . ' , ,.. c ,,
. .~ .g
~
. m *** .* ,,,
wq 5; ,,,
.= .
"****~ . r.
t,,, 7
, [ f
,,,idf,,
.m
. - . - - - . g =*.* **.T,'. . .s.-
,,ffe b *5
-d'.
c_ **.::..g$p: * '
,,., -t_z .:: ,. ,. /
_ xl g w m p
l
.= ,,,.a,, $g N .,..
/ .*
7 _ ,
7co / ?. - _/'=
7 f'
.,..,. - __ / ,/
3 V ,
t lE t wi , ,.= . p ..
~ j.go ... l-j-
600
- :~ - ,_...__w. 4, ,/"***_~._____..-_-
42 3, w.. *in
. g g N' 4x
= c ,., /
. . ,s ,$
g" S k" -16." .e a ~ 1.. wK. y.. g. ,-
4 2* 1T
es* 30' se* tS' se* 00' N
A EXPL ANATION P1
'" % ELL LOCATION AND ELEVATION OF TOP OF THE TREMPEALE AU GROUP TREMPE ALE AU GROUP ABSENT OR 900 CONTOUR LINES -
DISCONTINUOUS IN SUBSURFACE CONTOUR INTERVAL 700 FT
- *' FAULTS -DASHED LINE WHERE PRCBABLE FAUL T, DOTTED LINE WHERE POSSIBLE FAULT OR FOLD NUMBERS REFER TO DETAILED DESCRIPTIONS IN TEXT
_, _t
_ TREMPEALEAU GROUP CONFORMABLY ( 7)
OVERL AIN BY PRAIRIE DU CHIEN GROUP TREMPE ALE AU GROUP UNCONFORMABL'"
OVERLAJN t3Y ANCELL GROUP 4
/ O
/ /%,
,, sO D
NOTE.
1
" DENOTES ANOMALOUS DATA POINT, NOT CONTOURED DATUM- KAN SEA LEVEL 4, "$ .*;
y... -
N O 5 10 i f f 15 20 I I SCALE - MIL ES n.
,, .e elSCON$rN -- -- -
E LINOl$
HAVEN NUCLEAR PLANT FIGURE 2.5.1-9G
/ 0 STRUCTURE CONTOURS-TOP OF THE TREMPEALEAU GROUP (JORDAN FORMATION)
WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
, w.-,
a S s
,- _ -- - , , jid WEST D
8 8 8 8 sea -
j ,
440 -
p 423 -
TUR9tNE BUILCING f /
l
_ ls [', /
6:3 .
'b / /// / / '
PECESTAL MAT 7 ,,
/
, ,l , / / / ,
7 ,',' ,'/,/,i ,'/s
, ,/ ,
"2 -
,/,i ,/,i , y ,/,/, ,/ < , / , , / / ,i
',' /, / , ,
< / _ $.l h'I$ ' / ' li ,'/I'I 'h'/ /i
'I h
~ ~
hI' ,
k '
l55 kbS5', I' 55' ,
, , /, 't / / /, ,/ / / / / / , // / ,/ ,s s ' p 143 -
/ / , / / /> ,l /, / /,j
, / p',' ,' / ,' s ' , ,' / /
/ ' j
/ / / / l ' '
I ~f 1 1
,n _
+ 1 + I +
I t i t _ t + / + + ' r + 5* I
's '7'+ 7'.'~ '>'T'e 'T'+'T '+'T ; 7'+ 'i + ' '~'
+
~'. 'i' , - -
' ~
' , [ ,' ~ ? ,' ' ,' _~ ' * ,' L~ r'T + .C
- I'+,'$,'*:-?,'+,_I,'_I,?*,_~,
- 00 - -
- , b $, *
, i j j
~
o -\; i _. -, I p , b,
' ~.
f I e
,1
+ 1
-- I
+ =
wi -I t
! +
- .\
\ ' i
! -'i-!
- l
- 1
-I
+
1 I
.g _ _ LLE C $ N ELE 4ATiCN, FEET lwSL)
e . '
8 8 8 8 F FACAOE 6
A
- T PL ANT GRADE EL. 610 TIEBACM WALL REACTOR CONTAINMENT PE TUN EL a i /
,/ l , , , ,5
/ ,/, ,/,'l,'l/ ,/f f/,'l/l/
l / / /
/,'/*
,' / / / ,
/ '
i
/ , /
/, / ,
'( s
,/ /,
/ / / /, / / / ,
,/
, ,l / !, , ', , / ,' / , ,/ , ,/ / , /
/ /l,,/ ,/,' ,// // l, '/, ,,', / / ' ,/ /,/,/ /,i
,'k , , , ,l' f,/
l
.l / ," l/ , , ,/ l ,/ / / /
- p ' ,-
%'//,: ' , ,/ ,' , ,- /,/,/ /,/ /,/ ,/, ',/ /,,/,/// ',
, !, ',I , ',',
I
/, ,' / / , ', ,
'i ' s' /k'W !
,, , _ _ _ _ __re.st m ____
!,'/ l,, _ s', f,/ / l/,/ ,/l / ,f,, Y f
' +
/ / / / / TI
, l,,
/ I-I J' 'I //~1 -I I -
' ' 'n i IbI s+ I l',/ l /, ./
/ s
/ / , / /
/ l/ /
,s
/ j
/ - 1
+
I i-I
-1
/+1 I -
I -
I
+
I
}-
1 11
]
+ "I
- I I-1 I
i
+
'I l-I 1
i+ [
I - I
+
l-1 I
+
I-I 1
+
I I
- 1
+
1 - I i +
I - I 1 +
I r-
/ v + 1 F I & I & I + 1 + I + + 1 & I + 1 + + I + 1 +
J -I /- ] - J l - I f - r /-l -I I -1 I -} l l l - I J -I J l 1-l 1 - / /
Q / / + i r l l f, f - 1 I &
l I + 1 1 4 + 1 + 4 + I +- I +
I - -I 1- I- I - I I - } ~ f I - l / - I i- 1 - [ -I - I I - J l-1 1 -1 i - I 1 }
t 1 & I + 1 g i f a 4 I f I & I & I & I + + I w I L I + I & I by-
~l -1 -l 1 - - I I -l 1 - l 1 -I I -1 ] -1 I - T [ - - I J - [ l - l t 1 & I l-
- I + 1 + 1 + 1 4 1 + 1 + J- & I + 1 + 1 + l t i + 1 1-1 1-1 l-[ - 1 I -1 I - 1 I - l - -
I-I I - l l- 1- I-l / -l I-f + +'
~
F l f + + + 4 i + b +- [ 4 1 + / F i + 1 1- l- - 1 -l 1 -
r -n -l 1. ' -1 I - 1 1-I - i - 1 I - - I
-1 1 - 1 1 1 & I & 1 f +- + 1 F l- I + 1 I I + / f I + 1 + 124 1 4 I & I I - 1 1 -I l-i 1-1 1-1 J - < l -I l-1 1 -1 - -
1 I-I l-1 1-1 r! - l 1 -- I l-I
+ 1 + 4 I + 1 + +- +
l - I & I f- I t 1 + 1 -~ l 1- 1 + 1 1 - 1 I ,- 1 1 -l 1 -] Ie I - -l -
I I + + + 1 & I f i I -l I - I- I - -
I + I
+ 1 +
'OUNDATION (PILES OR D C AISSONS) ,,
E. O. B.
426.8
LEGEND CoupacTEDsteuCTua AtsA GL ACI AL TILL EAST silt, s&=o, sA=c, se,cLA, D t s u, uu, sci SAhC, G EhE A ALLY UHFC#u, StLTT CLAY / SA%DV CL AY,3 wEev STsFF To MAAO, S - 3
/ Scut GR AWEL (CL) 3 R av E L LY S AMO, SANDT GR GLA01AL L t.KE CEPOSITS SILYY CLaf, GENER ALLY u0t
/ j ST'FF, LESS TM AN $ % Frht 3
r BECPOCM
+
s-l C OLC uiT E
+ 1 V
==' monuAs e&TER LE VEL
'r NOTES I sT 4 AT sGR APwy a%T E R POL ATE D F
- t. 50it des:n,* Tens ARE sE=Ema TIEBACK WALL mE*E m T B4.%Gtc45 3 NEFE4 TO FLGwAE 2 5 4- tG FC4 4 E C 8 - E w3 CF 8;a,%G.
SHOR REACTCR CONTAINWENT (sEE
~,n'N ' l 0 /,//// ,/ ,/l //'// '////,/ J , '/,/ /l// , l
' ?%D lii i t '&; ,v
/'/ / / /
l/'
/ / '/ ' '
yQl,Q'l,/y/,n,);l7 l// /'< /
/ / y / o
/ / // ,Os
// /
/ %,Ilt\ !
\'
L l l/,// l l/l / /l /_// Q
/ ,
/ ' lfI -
/ /
f / / p // // // / / l/ / / / / , , l'
/ *' / / // // / /l // l/
///////////// l l / l/////l
\ '/ / / l
/ / / / l/ /
/
/ / / l l / /
/ / / l / / / / /
/
/ / / / l7 / // / / / / / / /
/ / / / / s/ / / / /
/ / / / / / /
p// / / /// / / // //l // // / /~j /'T- / 1/ !s-[ s
/ / / / /l/
/ / l / / / / .__' 2 J
/ / ,
1 1 I
' -e i --
f*[y a-j\ .,- r 1 -1 I - 1 I
+ + I + x 55 SE%~~~~ + 1
+
E-,V
- ~ ~ - m#
T W
+
~a
+
"-\
\ + \
\~ j_ \
++
- I
+
'- l I
' -l
+ 1
~
r-
, - )
+
1 +
, _ r }
T .
e + W \ t' < I + I +
l- - ' i - ! - ! ' -
l -I I -; e '- '- ! *! I - I /
+ e f
& } t - I + & e T VI ,
& & I +- & I +~ I f,
1
, - , , _ j _ , , -,
[- 1 1 - [ + + t !
j j_j j
+ 1 +-
L + + + t
_y j _ , ~ , f . ,_j I J
& I + [ .,,p [ ; / e p
-1 J - !
t I t - _1 g j
+ r + f + 1 1 - 1 J-) i
+,-1 T I
] =: J -
4 i / - I -} >
+ 1 f
+ e. + f +
I- ! I - l 1 l I- I f-I
+ & t I + I +
I I I - I I - I t i
+ + * ' + 1 I I i~l 1 ~/ '- / i ~ I --- l I-] I
& I + 4 + 1 + I 1
=2 I -[ t ' t - 1
+ + + l t +
I i -/ / ] - I + e 1 , - r l
f - 1 1 } l - ] 1 - [ - I _] -/ +
- o- * +
I >
- - -- i w - 1 , .
+
{ t s L, -o ! -, - iu i -i + 1 + j +
+ s 1 1- ) _. ; * * & & n +
1 '
-} 1
{ + y i - ' '
i-t
]
i
\
f f I l3 + j + t I-i l
+
! -
- 1 l-t <- > '- i ~1 1 -1 < -I T
[_t
+
!_ 1 1 -1 l - 1 + ~ 'j D1 +
t
-I
+
i -
+- + r J t
- I~'
t +
- - 4 r + *
- I-i *-
1
+
s e
t + l 4- f. $ _, ; ' y! - 1 ! - ->
~ !
__I! J
' -~ I i
' +
1 L i + l + l
- I + J I e i + l -r ., C *: 1 1
1-i -f f! !
' T ^'~T~ f- ] - i
- L ].,_f__ L u + t I-1 F I e
+ i ~ > + t t + ! -- i I ~r .. + sco to o 53 I f f t
w0el20mTAL sc ALE-F EE T E.C.8. HAVEN 426.8 FIGURE ?.
SITE EX WISCONSIN PRELIMINA
t LEGEND .
Coup ACTED stRuctuR ale ACanLL GL ACIAL TILL ,
EAST s.Ly, sano, sanov siLr, CLAYEY sity, CL ave r s Ano,
- D (s u , ut,5C) 4 SAND, GEhE R ALLY UNIFL A M, F #hE (sP, sM) sitiv CL Av/ s Anor CL AY, GEhER ALLY sLIGM?LY TO McCER ATELY PL ASTIC, vERv stiff to NARD, S-30% COARSE to FimE sAno, 50wf GR AVEL (CL) ,
$# AVE LLY SAND, sANCY GR AVEL, CL AYEY GR AVEL, SAND (sP, SC,GP, GC)
GLACIAL L ARE DEPOSITS SILYY CLAY, GEhER ALLY M00* g ATELY Plast lC,
- 600 j silF F, LEss T HAN S*I. FlhE SAND (CL)
SECROCM f ,,o t~ / I col 0 miT E h
_- monwAL e ATER LEVEL .
NOTES:
I s7 A A71GR A PM y eqf(RpoL Af[o F ROM BCRi=GS sHowe.
- 2. s0eL CESCRIPTIONs ARE GEN ER ALI2ED FOR CETAiLED DESCRIPTICms, - 640
.B ACK W ALL
- REFER TO BC#'NG LOGS
- 3. REF E R TO FIGURE 2 9 4- tG FCR PROFILE LOCATIONS.
620 SHOREFRONT PROTECTION (sEE FIGURE 2 5 $~IC)
/ / f' ;;,
/ / soo
,)
l / !'n,
! f , l/ ,',l
/7 // / l/ !it \ ' t
/ / / / ,
pggny l/ , l/ / / ,/ / ljj m
/ i
',/ ,/j// / / ,/fl,/ ,i, l l l l / p
\ \ . )' 'l' @ ,\ ,
nLL U ' $80 l / l /fl / / / ' / / ',;
l/ l l/ / /l/
\
p / / i\;\ /
-/,/ , , / / /
s ,'/f//,7 l l ll / / ///
/ / / / // l
' /
., \
I i l. ;>Lh' 'h l , / /
/ /
, p/ / /
!/////
/ / ,/ ,/ / / / ' l
/
/ / , l/
/ / / / / /
// //llll/
,/ / / / / /!/l/ s' / %\M\
j j l
/
l jfffr[/ p' / sl
' ,l /
'*0 1 - l 1-1 1 -i i-
{ / -
~T~-1 1-1 f
/ / / + '~$^ ~
+ 1 + f f I F l' I
+- 1 I -- I 4
/I i
I-1 - 1 1 -I I ~- E I C -I I ,i 1-1 I - I /-I / -1 1-] l_ l 1 -I / - l
+ 1 + 1 + 1 & I + )
+ + l- 1 + 1
'I l- r II l-1 I
l- 1 I -I I - 1 & & I +
+ I
- I I +
- m 1 (& ( Y 4-I -
I L 1 - l
+-
1 - 1 I +-
1-I I I 1
-1
+
i-1 1-l I &
~ 040
- 1- j
& & I 5- l & 1 l l-r + 1 I 1 -1 1-1 1 f + i i I - 1 I ~1 1-1 1 -l
& I F I -I I- I
+ 1 h I f I I
F I + [ t i + 1 + 1 I.,/ I- -
-I
]- J -1 I- 1 - 1 & J&
f f I i - 1
+ ' & I F I +- I +- I 4 I f I 1 - T -[
- + -I -n I
- [l_ _ _*
I I
I -I 1 i
' I - 1
-I I -I -
+ + + 1 + 1
+ - sto
+ + [ 1
& J l- I I -J 1 -l 11 l -l 1 - 1 I -l Jl
+ 1 + f
}T 1
I t i e I I t- I s~
Soo ELEVATION, FEET (MSL) sa 100 so f f
.R620%TAL SC ALE -F EE T HAVEN NUCLEAR PLANT FIGURE 2.5.4- 7 SITE EXCAVATION PROFILE D-0 WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENOMENT 20 i
-- - - - - - - - -- ~
WEST E
600 soo -
/
f 640 -
L' CONTROL BUILDWG SERVICE BUILDING AD
STO E RNTL sto -
l/ / / ,l l / y
' / / / / / / / i ELECTRICAL TUNNEL
./,l,/ ,/ , ,/ / ,/,
~
/ , I -----
/ / /
//////j/jj
/ ,/ f / ,/ ,/ p / ,/ p/ ,/ ,
y PIPING TUNNEL
~~~-~~9 gl 980 -
/ l l / / l /
/
/ / / / / / ,/ ,l ,/
/ /, / / , l , l, ,
l /,
/ / / l l/ / l// /l/ /
l 560 / / /
/// ,// /,'/p' p ' p' ,/ ,l,/,/ /
l
////l
,/ -
1 - 7" 1 -.
1 i T1 -1 's 'i 't -1 "1 -i i-
/ / //// / 14- I + 1 -+- l + / -+- f -+- / + 1 ~- I -+- /
, '/,/ / // / , - // '-l /-/ l-I -l /~l I-/ /-/ /-l 1-g " ytt // /f / + / + + 4 / + / + 1 + /
.ghs;- // //- / / -f
/ / /
,Qe
- m -l I-l /-/ / -l I-/ / -1 I-/ L .- ! /-l no' O @ / /4// + + / + / -f , -f / -f I + / -t- / 4- /
j / - // /~/ / - / /-I / -I / - / /-l / -/ /-I /-l /-l
%>CC / +- I + 1 +- I -f I / / + / + / + / -/- I + / + / -/-_
- / /-/ / -l / -- /-/ /-/ /- /-/ / --/ l-/ I-/ I-/
szc -
f- / ? / + / l- / l- / 4 / 4 / l- / 4 / +- / -/- / 4 / -l
/ - / /-l /-/ l-/ /-/ I-I / -/ /-/ /-/ /-/ /-/ /-/ /
~
+ / +- / +- / 1 / 4- / + / e / + / +- / 4- / J- / -f
/ i- i I-/ /- / d- / l-l 1- / 2-/ /-f /-/ l-/ /-t I-SOC -
f~+ / F / + / F / / / 4 / F I + / F / F / f / / /
3 4
~
4aE7 4eo -
E LE V ATION, F E E T (MSL)
- . ..L EAST E
R4 R4 t
/
f AUXILIARY BUILDING S)tio REFUELING .
- ASTE SERVIC E OtPCSAL WATER SERVICE BUILDING AND OUSE i
FEE 0 WATER PIP E STORAGE 7tNNEL PLANT GR ADE ( EL.6601 TANKS
'il\l'
/
CTRIC AL TUNNEL
/f / ,/
p
~~ y ,
$ /
PIPING TUNNEL
--~~--
g{ '/pl/
.NG TUNNEL / / /
\
s'/
INTERMEDIATE CONCRETE I
I ,
- /
p'/
STRUCTURE l
/ /
4 ' #
-~~~~~ ,K\,\
,- w w + r .
'1 a +r ~w _- ' ', ' ', ', x 1, ', '
', '. 1
~, ', ', *
,t, ,
/ +
i -,
1 -t
& &W 1 1
-+- -+- n j -+ 1 -+- t ___ -H I -r-
/ - J -l I-Y \/
+ 1 + / + / -<- I / I
/-/ /-l /-l - I /
l-/ /-/ /-/ /-l / -- I /~l /-I l-/ + / t / ~
. / %\
-I f / -t / +- / +/ /-l -
/ -/- / -/- /
+ / + / 4 / +- I + / / -I I-I i ~/ / - I -- / - - / ~ l /
I-/ I -I l-l l -/ /-l I-I !- I l-/
+ / -+- + / +- / 4- / +
/ + /-l / + //-/+
/-
/ + /-l / + 1-/
+ / -f / +/~/ / + //-l+-l-/ -l -l L -- I L / - I' / /-l .? 1-l +- I + /
l-l I-/ /
+-J -l- / + I
' I + / + / 4 / 4 1 + / 4- / + / + /
/-/
/
/- '
/- / /- / /-/ / ~
/ -/ / -/
/~/ / -f /-/ /- / /-/ -l /-/ / 4- / / /J //~/}- / J / + / .+ / + / 4 / /- / f / -l /
/ / / l- / }- / J / / -l / -f /-/ /~/ /-/ /-f / -l
-l /-/ /-/ l-/ /-/ /-/ 4 l- 1/i
/_ / -l
/ / / -f / + / 4 / r
/ + / + / 4 1-//
/ * / +- / & / l- / 4 /
/ -l / -/ '/ - 1 /-/ /-l
/ /-f / -l /-l l- /-1 I-l /-f /-/ /-/ /-/ / h I & ! +- / / / /
F / /- / + / / / / / / >
/ J / 4 / J- / /
sd .
4 EAST E LEGEND
""""*"'1 COMPACTED $TRUCTURAL FfLL 68o GLACIAL TILL SAND,GENER ALLY UNfFo AM, FINE SLTY CL AY /S ANDY CL AY,GENER vERY STIFF To Hano, S So% C
~ 0 i SCME GR AVEL (CL 3 GaAVELLY SAM), $ANQY GRAVEL, GL ACIAL LAKE DEPOSITS
~6** SeLTV CLav, GENER ALLY MODE e /
f , , STIFF. Ltss turn s% FRE SAN SOLID
- ASTE SERVtCE BEDROCK WATER DIPOS AL PUMPHOUSE l SUILDING - 62o TIEB ACK WALL
+ i.oaW AL . Area (EvEt 1 - 60 0 3 .g". (,0l l;ih sscaEracNr d_
.[ f/ ,/ / /
' - I
/ , hi l1 Q ,n:.
eaarcCrucN
- ANOCM R
NOTES:
[
pip:NG TUNNEL N
','[/ ///,
/ / /,/ / e' ' ' ljH j
FILL
\
/, ff
- so
'- 57a a"*"v ia7E"o' A7'o rao
- 2. soil ctsen+TioNs Ant GcNtnAut atrcn To son,NG Les f
f, f /
- l. ,,; d. q \ 5 "r F ra To munt
***oo'***'"'
-ie roa n r $ .s
/ f e
/ / ///
/ ,
,f i / / ,' _ .
h H Y' i- _
l's'
/ / / - $60
/_' s' //
l ' f // * / 'f f j TOP OF ROCK
~~~~~~~~ '^ \ , \ * ,= ' i _,Y, 7- l1 l i L~/ ll y; z/,--1 7- r ~ o 'o
, 1 1 '
' 1
,~ 1 '
' &' )7- 1 \1 -l /-/ "o*lo"T
l~1 I -l 1- \ / \- / l
/ A f / f / ^ *
I-/ - / /
b / A / \ \ /\ f-
/-l
/
1-f / - /T
/ +- / f L~ /- 1-f-/-/ /-l / -/
+ 1-l + / + /
-t 'T -- /
+
/ -
4- / 4 / + / + /
/-/ /-L -+_
I + /
-/ / -l / -I
+ /-()l / -/- / 4- 1 I
s /
/
T). f-f /- /
I . 'f I +- I
)~/ l-/ + /-/
+ /
s
/-f
/
/ -
4 f -f
/ 4 / 4-l!/
I-f /-/
4-
/~
- eto
//- '
/ 4 / l
+ t + / -f
/ -l / -/ 4 /
/- /-f]/-/ / /
/-/ / -f f /-/ / { (f -( f / -I
/ / /
J-/
/
/-/
4-
)-/ 4 / l-_
l / c- / /-/
{ / s ( + t - 500
~ ~/ - / / - ( L l O) / /
/ -l /
I & i f f
- 4eo ELEV AT ION, FEET ( MSL)
HAVEN NU FIGURE 2.5.
SITE EXCA WISCONSIN U PRELIMINARY
e LEGEND COMPACTED STRUCTURAL FfLL
- Geo GLACIAL TILL SANO,2NER ALLY UNiFORW, F$NE
$;LTf CL AY/S ANDf CL AY, GENERALLY SL?GMTLY TO 40CER ATELY PLASTsC, VERY STIFF TO M ARD, 5 30 *r. COARSE TO FINE S AND, g
-460 SOME GR AVEL (CL 1 GRAW ELLY SANO, S ANDY GR AVEL CL AYEY GR Aw f L, S ANO (SP, GP,GC )
GL ACIAL L AKE CEPOSITS
- 640
/ /j SALTY Ct av, GENER ALLY MODER ATELY PLASTfC,
/ f /, STIFF, LESS THE N $ */. FPsE SAND (CL)
SCOROCK
- 620 O 00LCutTE ALL y NCR W AL W AT E R LEVEL .
60 0 SHCREFRONT PROTECTICN
)
v ' : h (l,,3EE FIG. 2.5.5-10 RANDOW FILL NOT ES:
^,'dfi \ i. sTR ATiGR APMV mTERROL ATED FROM SQRiNGS SMO*4 f
f' Q, idthpn hn d ,
/ j f
_ _ 3Ro 2. sc4L EsCRiPTICNS ARE GEN ERAulEO.FOR CEfAtLED CESCRiPTIONS, RErER To somNs Logs
\
f- pi .
5 REFER TO FGvRE 2 5 4-16 FOR PROFILE LOCAftONS
, q!j,ju.pj j /
/r/,/ / ,/,-lQ.
-i,
/ f f f
[di,ij - f 'f f
! s' s l ' ,/ / - s6o I I
.p' <so
~
+ j so soo y [ ' + ' j~ o ' '
i.- ' '
-f j _f 1 -f i & I t / + / - s* o McR,z0NT AL SCALE - FEET
_, f __ f f_f f ___ f--
/ +- / + / 4- I
_t -l /-l
+
/-Q -+-
1
/ -f _ l
/ / -l / -l /-/ - sto 4 / -} / J- / 4-1 -j // t-/ l-I / / / # / 4 /
t- l l- / /-l 4 //-
] f / / / _
- 463 ELEV AT ION, FEET ( MSL)
HAVEN NUCLEAR PLANT FIGURE 2.5.4 - 8 SITE EXCAVATION PROFILE E-E WISCONSl = UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
. s 2.
WEST F
8 8 8 680 -
660 -
b 640 -
\
V-620 -
TU R BI N E BUILDING OFFICE 8LO
/ ...
PIPE TUNNEL gng j, f , j,
/j/ f /
/ / / /l/
/
' j '/ /// / / /// j '
y PEDES TAL M AT j ,'
/ r
~
/p y'i'#l '/(f'hf '//$?
' fl/,'/ 6'/ ,O,'/ 'l ' f
, /
/ '/
Wf','/9,'//F/: -
',/ ,! ,/ l / / // !,' ,,, / r y / p , l l f, / / /
, , ,/ / /
/ / / ,' ' "
/ / /s ' p' E '
f, , , /l /// / p' / ,
/ l,/ l7 /, s' / p'k /, ,/ '/ 7 ,
l ,! ,'/ s ,/ ,/ f ,/ /
'*0
' ' /, /
/',/,/,'/
/
/,//
/ /
//,l( ,7'/
/
/
/ '/ / '
/
,/
/ / /
//
/
/
,*//,
/
'/ / //
/
l
/ ///
/ /
/ /
/'//,/ / / ///
/ // / /
/ / l/ /
g i/,/ / /,
'//
' ,%k
, ' / ,
',}/m'//,
. ::/;%':/:%,9 .&' ;: :::
..o ,
/ %j::'+ ies" oN dC[$ m* of Q '+ ' ~
?
/ / / .
s, .
~ *. -
sgo .
hygjghEhsh*sG1
- 7. ~.- ~r M
bs'.'b'j%hjjy/j'[//,
r ~
- 1.
- L
- "\
g T $455E9d l$
- \l
-.
- l_ '
- [ A 1
1
- ~
L
~
Y
^*'
i
'*^
![/i-y -, . - , 1 l *' ' * * '. ,# L,* \ '_. ,
- l1 L *
,L, , L L, i
, 1 -, ,
4
- 1 L *' ' , L, >
,L +-
L,*
- ,'*l, 1
L,* . L *
-.,~,i
, L , ~* i
- ^
sco -
'-.,,_-.,1 *'
- ~
L,*,l,*,
, _ \~ *
- ~
L , *'
L L,*,
^*
-.. , L .'
L -, L _, s
'. , 1 _. , "
' * '~
l1 *
, i *~,_ ,
1 Li '
i L % L' ~*~
z -- 1 , L , ~*~ 1 -_ i ,L,~1 1 -
- i 1 _
+ ! ,
1 - ,
i
- l,*,L,*,i ~\ -,
- L , * , 1 , * , _. , ~ '
. 1
, - 1 l , -' 1 i L ~,L 1 n L 1 -- 1 ^~ , i i , L i
,_,-+-
- 1 i i 1 i
+- ~
eso + I + t + + 7_,+ z 1
- + ,
s-
+ ,_ _ , , 3 _ _ ,
+ +-
+ 4 +
, _ + _ -+-1
+ 1 ,- s ELEVATION ){
FEET CEEP (USL)
FOUNDATK)N P'LES OR DRILLED CAISSONS
~
8 8 8 8 8 s
FAC AD E PLANT GR ADE EL.610 REACTOR OFFICE BLOG TlEBACK W ALL CONTAIN VENT
/ / / / ,/ / ,/, }-
/ / 7,,
/ , / ,,
/ ,/ / / 7 7 g
,/ /,
/// ,,/ , l / / j' / // // // //,//
PIPE TUNNEL , /
i / / / <
/ ,/ / ,' / / / < /
l / / /
l/ / ,/ / / / / / , * /
T / l,
/ / / / / // // / ," / / / ' / // l / / ' '
'//
t /
/ / p/<l//
/ /
/ /
//
/ / / l ,,'/
/ / / .'
/ / ,/
/ / / ///
/ , / // // //
/ ,p / / / /
/ // ,, / ,)
// / / l / 'l /
r l l'/ </ // ,/ / /// / ,/ / /
< / / l/ / '/ // / / / / / / / / /
/ / / / / ,'/ / / / /
'-// /
/ / /,',/,/ / / / / // / / / / / / / / / / / e
//' / / / / l/ / e
/ / / / / / ,/ ll/ / / /
/ / / /n
/ >
/ / /
l
,', ,/ ,/,l, ,// j/,, ,/ / / , /
/
l '
s l/ / / /, ,/ ,/ l/ / / / / ff
~~' F - ^ 'fT f -r~
' ~
Mr ~
TCP CV ROCK
~ ~ ~ ~ ~ ~ ~ ~ ~~~~
/ / -~ '
/ / y
/ ,/ / ' l ,l /
/ / .ll '/ ,, .
. a,qp W u
- s. >
~
- -+--
' ~~ 'lu I rl'
~~ ie f l'+
' T~_+
7 -+ 1
+ T + >
/ / '; ..v '
%g9W p{oys MC -
e
'~
r'+- +
7 4_
~ '
+
+-
' ~
+
- 1
, ~ ' ~ '
[ _+.
_'~' - _,_ 2 - - --
.+-- -- _,_ 4 # -1 d . ,E.
$,ei ,
O + j
+
g' [ [4-t- ' ~ l+l Il r ~ '
ypg g
- E - - -
_~ - , _ ,
+-
$[
'1
^'.-l_~~,~
' ~~~
-+-
_' -+-
,_. , ' _~~~
$?gdp: %,+ +
^+-
+
+-
1 -+~ -+- + E v i -Y Z -9~
- ^
1 ~t T -t-
- ~
_I h T j" t 1 -t-l_
I
~'
- E_
- ~,_ # ' *~
^* , __
- + "
- ~ ^*~
r - ,
- ^
1 1
, - , I I i I T
--1 1 1 I L - I I E I I 1 I -
I I I I b I I I I 1
N 1 1 g 7 -
I 1 - I W
~ l 1 3 -
- J
, t I I 1
- 1 E
-~ +
, -. I ~ l s - 1 I
-+- ~+- I +- ~ *
- y
-+~ -+-~ I l ~ l g .g g g
& +- I -+- I I l_~
1
-+-
1
+~- +- I 1 -- 1 1 1 i =
I 1 -~~l I -- I I I I ~ l 1
7 , 1
, ' - ' . . 7 - 7 a.
^ '
-I
.+.
I T'.+.'~'.+.'7,.'~~'
. I - I -
f
- 1 -
1 -1 _ _;
+ _
-+-
o.o EOS EL 375.3 S
LEGEND EAST F COMPACTED STRUCTURA6 BACnFLL 8 6 '
GL ACI AL TILL 6 SILTV S AND, S AMOV SILT, CL ATEY SILT, CL AYEY SAND (SW, ML, S S ANO, GENERALLY UNtFORW, FINE (S7*
SlLYV CL AV/ SANOV CLAY GENERALL MODERATELY PL ASTtC, VEbr STIFF TO MA COARSE TO FINE S AND, SOME GR AVEL (
GRAVELLY 9 AND SANOV GRAVEL, o".W Q M.O CL AYEY GR AVEL, SAND (SP, $P,6C)
GL ACIAL LAKE DEPOSITS
% SILTY CL AY, GENER ALLY MODER ATELY STIFF, LESS TH AN 5% FINE S AND (C f
BEDROCK
' T ,' J, DOLOWITE 4 1 Jdl h NapwAL EATER LEvtL NOTES.T srR Arre#APNY >NTERPoL ATED MOM PTIONS ARE GENER All2ED FOR DE
- 2. Soll CESC#:
. DESCRIPTIONS, REFER 70 80 RING LOGS.
5 REFF,R ?3 FIGURE 15 4-16 FOR PROFILE LO A. EOs -END or e0R:No TIEB ACK W ALL REACTOR CONTAIN Y ENT ,
d' SHORtFRON
/ / / isEE Fisum E 2
..-. - / / / //j ,/ // / / / / / / / , . . l lwt U' U u, i m
/
/ i ,f / .. / // / ,/
1
/ / ,f ,i i ,
, ,// i
' ',' ' i'
, /// /// /i / '/
' i - /
/ / /
fh h,h n i / '/
</ / / i ,,'/
/ / / /
/ / l'l/
/ /
/ ,/ / / / /,/ / / -
l l / ll ,f
, ,i / / / / l/ /
l
/
/
/ / / / f f
/ / / / / / / / / I / / / / / ll// l/ /
l / / / ll/ / / ' /
' l /
/ / / / ' / Q ' ,' , ,s,', ' , / , ' ,/ ,' ,' ,' i , ,
' / ,/ ,i ,/ ,i ,/ ,/ T W - -
r,",_ + t ma :s m,h+'\Q +,Ll+T[ m ~~ K
+ +
- + ,: 2 . , e
'. "L'* X +.
4 TN 4_ -
7
--'L' -
'- I Y t # - #
a-
' p'. 7 7 -- 1
=w' A (
T- _[g } M\ ,,, . ~,-
- - < ,_ -y .
r - 1
~- v -
7 n
'l'# c .
.' i -- i ' ' ' ' - " .
1 - 1 1 -
1
- 1 1 - 1 1
r g _
_i^ a- ,. , -1 1
- I 3 __ - ___ -+- *- _ ,
, ' n' r
' _ _x T -- r
+- - ,
y _ g
+' ,
I - f-~~~ '
. ~
1
, - * ' *~ - , ^
7
~~', -c^ 1 _ _ ,
- '. l_ + * ]_ #_
$ *^
+- -, -
, ~. *^
.L r
+--r '. > 1 L , ,
+ 1 # #_ _
+- :.,---t.
i .- 1 _" '
1 L, i h W . '. r ,
u
_7 ++ _
x, _ ,
+ 4-l c >
~'*h
, 1 dI - U- r -- +- , _ , [ + , ~+-
hr*,
4- Z
-+-
L ' -,
+ + 5 E
_ p.
1 I ,
'h I
& + ~
i -; ' - 1
- + '
&^ - 1
' + ' _g ,
s i --- + + --g ,
1
+ r- ~ #
E
~
E ~ z ^" r '- '
~T i s
~y - L ,
u
, _, *T 'I
+
1 Es *^
r i -. r
-*^ ' L +- ' ~ '
E , '^
' , l. * , ,
M * '
} r
- L,*,- L 1 1 _ ,
e 1
+- r t- #
- 1 ,
+ - Y -
100 f
+- ~ I ' - I g 0 S,0 I_,~. 1 -
Nomi20MT AL SCALE - FEET mu EOS EL 375 3 HAVEN NUCLE AR PL FIGURE 2.5.4 - 9 SITE EXCAVATION PR WISCONSIN UTILITIES PRO PRELIMINARY S AFETY ANA
n~~ .
LLAND EAST CouPACTED STRUCTURAL SACEFLL GL ACI AL TILL SILTY S A ND S AMOV SILT, CL AYEY SILT, CL ATEY SAND (SM, ML,5C)
SAND, GEhER ALLY UNIFCRM, FfME (SP-SM)
ST TOPA 0%
OE R AT E L Y LA COARSE TO FINE SA 0, SOME GRAVEL (CL)
GRAVELLY S AND, S ANDY GR AVEL,
/. QDOWCL Af EY GRAV EL, S AND ( S P, GP,GC)
GL ACIAL LAKE DEPOStis
$f LTY CL AY, GENER AL LY WOCER ATELY PL ASTIC*
STIFF, LESS TM AN 5% Fl4E S A%D (CL) f
- 660 BEDROCK 00LQ uiTE 4_5T 40pMAL e AT ER LEvtL i STR ATiGRAPwy INTERPOLarf o Fuou soRiNGS sMowN - 640 NOTES 2 SOtl CESCRIPTICNS ARE GENER ALi2E0 FOR DETAlLED CESC#tPflONS, REFER TO BCatNG LOGS 3 REFER 'O Fi4uRE E 5 4-16 FOR PROFILE LOCATIONS 4 E O B -END OF 60 RING
- 620 T!EB ACK W ALL
/ / f
', jt SHOREFRONT PROTECTION - 600 j
- / / / , ,
(SEE FIGURE 2 S S-lo)
- / [ f# p/ / / /
/ / j/ /
/ ////// /'/' !! j ff lfl j, ; /
' RANoou
,/,/ ',! vnLL f j V// / // '/' ,'/ // '
,/,//,/,//
/ '
/ /,//,/ )' % , n' n \
\
f / / / / / '/ ,N/ / / / {/ / /' ' , / , , f,/j ,' , ' /
f
/
///,/
/
/ /
/ / / //
,/
/
/ / i y' ,,'// // /, / / / ,,/ / // / /l///.
/ ,/ / / / /
, /
//
/ ,n, 1
'l .
{ >' ' \ ,
' /
/
/ // ,/ // // // // / 7 / / / / / / / / .* / .' / / /l/ / W1!
+ 4
/ / / -
/ ' / / /
///// // // // / / / /l/ / /// // //// / / /
/ /
/
, , ,/ / / / / / // / / / / _ seo-
/
l -M-h[ ^*~-f','hI [
/ / / /// / // // cL // // / / / / / / // / / ' / / ;- 2 7
/ / / / / ' /
m 1 4- #i ' q.-
L37-T" '7' "
5
' -1
.c ,
_4 u
- - 2 L.s-T x L-V 'T +,
- l-TQ s+- + z ksgyx--_Q--r xT': l "- l f-*4- !I: ;* , m'L: l' ' + r L , - l _C ,
1 s ,
a -
sAQ r
, -5 "- ,
-+-
3_ -
-A 1 % _' .
,- ^ "-
"- _ + ; +-
~
&cW~[* _ZCf~T-- =- r pf* ^ ~~ T
- 1 1
1 1 -_
_L__t ,
, .L , "- , _,
g -_ -+
r +
T T
z ,
x ,1
- 1 3-i
, +- 3 ,
-n >
9 ^- T ' -r-- T t- -
r- -
--r-
$1.
} h-r-L. t% L e'_
- I t
- L 4--
~'i ' + T + - -,. '
-~ ~
520
, __ , -*-- ,3 y '
7- #
- ^ ' + ' j'" "
, ~
L ,-e _ , 3 , _
+ 7- + 7~ + '
+ i +- i f'y
+-
[ ' -+ TT'- '4 1
T I _ _ ,
d'7 I
,4- I
+- 1
+-
e lY +
+
+ '
Y'+
7'. '
T'
~~ '
n- 'T v
'T'.i'
+
T ' + ' T ' + ' ~~ '
1
+ 1 , -r ,
1 3, ,
- 1 n > _ 5Co W_L-- t 100 1p 0 6,0 MOR120NTAL SC ALE - FEE T
- 460 ELEVATION FEET (WSL)
HAVEN NUCLE AR PLANT FIGURE 2.5.4 - 9 SITE EXCAVATION PROFILE F-F WISCONSIN UTILITIES PROJECT PRELIMINARY S AFETY ANALYSIS REPORT AMENDMENT 2OJ
. _ - . . -. -.__. _ ,. .wa.:1 f* e, ? ~ '
ora, 630 -
U \
. / / i
' ,/ ,/l ,/l ,/,/ ,/
~
/
,' ,' ,' p' / ,/ ,/',/' 7 ,l / /
l l
$70 ',/ ' / l / ,/ , , , l/ / / , , ,/ , / l / / /,
j ' l / / // / / / / / / / / // E l / / /
/ /
/-/
/
/
/-/
i
/ s
/-/
s'/s/
/
/-/
// /
/ /
/-/
/ /i
/ / / / / / / //////
/-/ /-/ /-/ /-/
/ /
/-/
/
550 -+- +
, ,f_,',',',_'_,','_,',',+,f_,+,'_,',_!, _
' * ' * ' * "'~ '
/ i / i i . '- i - i'-.- i i-i 'i !. i 530 -
ELEVATION, FEET (MSL)
4 4" 4D '
0@SD o*4 $
g '- - 630
[ _
610 OTTOM _
3 RANDOM 7/ " # .
l' NWL 590
.f. EL. 580
' '##' 7 _
$ p# ',' p
' / ,'
/ ,
l ' N // 7 ~
570
,/ /
/ / s '///// / / ' ' -
As - . .;
/// / / /
/ /2 / / / ~'W /// // / //
/ / / / / / / ///// ' /// / /
/ / s/ /// /////
/
/ * / / // / / // / / // / / //'///////
/ / // //
/-/
/
J~
/>
/ / / /
/~/ /~/
i
/-/ J-/ /-/ /~/
/~/
/~/
'*' ^ 550
~/ / ~ / / -l ' ' i .'- i
- i'-. * '/ * /
r ',* i--i
' * ' '
- i /
i / i /
i i L-i i i
-- i > i
- , !- i * '
1 -- i / i 1
i i Li i _
- 53o ELEVATION, (MSL)
LEGEND GLACI AL TILL
'/
- i SILTY CLAY, SANDY CLAY, GENERA
,r $ 5-30 /o COARSE TO FINE SAND (CL)
GLACIAL LAKE DEPOSITS E Y PLASTIC,
' StLTY CL AY, GENERALLY MODERAT L
/[,// STIFF, LESS THAN 5 /o FINE SAND (CL)
/ ,f j/,
BEDROCK Li ,- 1 3
7 e j DOLOMITE
/-/
SHORE PROTECTION ROCK ARMOUR,8OULDERS AND COBB 2 PHREATIC SURFACE
- 630 ENGINEERING SOIL PROPERTIES
- 610 LONG TERM DRAINED CONDITIONS TOTAL LAKE BOTTOM _
SOIL UNIT FRICTION COHESION C (psf)
WEIGHT ANGLE,f
- 590 UNIT NWL (pcf)
)_ _
1 136 28* O 28* O 128
/ // / /
/ / /
- 570 2 38* O
/ / / 3 15 0
/ / / / // / /
/
/ -
/ / / / / / /i
/ / / /
'~
' ' ~ ~ ' -+ 'T '- - sso 60
,-+~, 0 3,0
__ SCALE-FEET
- 530 ELEVATION, FEET (MSL)
HAVEN NUCLE AR PL FIGURE 2.5.5-6 PERMANENT SHORELI GEOMETRY AND SOIL LONG TERM DRAINED WISCONSIN UTILITIES PR PRELIMINARY SAFETY A
LEGEND GLACIAL TILL I/ SILTY CLAY, SANDY CL AY, GENER ALLY SLIGHTLY
- 4 TO MODERATELY PLASTIC, VERY STIFF TO HARD, j f.; 5-30 /o COARSE TO FINE SAND (CL)
GLACIAL LAKE DEPOSITS SILTY CL AY, GENERALLY MODERATELY PLASTIC,
////,/ //
STIFF, LESS THAN 5% FINE SAND (CL) 8EDROCK i i
,- I DOLO MIT E
/-/
SHORE PROTECTION ROCK ARMOUR, BOULDERS AND COB 8LES IN DISCRETE L AYERS(REFER TO F IGURE 2.5.5-10) 2 PHRE ATIC SURFACE ENGINEERING SOIL PROPERTIES LONG TERM DRAINED CONDITIONS TOTAL Soll ' UNIT FRICTION COHESION UNIT WEIGHT ANGLE,@ C (pst)
(pcf) 1 136 28* O 2 128 28 0 3 150 38* O O 30 60 t I 1 SCALE-FEET HAVEN NUCLE AR PLANT FIGURE 2.5.5-6 PERMANENT SHORELINE SLOPE GEOMETRY AND S0ll PROPERTIES LONG TERM DRAINED STABILITY CASE WISCONSIN UTILITIES PROJECT PRillMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
[_,,," =
0.13 g G ,, \ '
4\b .
O. 2O g _ G s, \
650-SEISMIC ACCELERATION NOTE:
630 - PSEUDO STATIC INERTIAL FORCE OPPOSITE IN DIRECTION TO ACCELERATION 6' ~
-'/////r//
v \
?/ ' a -
/ ,/7 / /^ /: / f p -s
/y '
/ // / / /' / /
/// /// / /' s
/ 's ,/ ./-/,.p ./~;/,////, ,
/,'f',/,/,' , ,
/ '
,, Q,!,/,',?/, ,
,t,hg',7, ,,
etf'ffffffffffffffffff#MffffffMw 330 _
Vfffff/LW/MffffffffdF#
7 '
+
+
l
+ 'T'+'T'+'T'+'T Nil #18F4
- -- / /~/ / -/ /~/ /~/ / / / -- /
~
~//-/ / -/ / ~/ /~/ / ~ / / ~/
V ' #
- ' ^ ~'~ '
i 1 i i i i -'. , i i 530 - e 1 / < e e e ELEVATION, FEET (MSL)
LEGEND GL ACI AL V/A' GLACIAL BEDROCK T ' + ' ~i
+T
/ SHORE
- M 2
- 650 630 610 LAKE BOTTOM
!I' RANDOM FILL NWL 590 f EL.580 7 _
fbh$$$
i ,
f _ syn
!//// ,
s
' ' / / W'N W'N's
/ ~ /
//' '/ i' ' /-
/ -/ /~
- / / - / / -/
/ + / & / -+- _ $50
-+- / -/--
- i
/
7'+'i ,- t i
~'
+
1 T ' -+ ' 7 ' + ' T ' + ' ' ~ _
-- t 1 ---- l / / / _
1 i ! -
i
-530
! ! -/ /
ELEVATION, FEET (MSL)
LEGEND GL ACIAL TILL SILTY CL AY, S ANDY CLAY, GENERALLY SLIGHTLY TO MODERATELY ,
PL ASTIC, VERY STlFF TO HARD, 5 -30 lo COARSE TO FINE SAND (CL)
GL ACIAL LAKE DEPOSITS SlLTY CL AY, GENERALLY MODERATELY PL ASTIC, STIFF, LESS TH AN 5'/o FIN E SAND (CL)
BEDROCK
-1 I-I f_ DOLOMITE
-+- i SHORE PROTECTION ROCK ARMOUR, BOULDERS AND COBBLES y ,
IN DISCRETE LAYERS (REFER TO FIGURE 2.5 5-10) 2 P H R E ATIC SURFACE ENGINEERING SOIL PROPERTIES SEISMIC CONDITIONS TO TAL UNDR AIN ED SOIL UNIT F R IC TIO N SHEAR UNIT WEIGHT ANGLE.[ STR ENGT H (pet) (psf) i 136 0 2600 2 150 38' O 3 12 8 O' 2400 4 128 O* 330 5 128 O* 1150 6 128 O' 2900 3P SP SP SCALE-FEET HAVEN NUCLE AR PLANT FIGURE 2.5.5 -8 PERMANENT SHORELINE SLOPE GEOMETRY AND SOIL PROPERTIES SEISMIC LOADING CASE WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
.; M
\
I 1
~
a n
)
[/ A 't, f W
'o ~O x
~ $ $
-... N ~
NOTE:
NN h '
- 1. ALL ELEVATIONS ARE BASED ON I y ME AN SE A LEVEL D A~ UM.
- 2. COORDIN ATES ARE B ASED ON WISCONSIN STATE COORDIN ATE SYSTEM SOUTH ZONE.
- 3. TOPOGRAPHY BASED ON AERIAL SURVEY BY CHIC AGO AERIAL SURVEY.
- 4. FINISH SHORELINE IS B ASED ON NORMAL WATER LEVEL (NWL) FOR L AKE MICHIG AN, WHICH IS EL. 580 FT. M SL.
~~'
/
- usi UNIT 2 N 681,359 E 2,598,830)
\
x y 62s o - [ 1
~ r
~
~
X r
i
/
t '
FINISH GRADE EL. 610 l;
3% '
Y
/
W i
l TOP OF SLOPE EL.610' l
t y-)- s ed
'l X X- X-N N's x. 3 _
h:
r J-
}- __
c C / "
LIMITS OF CTIO '
V
~
- 582 _ "
FINISH SHORELINE _-
L l _ _
2 '~~- ~-
\'- .
N 680,805 80_O*
L E 2,599,310
& 95O' 3M -
A
. UNIT 2 N 681, 359 j E 2,598,830
\
245.5' _ _
245.5' / _
fJ f +-
N+ \
'N, f 3 m v/ j x \ 'N s
/ N h FINISH GRADE /
EL. 610 2M (
i
's. N J - x ._N L ~ v 's -x -
-~ h /
, M y/ y-eio w x- w enO ~ ,
Lr'
~ y- T
/ W ...
h')t~
I- EXISTING SHORELINE FINISH SH0 RELINE ,___--------~~~~~C _ ,
~ ~ ~ ~ ~
- - - - - ~ ~ F 0 E O C 10
~
APPROXIMATE Ll (BENE ATH WATER SURFACE) 800' , ;
950' 1740'
' o I
l x NS A' x l'j jX ii j
UNIT 1 ,
N N 681,850 K
i,h8(6 E 2.598.830
~ x MON. H-3 l N682,202.342
/*8
~
t
_ N s E 2,598,810.346
'\ 6,$
. EL.627 59 f /f//
/
Y;// lC,. 'Y' j'j!
s' r i
~
j~ j /' ,. llY /
-+
N
(
x x
- M
/)
i lf /
L -
N I ~
= if!, / l 1 fj N r- \.% '
) %'
m N )i
\ ;- Q F p [py 9 @ x,4
) l
\[ y [I' t I'
' og gS
/-
'X
' N \ A g, lA' !
-X
+
U Jh b,. t*[
1
/
-A 4 + }']
=-
%)
}
-. -y
~
- ~ -- 'l,- ,,
-l I ,/ .Q" \
- ~- '
l.7 == ' %)
[
SHORELINE
-== -
.-= - . - _ _
N 682,325 E 2,599,230, LAK E IOXIMATE LIMIT OF EXCAVATION 720' 7
790' r
N
5' x,, N s .Ix/ /
,. s It i ll(\
\l)'
j Nh !
) ; 1'em.
,i s
, '- 90 'n') r
\
\
{ :l M\
_ ); '
' lJ,./, -
,,,mxN \j /!e l
+ '
). 'j/!/ii '
~,
l !! 1 e l ' / ;/
,//
,'9.
u, '
c\
U ,
,,f4,,# -
v i ' , / ;
'? o
- y-g,W'7 b \v/ tl.i ., /
- -
p 7 i
,i'^
~
JL JL A N g / e ' ,.
], \ kk \
f' /
.o ; 8
.h (s . ,
gj N
' \ (\\\ "// 10 q ;- !!
y ll/y\/ / 1
\\\ W 'Q((
N . 33; p -
l ,
9 'O I !),'k!
\(<;/((,'"/gg;
, d l g , .
MITS OF iy (
)ROTECTION ,
< 'ls N p% - -
y s
_t
- y'
. l? ,, -
% s
~~' p =4 > g
~
V
~ y O 10 0 200 I
t E SC AL E - FEET HI G A N HAVEN NUCLEAR PL ANT FIGURE 2.5.5- 9 SHORELINE MODIFICATIONS HAVEN SITE WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY AN ALYSIS REPORT AMENDMENT 20
/
l '
,))) ff
,'j /'h N\J n'l )lh
' lI
\ )
!J' 3 f 6 \
0 [L/ j' 2.342 /p L Q' lll )#
g h '
1 wflh&lhhh ,
MITS OF N
( 7 g PROTECTION l ,,,
w g \ ,/
$. 3 L' / / ,g s E.
VI //
~
v
//
O 10 0 200
[.
\ SCALE-FEET GAN LAKE MICHI HAVEN NUCLEAR PLANT FIGURE 2.5.5- 9 SHORELINE MODIFICATIONS HAVEN SITE WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT
=
AMENDMENT
. . _. . _. e4 EL 620 -
610 -
SEE TYP! CAL SHORE PROTECTION 600 - 3 13' 26' 16' ll /
590 -
580 - I # '
i SE 570 -
- >.x>n s.~, . v RANDOM FILL FIRST UNDERLAYER 435 TO 800 L8 UNITS (75%>620 LB)
DOUBLE LAYER 4700 TO 7800 LB q ROCK ARMOR STONE (75% >6200 LB)
TYPICA EL 630 -
620 -
610 - SEE TYPICAL SHORE PROTECTION 600 -
NWL EL580 3 U ~
13' 26' 16' ,
+
580 -
APPROX bl I 570 -
g , ,, SE LAKE BOTTOM , FILTER CLOTH 560 (RANDOM FILL EL 630 -
620 -
6 10 -
SEE TYPICAL SHOI . PROTECTION 600 -
l NWL EL. 580 e 13' 26' 16' SEC 570 -
APPROX LAKE BOTTOM
\q ~~wfui~
560 RANDOM FILL
FINISHED PL ANT GRADE
~
s EXISTING TERRAIN SAND E. GRAVEL FILL SECTION 1-1 B
(6*
FILTER CLOTH s.
SECOND UNDERLAYER 15 TO 45 LB UNITS (75% >30 LB)
TYPICAL SHORE PROTECTION (NOT TO SCALE)
EXISTING TERRAIN N _
FINISHED PLANT GRADE O 20 40 60 1
I t i SCALE - FEET SECTION 2-2 .
EXISTING TERRAIN
-FINISHED PLANT GRADE ,
HAVEN NUCLEAR PLANT FIGURE 2.5.5 -10 SHORE FRONT MODIFICATIONS SECTION 3-3 WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
WUP PSAR Amendment 20 HAVEN 2/79 HAVEN SITE ADDENDIM LIST OF EFFECTIVE PAGES CHAPTER 9 Page, Table (T) or Revision Piqure (F) Number 9-i and 11 20 9-111 19 9-iv 20 9.2-1 16 9.2-2 18 9.2-3 16 9.2-4 thru 6A 18 9.2-7 thru 12 16 9.3-1 17 9.4-1 thi:u 3 20 9.5-1 18 T9.2.1-1 18 T9.2.1-2 16 T9.2.5-1 (2 sheets) 16 T9.3.6-1 18 F9.2.1-1 thru 5 18 F9.2.3-1 20 F9.2.3-2 and 3 15 F9.2.5-1 16 F9.4.1-1 20 F9.4.9-1 16 EP.9-1
NUP PSAR Amendment 20 HAVEN 2/79 CHAPTER 9 AUXILIARY SYSTEMS TABLE OF CONTENTS Section Title Fage 9.2.1 Reactor Plant Service Water System 9.2-1 9.2.1.1 General 9.2-1 9.2.1.2 Design Bases 9.2-1 9.2.1.3 System Description 9.2-2 9.2.1.4 Safety Evaluat on 9.2-5 9.2.1.5 Test and Inspection Requirements 9.2-6a 9.2.1.6 Instrumentation Applications 9.2-7 9.2.3 Demineralized Water Makeup System 9.2-8 9.2.3.1 Design Bases 9.2-8 9.2.3.2 System Description 9.2-8 9.2.3.3 System Evaluation 9.2-8 9.2.3.4 Test and Inspection Requirements 9.2-8 9.2.3.5 Instrumentation Application 9.2-8 9.2.4 Potable and Sanitary Water System 9.2-8 9.2.4.1 Design Bases 9.2-8 9.2.4.2 System Description 9.2-8 9.2.4.3 Safety Evaluation 9.2-9 9.2.4.4 Test and Inspection Requirements 9.2-9 9.2.4.5 Instrumentation Application 9.2 6 9.2.5 Ultimate Heat Sink 9.2-9 9.2.5.1 General 9.2-9 9.2.5.2 Design Bases 9.2-9 9.2.5.3 System Description 9.2-10 9.2.5.4 Safety Evaluation 9.2-10 9.2.5.5 Test and Inspection Requirements 9.2-12 9.2.5.6 Instrumentation Applications 9.2-12 9.3.6 Loron Recovery System 9.3-1 9.3.6.3 Safety Evaluation 9.3-1 9.3.6.3.1 Comparison of Site Parameters with Design Basis Parameters 9.3-1 9.3.6.3.2 Potential Radiological Impact 9.3-1 9.3.6.3.3 Calculated Site hadiological Doses (For Information Only) 9.3-1 9.4.1 Control Room Air Conditioning, Heating, and Emergency Ventilation 9.4-1 9.4.1.1 Design Basis 9.4-1 9.4.1.2 System Description 9.4-1 9.4.1.3 Safety Evaluation 9.4-1 9.4.1.5 Instrument Applications 9.4-1 9x
KUP PSAR Amendment 20 HAVEN 2/79 CHAPTER 9 TABLE OF CONTENTS (CONT ' D)
Section Title Page 9.4.9 Service Water Pumphouse Ventilation 9.4-2 9.4.9.1 General 9.4-2 9.4.9.2 Design bases 9.4-2 9.4.9.3 System Description 9.4-2 9.4.9.4 Safety Evaluation 9.4-2 9.4.9.5 Test and Inspection Requirements 9.4-3 9.4.9.6 Instrumentation Applications 9.4-3 9.5.1 Fire Protection 9.5-1 9.5.1.1 Design Bases 9.5-1 9.5.1.2 System Description 9.5-1 9.5.1.3 Safety Evaluation 9.5-1 9.5.1.4 Tests and Inspection 9.5-1 9.5.1.5 Instrumentatior. Application 9.5-1 9-ii
WUP PSAR Amendment 19 3AVEN 11/78 CHAPTER 9 LIST OF TABLES Table Title 9.2.1-1 Service Water System Requirements (Estimated)
Per Unit 9.2.1-2 Cesnsequences of Component Failures, Service Water System 9.2.5-1 Two Unit Ultimate Heat Sink Flow Requirements (Estimated) 9.3.6-1 Boron Recovery System Failure Site Radiological Doses (For Information Only) 9-111
WUP PSAh An.endment 20 RAVEN 2/79 CHAPTER 9 LIST OF FIGURES Figure Title 9.2.1-1 Service kater System 9.2.1-2 Service Water System 9.2.1-3 Service Water System 9.2.1-4 Service Water Pumphouse 9.2.1-5 Containment Pre s mire Transient Pump Suction DER with Minimum ESF 9.2.3-1 Demineralized Water Makeup System 9.2.3-2 Demineralized Water Makeup System 9.2.3-3 Demineralized hater Lakeup System 9.2.5-1 Lake Michigan Intake 9.4.1-1 Control Building, Air Conditioning, Heating, and Emergency Ventilation 9.4.9-1 Pumphouse Ventilation 9-iv
WUP PSAR Amendment 20 HAVEN 2/79 9.4.1 Control Building Air Conditioning, Heating, and Emergency Ventilation 9.4.1.1 Design Basis In addition to the requirements of PSAR Section 9.4.1.1, the Haven site requires redundant QA and Seismic Category I chlorine detectors. These detectors are provided in the normal fresh air intake of the control room ventilation system to detect the ingress of chlorine. The detectors are shown on Figure 9.4.1-1.
9.4.1.2 System Description In the event chlorine is detected in the normal tresh air intake at a concentration greater than or equal to 5 ppm, automatic isolation of the air supply and initiation of the emergency filtration system in the recirculation mode occurs within 10 seconds after detection. A discussion of the consequences of a chlorine release near the site is provided in Section 2.2.3.1.3.
9.4.1.3 Safety Evaluation Chlorine detectors in the normal fresh air intake of the control room ventilation system will detect and alarm the presence of ch1crine in excess of 5 ppm. Isolation of the outside air supply and initiation of the emergency filtration system in the recirculation mode occurs automatically. Even without credit for chlorine removal via the emergency filtration system, the above actions provide adequate time for operators to don the self-contained portable breathing apparatus located in the control room. A discussion of the chlorine releases analyzed for the site is provided in Section 2.2.3.1.3.
9.4.1.5 Instrument Applications Under conditions of high ambient chlorine levels in the outside air, the chlorine detectors located in the control room normal fresh air intake initiate an alarm, isolate the normal ventilation air inlet, and place the emergency filtration systems in the recirculation mode of operation. In this operating mode, recirculated air passes through a filter train before entering the air conditioning units of the control, instrument rack, mechanical, and computer rooms.
Chlorine alarms are provided in the control room.
9.4-1
WUP-PSAR Amendment 20 HAVEN 2/79 9.4.9 Service Water Pumphouse Ventilation 9.4.9.1 General h e Haven service water pumphouse ventilation system fulfills all of the safety requirements of the system described in the PSAR.
However, the use of Lake Michigan as the ultimate heat nink rather than the spray ponds described in 9.2.5 of the PSAR, requires certain modifications. Therefore, the complete service water pumphouse ventilation system and requirements for the Haven site are described herein, and replace the description provided in 9.4.9 of the PSAR.
9.4.9.2 Design Bases The service water pumphouse ventilation system except for unit heaters is a safety-related system and Seismic Category I and is designed to maintain a controlled environment for personnel and equipment.
The sum:ner design temperature within the service water pumphouse is a maximum of 1030F when the outside air temperature is 920F, based on ASHRAE design temperature for 1 percent occurrence. The winter design temperature is a minimum of 6 00F, coincident with an outside temperature of -220F ano shutdown of the unit.
9.4.9.3 System Description he service water pumphouse ventilation system is shown on Figure 9.4.9-1.
Each half of the service water pumphouse is provided with a ventilation system consisting of two supply fans, two outside air supply dampers, two exhaust air dampers and associated ductwork.
In each half of the pumphouse, one of the fans and associated equipment arc powered from a Unit 1 power source while the other fan and associated equipment are powered from a Unit 2 power source. The power sources for both Unit 1 and 2 supply fans located in the same half of the pumphouse are of the same train designation. The service water pumps located in each half of the pumphouse are arranged simil arly (Section 9.2.1) .
We heating system for the service water pumphouse consists of two electric unit heaters in each half of the pumphonse that are individually controlled by room type temperature controllers.
9.4.9.4 Safety Evaluation The service water pumphouse ventilation system maintains an ambient temperature suitable for personnel and equipment. The temperature in the pumphouses is maintained between 1030F, maximum and 600F minimum to ensure the capability of post-accident operation of the required number of service water pumps under all conditions.
9.4-2
WUP-PSAR Amendment 20 HAVEN 2/79 Emergency power is supplied to each ventilation system supply fan and respective controls by the emergency bus supplying the service water pumps in the respective pumphouse.
The venH1ation system for the service water pumphouse is Safety Class 3, QA Category I and Seismic Category I.
9.4.9.5 Test and Inspection Requirements
'Ihe service water pumphouse ventilation system is inspected after installation to ensure that equipment has been properly installed. Following installation, the system is tested and air flow balanced.
The service water pumphouse ventilation system is normally in continuous operation. Routine surveillance and preventive maintenance are performed and eliminate the need for periodic tesH ng.
9.4.9.6 Instrumentation Applications A room temperature controller starts the Unit No. 1 supply fan when the temperature rises to 750F and stops the fan when the ten:perature f alls to 650F.
An additinnal temperature controller starts the Unit No. 2 supply fan when the temperature rises to 900F and stops the fan when the temperature falls to 800F.
The electric unit heaters are individually controlled by room-type temperature controllers. If the service water pumphouse ventilation system fails, a room temperature sensor detects high or low service water pumphouse ambient temperature and annunciates in the control room.
9.4-3
C FRCM FIG. 9 2.3-2
( W EAK C ATION B A 7 FROM FIG. 9.2.5 -
(STRONG CATION FRCM FIG. 9 2.3-2 (RINSE WATERS )
9 bD C FRCM FIG.9 2.3-2
( ANION BACKWASH G R AVITY FROM FIG. 9. 2.3 - 3 FILTER ,
FROM M AKEUP c MIXED e ---- L(MIXED BED B ACK SYSTEM BED FIG 10 412 - t _ RECYCLE
- @ o WASTE WATER
'o' :$ 3 RECOVERY TANK
& PUMP g._. "
GRAVITY , ,
FILTER o LCv FEED -
- TANK -
n
= }':
o TO D [e i r GRAVITY 1 r DILUTION FILTER WATER F IG. 9. 2.3 -3 o
29b +
o GRAVITY FILTER BACKWASH -
~
[ - FROM ONSITE AU XILI ARY hNo
~
!$WDOWN -X RALIZER F 1 G.10. 4. 9 - 3 FEED PUMPS c
ir CARBON FILTER BACKWASH OVERFLOW < ,3,i, FROM TO CIRCULATING WEAK WATER DISCHARGE _
CATlON FIG.10 4.12-2 /\ /\ CIRCULATING F I G. 9. 2.3 -2 WATER .
FILTER BACKWASH DISCH A RGE h,
- SUMP S PUMPS F I G. lO. 4.12 -2 LJ LJ l
t NOTE.
THIS SYSTEM IS NON NUCLEAR SAFETY
/\ /\ WA
- VENT TO ATMOSPHERE
M FIG. 9 2.3-2 EAK CATION BACKWASH)
OM FIG. 9.2.3 -2 RONG CATION B ACKWASH)
OM FIG. 9.2.3-2 NSE WATERS)
OM FIG 9 2.3-2 ION BACKWASH)
M FIG. 9.2.3-3 3
rp d h' XED BED BACKWASH / RINSE)
ATER Y TANK m CARBON FILTER b
- ,a .
' ' TO FIG. 9.2 3-2
~
"fD LFURIC 13 CARBON FILTER WJ " &
G. 9. 2.3 -3 ii g
- FROM CAUSTIC PUMPS FIG. 9.2 3-3
, FROM ACID PUMPS FIG. 9.2.3- 3 FROM FROM FROM K STRONG ON ANION MIXE0 BED CATION F I G. 9.2.5 - 2
.2.3 2 FIG. 9. 2.3 -2 FIG. 9. 2. 3 - 3 y o 1' '
t < p ,
WASTE net [kRALIZ ATION SUMPG PUMPS HAVEN NUCLEAR PLANT FIGURE 9.2.3-1 DEMINERALIZED WATER MAKEUP SYSTEM WISCONSIN UTILITIES PROJECT PRELIMINt.RY SAFETY ANALYSIS REPORT AMENDMENT 20 s .-
k_ 4
w .s r -SIS
) 1 A TA r---- 7 'l l
i +: l
[iHE 7 u_, o Y bAE/ V m b -
CDNTR ROOM EERGENCY F L V SM0KE S I S- '
ICABLETUNNEL !
+: '
[H M $- !!! [ h L___J EIH AUST IN AulillARY BUILDING EMERGM y-$g =
g e-SIS p______7____ ___q , ,
-*l SIS (DNTR R0OM EMERENCY l REFR. MACH. ' PIS I . lll /
I l
MECH. ROOM 3 I REFRIERATICH EAGINE I
vv.
/
' MECH. ROOM i i EMERGBCY SRIDEAR & ME SPMIM M EWUST FM l l l AIR (DNulTIONING LNiTS A2 EXHAUST FANS d i d i l I h
I
.. I T
- p r - 8'8
, Em. m -* l l ' i----------
gE F------+- ,s,, --4 h_3,3= D '
=
l :+
l --: ! 7-@PE e W' 3 o l m;l=1, l REFR. l MACH.
g REFRIGERATICN QINEl , , k6-% d i r--SIS "I
g y hTM
& l-MECH, ROOM MECH. ROOM T v EXHAUST FANS EER(BO SWITDMAR & CRE u g-------
l g
g f g d b SFHEADIE RDI AIR (D0lTICNIE LNITS & FANS j , j ,
i _:
l T = ry, ;
j l ,I ll r- SIS , ,
I
' " - SIS E N L__ ___._1 ____ _!
I '1 'i t
-h/ OIS EMERGENCY SilTCHGEAR g
j g i ,
THIS SYSTEM IS SAFETY CLASS 3 EXCEPT AS NOTED. G di r-M I
'T f hv _l_
'PIS IS USED TO START BACKUP UNIT. L._.J ,
r L_---__
2 2
(INTROL 1001 AIR
.. ID0lil0NIE LNITS
's : I p__ _____.T--- ---- T -- ----
T--
7 l l l l RDOM EERGENCY flLTER TRAIN l h I k l h f f g NECH. : CONTROL ROOM I COMPUTER ROOM 3 INSTRUMENT RACK l Hl e- ROOM i I '
ROOM i
,,,$gs f - - - - - - - - -l ' i h- KITCHEN i 8 l
g@ _. , l a
. t- ------ '
, l yTOILET '
r SIS Pl l I __ s k i i 3 '
.,- I l_ _______L___ ___ _ _L _ _ _ _ _ _ _I r-SI S
- l-- M Ji
,g NNS $ SC-3 r-'
R RWM EERGENCY FILTER TRAIN O M M
- - - -31 S
- * =
)
_ _ _ _ SIS S C-3 -**- NN S J i
_ v M M i(
i :
__ __ _ _ _ _ _ _ _ _ __ _ _ _ . l T - -- - - 7 -
15 c__________..,i+ ,
GENCf h.> BATTERY l
I CABLE I
I BATTERY R004 EXHAUST FANS
"~
CHGEAR -l SPREA0lhG l l SI,3
- PIS
_a_________&_a i i r' D "
_ _ _ _ _ _ . __ _ _ _ _ _ _ _ _ _ .L D._ _ _ _ _i
[
J k
h BATTERY 100M 15 @
___________.--T,* 7 rmS r-----------,' I =
l CABLE I ATTERY GENCY f____--=-_-- -j sFREADING g CHGEAR l BATTERY i 1 . ROOM HAVEN NUCLE AR PL ANT V Q-*
_ _ _ _ _- _-- - _ _i T -- -
g i
i l
g FIG. 9. 4.1-1 CONTROL BUILDING AIR CONDITIONING, i
,*~ HEATING,8 EMERGENCY VENTILATION l WISCONSIN UTILITIES PROJECT
-- _ __ ______ _ _ _ L _ _ _ __ _ _ __ _J PRELIMINARY SAFETY ANALYSIS REPORT 2
AMENDMENT 20
'. w..,w .- _ __ _
WUP PSAR Amendment 20 HAVEN 2/79 HAVEN SITE ADDENDUM LIST OF EFFECTIVE PAGES CHAPTER 10 Page, Table (T) or Revision Piqure (F) Number 10-1 thru iii 19 10.4-1 17 10.4-2 18 10.4-3 20 T10.4.8-1 (Delete Sheet) 17 F10.4.12-1 16 F10.4.12-2 20 F10.4.12-3 20 EP.10-1
WUP PSAR Amendment 20 HAVEN 2/79 onshore discharge structure. Butterfly valves (Figure 9.2.1-1) are provided to recirculate warm water within the screenwell during cold weather operation. Steam generator blowdown (Section 10.4.8) is also discharged to the blowdown system along with wastes from the sewage treatment, the makeup water treatment plant (Figure 9.2.3-1) , and turbine building drains (Figure 9.3.3-4) .
Screenwash water from the travelling water screens is intermittently discharged to the blowdown system after trash removal as shown on Figure 9.2.1-1.
Radioactive liquid wastes are treated in the liquid radioactive waste system (Section 11.2) . Depending on the results of radiochemical analysis and water inventory, distillate from the waste test tanks is either released to the blowdown system for dilution, or is recycled within the plant.
The condensate system (Section 10.4.7) may be drained to the blowdown system if necessary for maintenance of water inventory requirements.
Figure 10.4.12-3 provides the average expected flow rates and water use for both units during power operation.
10.4.12.4 Safety Evaluation A failure of these systems will not affect the integrity of any safety-related equipment. Monitoring of the effluent from the radioactive liquid waste system to the blowdown system is described in Section 11.6 of the PSAR.
10.4.12.5 Test and Inspection Requirements System components may be functionally tested during start-up and are in continual operation thereafter.
10.4.12.6 Instrumentation Applications Instrumentation is provided for the makeup and blowdown system to alert the operator in the event of component malfunction.
Makeup water pumps are provided with local discharge pressure gages. A discharge pressure switch actuates an alarm in the control room on low discharge pressure. Pump-status indication lights are provided in the control room. The pump motors are equipped with motor overload trips.
10.4-3
FROM CIRCULATING WATER SYSTEM UNIT 2 FIGURE 10.4.5-1 .
UNIT 1 '
FROM SERVICE WATER SYSTEM UNIT 2 FIGURE 9.2.1-1 l EMERGENCY RETURN ONSHORE DISCHARGE STRUCTURE
, , , , , r i
) 3 Fi G. 9. 2 .1 - 1 SERACE WATER PUMPHOUSE DISCHARGE BAY UNIT 1 FROM SERVICE o LANE F Gu E W ,"., M/CH/GAN FROM UNIT 1 L10 Ul0 R ADIOACTIVE '
WASTE SYSTEM j FIGUR E 11.2-4 UNIT 2
,l FROM UNIT 1 _
~
STEAM GENERATOR . 6 BLOWDOWN SYSTEM UNIT 2 FI G U R E 10.4.8 - 1 FROM SEWAGE TRE ATMENT SYSTEM L (UNIT I ONLY) i ROM TURBINE I r BLDG. SUMP UNIT 2 F IG U R E 9.3.3 -4 FROM WASTE NEUTR ALIZATION SUMP ;
(UNIT 1ONLY)
FIGURE 9. 2.3 -1 FROM ONSITE SETTLING POPO L NOTE: I THIS SYSTEM IS NON-NUCLEAR SAFETY (N NS) -
THE SERVICE WATER PUMPHOUSE DISCHARGE BAY IS SEISMIC CATEGORY I HAVEN NUCLEAR PLANT FIGURE 10.4.12 - 2 BLOWDOWN SYSTEM WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
FLOW RATE (Two Units) BYPASS GPM ITEM AVERAGE I. SERVICE WATER 22,200
- 2. MAKEUP FROM SERVICE WATER 22,200 SERVICE
- WATER 3 11.580 SYST EMS
- 3. MAKEUP WATER
- 4. COMBINED COOLING TOWER M AKEUP 33,600
- 5. COOLING TOWER BLOWDOWN I5,400
- 6. EVAPORATION AND DRIFT LOSSES I8 ,200
/ MAKEUP O WATER
- 7. SERVICE WATER BYPASS PUMPS
- 8. DEMINER ALIZED WATER M AKEUP 180
- 9. DEMINER ALIZED WATER 66 10 WATER FROM WELL 5('I I I. WELL WATER 303
- 12. POTABLE WATER US AGE 203
- 13. DEMINERALIZER REGENERATION 14U3 WASTE & SETTLING POND OVERFLOW
- 14. EVAPORATION AND MISC. LOSSES 3('I
- 15. RADIOACTIVE WASTE 603
- 16. STEAM GENERATOR BLOWDOWN I48 MAKEUP FROM WELL I ,' FLOOR AND EOUIPMENT 1203 LAKE MICHIGAN 9R AINAGE AND SAMPLE WASTE
- 18. SANITARY WASTE 2( U
- 19. TOTAL DISCHARGE I5.582(2)
TOTAL WITHDRAWAL FROM 33,785(33 LAKE AND WELL NOTES:
(1) INTERMITTENT FLOW EXPRESSED AS CONTINUOUS FLOW.
(2) DISCHARGE IS THE SUM OF STREAMS 5,13,15,16,17 & 18.
(3) TOTAL WATER USE IS THE SUM OF STREAMS 1,3 & 10.
SS '
- EVAPORATION AND DRIFT LOSSES
^
MAIN COOLING WATER SYSTEMS WASTE TREATMENT EVAPORATION AND MISCELLANECUS LOSSES a DEMINERALIZED RADIOACTIVE WASTE . RADWASTE
- PLANT USE SYSTEMS "
- MAKEUP WATER SYSTEMS AND HOLDUP STEAM GENERATOR BLOWDOWN
@ @ =
FLOOR AND EQUIPMENT OIL / WATER .
DRAINAGE AND SAMPLE SEPA R ATIO N WASTE
@ - DOMEST,c USE SEW,eE 8
WELL '
TREATMENT '
@ v DISCHARGE TO LAKE MICHGAN HAVEN NUCLEAR PLANT FIGURE 10.4.12 - 3 WATER USE DIAGRAM WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 2_O
WUP PSAR Arendment 20 11AVEN 2/79 HAVEN SITE ADDENDUM LIST OF EFFECTIVE PAGES CHAPTER 15 Page, Table (T) or Revision Fiqure (F) Number 15-1 19 15-11 20 15.1-1 and 2 18 T15-1 18 T15.2.17-1 18 T15.3.5-1 18 T15.4.1-1 and 2 18 T15.4.1-3 (Delete Sheet) 18 T15.4.1-4 20 T15.4.2-1 18 T15.4.3-1 18 T15.4.4-1 18 T15.4.5-1 18 T15.4.6-1 18 EP.15-1
WUP PSAR Amendment 19 HAVEN 11/78 CHAPTER 15 ACCIDENT ANALYSIS TABLE OF CONTENTS Section Title Page 15.1 Introduction 15.1-1 15.1.1 Comparison of Site Parameters with Design Basis Parameters 15.1-1 15.1.2 Potential Radiological Impact 15.1-2 15.2 Calculated Site Radiological Doses 15.1-2 15-i
WUP PSAR Amendment 20 HAVEN 2/79 CHAPTER 15 LIST OF TABLES Table Title 15-1 Comparison of Design Basis and Actual Site Parameters 15.2.17-1 Control Room Uninhabitability Assumptions and Doses 15.3.5-1 Charcoal Decay Bed Adsorber Line Rupture-Site Radiological Doses (For Information Only) 15.4.1-1 Major Loss of Coolant Accident-Site Radio-logical Doses (For Information Only) 15.4.1-2 Post-LOCA Normal Leakage - Unfiltered in the Recirculation Mode-Site Radiological Doses (For Information Only) 15.4.1-3 Deleted with Amendment 18 15.4.1-4 Purge Contribution to LOCA Dose l
15.4.2-1 Major Steam Line Rupture Accident-Site Radiological Doses (For Information Only) 15.4.3-1 Steam Generator Tube Rupture Accident-Site Radiological Doses (For Information Only) 14.4.4-1 Reactor Coolant Pump Locked Rotor Accident-Site Radiological Doses (For Information Only) 15.4.5-1 Fuel Handling Accident-Site Radiological Doses (For Information Only) 15.4.6-1 Rupture of a Control Rod Drive Mechanism Housing Accident-Site Radiological Doses (For Information Only) 15-ii
WUP PSAR Amendment 20 HAVEN 2/79 TABLE 15.4.1-4 PURGE CONTRIBUTION TO LOCA DOSE Incremental Site Specific Dose (1)
Type of Dose frem)
Exclusion Area (2 hr)
Thyroid 18.8 Whole Body Negligible NOTE:
(S)Calcul ted site specific doses are based on 12 months of onsite meteorological data.
1 of 1
WUP PSAR Amendment 18 HAVEN 9/22/78 GENERAL TABLE OF CONTENTS Section Title Volume
1.0 INTRODUCTION
AND GENERAL DESCRIPTION I OF PLANT
1.1 INTRODUCTION
I 1.2 GENERAL PLANT DESCRIPTION I 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS I 2.0 SITE CHARACTERISTICS I 2.1 GEOGRAPHY AND DEMOGRAPHY I 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND I MILITARY FACILITIES 2.3 METEOROLOGY I 2.4 HYDROLOGIC ENGINEERING II 2.5 GEOLOGY AND SEISMOLOGY II 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, II AND SYSTEMS 3.4 WATER LEVEL (FLOOD DESIGN) II 3.7 SEISMIC DESIGN II 3.8 DESIGN OF CATEGORY I STRUCTURES II 8.0 ELECTRIC POWER II 8.2 OFFSITE POWER SYSTEMS II 9.0 AUXILIARY SYSTEMS II 9.2.1 REACTOR PLANT SERVICE WATER SYSTEM II 9.2.3 DEMINERALIZED WATER MAKEUP SYSTEM II 9.2.4 POTABLE AND SANITARY WATER SYSTEM II 9.2.5 ULTIMATE HEAT SINK II 9.3.6 BORON RECOVERY SYSTEM II i
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT 'D)
Section Title Volume 9.4.1 AIR CONDITIONING, HEATING, COOLING, AND II VENTILATION SYSTEMS 9.4.9 SERVICE WATER PUMPHOUSE VENTILATION II 9.5.1 FIRE PROTECTION II 10.0 STEAM AND POWER CONVERSION SYSTEM II 10.4.8 STEAM GENERATOR BLOWDOWN SYSTEM II 10.4.12 MAKEUP AND BLOWDOWN SYSTEMS II 11.0 RADIOACTIVE WASTE MANAGEMENT II 11.2 RADIOACTIVE LIQUID WASTE SYSTEM II 11.3 RADIOACTIVE GASEOUS WASTE SYSTEM II 11.6 OFFSITE RADIOLOGICAL MONITORING PROGRAM II 13.0 CONDUCT OF OPERATIONS II 13.3 EMERGENCY PLANNING II 15.0 ACCIDENT ANALYSIS II
15.1 INTRODUCTION
II 15.2 CALCULATED SITE RADIOLOGICAL DOSES II APPENDICES TO SECTION 2 2A BORING IDGS III 2B BACKFILL EVALUATION STUDIES IV 2C REPORT, SEISMIC SURVEY, HAVEN NUCLEAR IV PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2D REPORT, SEISMIC SURVEY, LAKE MICHIGAN IV AREA, HAVEN SITE - SHEBOYGAN COUNTY, WISCONSIN UTILITIES PROJECT BATHYMETRY SURVEY - HAVEN SITE - 1978 ii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CON'I'ENTS (CONT'D)
Section Title Volume 2E REPORT, SEISMIC VEIDCITY AND ELASTIC IV MODULI MEASUREMENTS, HAVEN NUCLEAR PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2F REPORT - UNCONFINED COMPRESSION TESTS - IV HAVEN SITE (JUNE 1974)
REPORT ON ADDITIONAL UNCONFINED COMPRESSION TESTS - HAVEN SITE (MARCH 1978) 2G REPORT, SOILS LABORA'IORY TEST DATA, IN SITU IV SOILS, HAVEN NUCLEAR POWER PLANT, UNITS 1 AND 2 2H REPORT, RESONANT COLUMN TESTS, IV WEPCO HAVEN SITE 2I REPORT, CYCLIC TRIAXIAL TESTING, IV HAVEN BORROW SANDS, WISCONSIN ELECTRIC 2J REPORT, FAULTING IN THE ANNA, OHIO REGION IV 2K REPORT, SEISMIC RISK ANALYSIS, HAVEN SITE IV 2L REPORT, LABORATORY DYNAMIC TEST DATA, IV STRUCTURAL BACKFILL, HAVEN NUCLEAR PLANT, UNITS 1 AND 2 2M REPORT, GEOLOGY AND SEISMICITY UNDER IV LAKE MICHIGAN 2N BORING LOGS, HAVEN SITE IV NRC QUESTIONS AND RESPONSES V NRC LETTER 1/9/76 IAR310 ACCIDENT ANALYSIS V IAR324 FOUNDATION ENGINEERING V IIAR310 ACCIDENT ANALYSIS V IIAR321 HYDROLOGIC ENGINEERING V IIAR322 METEOROLOGY V iii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT ' D)
Section Title Volun e IIAR323 GEOLOGY AND SEISMOLOGY V IIAR324 FOUNDATION ENGINEERING V IIAR420 INDUSTRIAL SECURITY AND EMERGENCY PLANNING V 222.0 POWER SYSTEMS BRANCH V 312.0 ACCIDENT ANALYSIS BRANCH V 321.0 HYDROLOGY V 360.0 GEOLOGY / SEISMOLOGY V 361.0 GEOLOGY / SEISMOLOGY V 372.0 METEOROLOGY V 432.0 EMERGENCY PIJdINING BRANCH V iv
WUP PSAR Amendment 18 HAVEN 9/22/78 GENERAL TABLE OF CONTENTS Section Title Volume
1.0 INTRODUCTION
AND GENERAL DESCRIPTION I OF PLANT
1.1 INTRODUCTION
I 1.2 GENERAL PLANT DESCRIPTION I 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS I 2.0 SITE CHARACTERISTICS I 2.1 GEOGRAPHY AND DEMOGRAPHY I 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND I MILITARY FACILITIES 2.3 METEOROLOGY I 2.4 HYDROLOGIC ENGINEERING II 2.5 GEOLOGY AND SEISMOLOGY II 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, II AND SYSTEMS 3.4 WATER LEVEL (FLOOD DESIGN) II 3.7 SEISMIC DESIGN II 3.8 DESIGN OF CATEGORY I STRUCTURES II 8.0 ELECTRIC POWER II 8.2 OFFSITE POWER SYSTEMS II 9.0 AUXILIARY SYSTEMS II 9.2.1 REACTOR PLANT SERVICE WATER SYSTEM II 9.2.3 DEMINERALIZED WATER MAKEUP SYSTEM II 9.2.4 POTABLE AND SANITARY WATER SYSTEM II 9.2.5 ULTIMATE HEAT SINK II 9.3.6 BORON RECOVERY SYSTEM II i
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT 'D)
Section Title Volume 9.4.1 AIR CONDITIONING, HEATING, COOLING, AND II VENTILATION SYSTEMS 9.4.9 SERVICE WATER PUMPHOUSE VENTILATION II 9.5.1 FIRE PROTECTION II 10.0 STEAM AND POWER CONVERSION SYSTEM II 10.4.8 STEAM GENERATOR BLOWDOWN SYSTEM II 10.4.12 MAKEUP AND BLOWDOWN SYSTEMS II 11.0 RADIOACTIVE WASTE MANAGEMENT II 11.2 RADI0 ACTIVE LIQUID WASTE SYSTEM II 11.3 RADIOACTIVE GASEOUS WASTE SYSTEM II 11.6 OFFSITE RADIOIDGICAL MONITORING PROGRAM II 13.0 CONDUCT OF OPERATIONS II 13.3 EMERGENCY PLANNING II 15.0 ACCIDENT ANALYSIS II
15.1 INTRODUCTION
II 15.2 CALCULATED SITE RADIOLOGICAL DOSES II APPENDICES TO SECTION 2 2A BORING LOGS III 2B BACKFILL EVALUATION STUDIES IV 2C REPORT, SEISMIC SURVEY, HAVEN NUCLEAR IV PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2D REPORT, SEISMIC SURVEY, LAKE MICHIGAN IV AREA, HAVEN SITE - SHEBOYGAN COUNTY ,
WISCONSIN UTILITIES PROJECT BATHYMETRY SURVEY - HAVEN SITE - 1978 ii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT
- D)
Section Title Volume 2E REPORT, SEISMIC VEIOCITY AND ELASTIC IV MODULI MEASUREMENTS, HAVEN NUCLEAR PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2F REPORT - UNCONFINED COMPRESSION TESTS - IV HAVEN SITE (JUNE 1974)
REPORT ON ADDITIONAL UNCONFINED COMPRESSION TESTS - HAVEN SITE (MARCH 1978) 2G REPORT, SOILS LABORA'IORY TEST DATA, IN SITU IV SOILS, HAVEN NUCLEAR POWER PLANT, UNITS 1 AND 2 2H REPORT, RESONANT COLUMN TESTS, IV WEPCO HAVEN SITE 2I REPORT, CYCLIC TRIAXIAL TESTING, IV HAVEN BORROW SANDS, WISCONSIN ELECTRIC 2J REPORT, FAULTING IN THE ANNA, OHIO REGION IV 2K REPORT, SEISMIC RISK ANALYSIS, HAVEN SITE IV 2L REPORT, LABORATORY DYNAMIC TEST DATA, IV STRUCTURAL BACKFILL, HAVEN NUCLEAR PLANT, UNITS 1 AND 2 2M REPORT, GEOLOGY AND SEISMICITY UNDER IV LAKE MICHIGAN 2N BORING LOGS, HAVEN SITE IV NRC QUESTIONS AND RESPONSES V NRC LETTER 1/9/76 IAR310 ACCIDENT ANALYSIS V IAR324 FOUNDATION ENGINEERING V IIAR310 ACCIDENT ANALYSIS V IIAR321 HYDROLOGIC ENGINEERING V IIAR322 "ETEOROLOGY V iii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT ' D)
Section Title Volume IIAR323 GEOLOGY AND SEISMOLOGY V IIAR324 FOUNDATION ENGINEERING V IIAR420 INDUSTRIAL SECURITY AND EMERGENCY PLA';NING V 222.0 POWER SYSTEMS BRANCH V 312.0 ACCIDENT ANALYSIS BRANC*I 321.0 HYDROLOGY 360.0 GEOLOGY / SEISMOLOGY V 361.0 GEOLOGY / SEISMOLOGY V 372.0 METEOROLOGY V 432.0 EMERGENCY PLANNING BRANCH V iv
NUP PSAR Amendment 20 HAVEN 2/79 HAVEN SITE ADDDIDUM LIST OF EFFECTIVE PAGES APPENDIX 2D Page, Table (T) or Revision Fiqure (F) Ntmber Appendix 2D over S*?et 15 Letter 15 Title Page 15 Seismic Survey - Lake Michigan (6 pages) 15 Index of Drawings 15 F Seicmic Survey Drawings (8 sheets) 15 2D-1 and 2D-2 20 F2D-1 20 EP.2D-1
WUP PSAR Amendment 20 HAVEN 2/79 APPENDIX 2D BATHYMETRY SURVEY - HAVEN SITE - 1978 A bathymetric survey was conducted offshore of the Haven site on May 3, 1979 by NALCO Environmental Sciences. Twenty-one parallel transects oriented roughly perpendicular to the shore were run by a Soat equipped with a Raytheon DE-719B continuous recording fathometer. In addition to these transects with their uniform spacing of 100 m, four tie lines running parallel to the shoreline were also surveyed. The boat was positioned on the transects by a transit team on shore. The bottom was surveyed offshore to approximately the 40 ft contour and as near to shore as the boat draft permitted (usually to a 5 ft depth) .
Horizontal control was established with a Motorola Mini-Ranger Navigation System. A correlation between depth and location was made using an on-board digital clock. Horizontal coordinates and time were printed together on a printer at 1 second intervals. A time mark on the fathometer chart paper at 30 second intervals allowed for an accurate depth-location correlation.
The lake water level during the time of the survey was 579.59 ft mean sea level (msl) or 578.35 ft International Great Lakes Datum (IGLD) . The ~ f athometer readings were adjusted so that the bottom elevation (msl) , rather than the water depth on the day of the survey, provided the basis for the bathymetry map. Figure 2D-1 depicts the smoothed bottom contours at 2 ft intervals. It is derived from r more detailed map on which the bottom elevation values along the transects were marked and printed. Given the lake level for a particular day of interest, the water depth itself at a surveyed point can be directly computed by referring to these results. The approximate position of the shoreline was drawn in accordance with the location of 30 onshore transect markers (stakes) which were surveyed in to the waterline in early November 1977. On Figure 2D-1, those contours shoreward of the 574 ft contour are interpolated, because data points are, for the most part, missing in this region. The horizontal coordinate system and the vertical datum employed are the same as for the December 1973 bottom profiling survey.
A comparison of respective offshore profiles for 1973 and 1978 indicates erosion close to shore, deposition farther offshore, and some erosion again lakeward from there. The elevation changes do not exceed 3 fL at any point. Such variations cannot be solely interpreted as part of a long-term trend because of other mechanisms which may account for the difference. Seasonal influences favor such a profile change between December and May, i.e., offshore sediment transport dominating during the winter season and onshore transport restoring the profile during summer.
In addition, instrumentation error and the accuracy of horizontal positioning in the two surveys may have contributed to the 2D-1
WUP PSAR Amendment 20 HAVEN 2/79 observed differences. The bathymetry results for 1973 and 1978 do show that the overall contour pattern has not markedly changed over this period.
Y v
O O
\\ v ' '
..E, o) fa
- $',(m;)(4q-1 s ,
e O,/of o9
- rwks,wp),)e y
'm
- E::::
= = =: = =P
"^ERE2SE#""'#"'
o
"^"?"
s s "sTa^" "
PRELIMINARY SAFETY ANALYSIS REPORT AMENDMENT 20
WUP PSAR Amendment 18 HAVEN 9/22/78 GENERAL TABLE OF CONTENTS Section Title Volume
1.0 INTRODUCTION
AND GENERAL DESCRIPTION I OF PLANT
1.1 INTRODUCTION
I 1.2 GENERAL PLANT DESCRIPTION I 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS I 2.0 SITE CHARACTERISTICS I 2.1 GEOGRAPHY AND DEMOGRAPHY I 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND I MILITARY FACILITIES 2.3 METEOROLOGY I 2.4 HYDROLOGIC ENGINEERING II 2.5 GEOLOGY AND SEISMOLOGY II 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, II AND SYSTEMS 3.4 WATER LEVEL (FLOOD DESIGN) II 3.7 SEISMIC DESIGN II 3.8 DESIGN OF CATEGORY I STRUCTURES II 8.0 ELECTRIC POWER II 8.2 OFFSITE POWER SYSTEMS II 9.0 AUXILIARY SYSTEMS II 9.2.1 REACTOR PLANT SERVICE WATER SYSTEM II 9.2.3 DEMINERALIZED WATER MAKEUP SYSTEM II 9.2.4 POTABLE AND SANITARY WATER SYSTEM II 9.2.5 ULTIMATE HEAT SINK II 9.3.6 BORON RECOVERY SYSTEM II i
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT 'D)
Section Title Volume 9.4.1 AIR CONDITIONING, HEATING, COOLING, AND II VENTILATION SYSTEMS 9.4.9 SERVICE WATER PUMPHOUSE VENTILATION II 9.5.1 FIRE PROTECTION II 10.0 STEAM AND POWER CONVERSION SYSTEM II 10.4.8 STEAM GENERATOR BLOWDOWN SYSTEM II 10.4.12 MAKEUP AND BLOWDOWN SYSTEMS II 11.0 RADIOACTIVE WASTE MANAGEMENT II 11.2 RADIOACTIVE LIQUID WASTE SYSTEM II 11.3 RADIOACTIVE GASEOUS WASTE SYSTEM II 11.6 OFFSITE RADIOIDGICAL MONITORING PROGRAM II 13.0 CONDUCT OF OPERATIONS II 13.3 EMERGENCY PLANNING II 15.0 ACCIDENT ANALYSIS II
15.1 INTRODUCTION
II 15.2 CALCULATED SITE RADIOLOGICAL DOSES II APPENDICES TO SECTION 2 2A BORING LOGS III 2B BACKFILL EVALUATION STUDIES IV 2C REPORT, SEISMIC SURVEY, HAVEN NUCLEAR IV PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2D REPORT, SEISMIC SURVEY, LAKE MICHIGAN IV AREA, HAVEN SITE - SHEBOYGAN COUNTY ,
WISCONSIN UTILITIES PROJECT BATHYMETRY SURVEY - HAVEN SITE - 1978 ii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT 'D)
Section Title Volume 2E REPORT, SEISMIC VEIDCITY AND ELASTIC IV MODULI MEASUREMENTS, HAVEN NUCLEAR PLANT SITE, SHEBOYGAN COUNTY, WISCONSIN 2F REPORT - UNCONFINED COMPRESSION TESTS - IV HAVEN SITE (JUNE 1974)
REPORT ON ADDITIONAL UNCONFINED COMPRESSION TESTS - HAVEN SITE (MARCH 1978) 2G REPORT, SOILS LABORA'IORY TEST DATA, IN SITU IV SOILS, HAVEN NUCLEAR POWER PLANT, UNITS 1 AND 2 2H REPORT, RESONANT COLUMN TESTS, IV WEPCO HAVEN SITE 2I REPORT, CYCLIC TRIAXIAL TESTING, IV HAVEN BORROW SANDS, WISCONSIN ELECTRIC 2J REPORT, FAULTING IN THE ANNA, OHIO REGION IV 2K REPORT, SEISMIC RISK ANALYSIS, HAVEN SITE IV 2L REPORT, LABORATORY DYNAMIC TEST DATA, IV STRUCTURAL BACKFILL, HAVEN NUCLEAR PLANT, UNITS 1 AND 2 2M REPORT, GEOLOGY AND SEISMICITY UNDER IV LAKE MICHIGAN 2N BORING LOGS, HAVEN SITE IV NRC QUESTIONS AND RESPONSES V NRC LETTER 1/9/76 IAR310 ACCIDENT ANALYSIS V IAR324 FOUNDATION ENGINEERING V IIAR310 ACCIDENT ANALYSIS V IIAR321 HYDROLOGIC ENGINEERING V IIAR322 METEOROLOGY V iii
WUP PSAR Amendment 20 HAVEN 2/79 GENERAL TABLE OF CONTENTS (CONT 'D)
Section Title Volume IIAR323 GEOLOGY AND SEISMOLOGY V IIAR324 FOUNDATION ENGINEERING V IIAR420 INDUSTRIAL SECURITY AND EMERGENCY PLANNING V 222.0 POWER SYSTEMS BRANCH V 312.0 ACCIDENT ANALYSIS BRANCH V 321.0 HYDROLOGY V 360.0 GEOLOGY / SEISMOLOGY V 361.0 GEOLOGY / SEISMOLOGY V 372.0 METEOROLOGY V 432.0 EMERGENCY PLANNING BRANCH V iv
KUP PSAR An.endment 20 IIAVEN 2/79 HAVEN SITE ADDENDUM LIST OF EFFECTIVE PAGES NRC OUESTIONS AND RESPONSES Page, Tanle (T) or Revision Page, Table (T) or Revision Figure (F) Number Figure (F) Number Q-i 17 II AR322.27-1 16 Q-ii and lii 18 II AR323.1-1 16 Q-iv and v 19 II AR323.2-1 16 0-vi 20 II AR323.3-1 18 NRC Letter 1/9/76 II Ak323.4-1 18 II AR324.1-1 15 I AR310.1-1 and 2 15 II AR324.2-1 18 I AR310.2-1 16 II AR420.1-1 15 I AR310.3-1 15 I AR310.4-1 15 Q222.4-1 19 I AR324.1-1 18 Q222.5-1 19 I AR324.2-1 18 Q312.3-1 and 2 19 I AR324.3-1 18 0312.4-1 19 I AR324.4-1 18 Q312.5-1 19 I AR324.5-1 18 Q312.6-1 20 I AR324.6-1 18 Q312.7-1 19 I Ak324.7-1 18 Q312.8-1 20 I AR324.8-1 18 Q321 1-1 19 I AR324.9-1 18 Q321.2-1 19 I; ,k310.5-1 16 Q360.1-1 19 II AR32?.1-1 16 0360.2-1 19 II AR321.2-1 16 Q360.3-1 19 II AR321.3-1 16 Q360.4-1 19 II AR321.4-1 15 0360.5-1 19 F II AR321.4-1 15 Q360.6-1 and 2 19 II AR321.5-1 18 F0360.6-1 19 T Q321.5-1 and 2 Q360.7-1 20 (Delete Sheet) 18 Q360.8-1 20 II AR321.6-1 15 Q360.9-1 20 II AR321.7-1 15 9360.10 1 20 II AR322.1-1 15 0360.11-1 20 II AR322.2-1 16 Q360.12-1 20 II AR322.3-1 15 0360.13-1 20 II AR322.4-1 15 Q360.14-1 20 II AR322.5-1 15 Q360.15-1 20 II AR322.6-1 15 Q360.16-1 20 II AR322.7-1 18 9360.17-1 and 2 20 II AR322.8-1 15 TQ360.17-1 20 II AR322.9-1 15 F0360.17-1 20 II AR322.10-1 15 Q360.18-1 20 II AR322.11-1 15 Brazee Attenuation II AR322.12-1 16 Relationship (20 pages) 19 II AR322.13-1 15 Howell & Schultz II AR322.14-1 15 Attenuation Relationship II AR322.15-1 18 (21 pages) 19 II AR322.16-1 15 Nuttli Attenuation II AR322.17-1 15 Relationship (42 pages) 19 II AR322.18-1 15 Q361.1-1 and 2 19 II AR322.19-1 15 Q361.2-1 19 II AR322.20-1 15 Q361.3-1 19 II AR322.21-1 15 Q361.4-1 19 II AR322.22-1 15 Q361.5-1 19 II AR322.23-1 15 Q361.6-1 19 II AR322.24-1 15 Q361.7-1 19 II AR322.25-1 15 Q361.8-1 thru 3 19 II AR322.26-1 15 Q361.9-1 19 EP.Q-1
WUP PSAR Arendment 20 HAVEN 2/79 HAVEN SITE ADDENDUM LIST OF EFFECTIVE PAGES (CONT ' D)
NRC QUESTIONS AND RESPONSES Page, Table (T) or Revision Figure (F) Number Q361.10-1 20 Q361.11-1 19 Q361.12-1 19 Q372.1-1 and 2 19 Q372.2-1 19 Q372.3-1 19 Q372.4-1 thru 3 19 Q372.5-1 19 Q432.1-1 19 EP.Q-2
WUP PSAR Amendment 19 HAVEN 11/78 Question No. Subiect Puye 361.3 (2.5) Shoreline Erosion Q3(1.3-1 361.4 (2.5) Integrity of Underlying Q361.4-1 Limestone and Dolomite 361.5(2.5) Saunders and Hicks Q361.5-1 Lineaments 361.6 (2.5) Topographic,. Geologic, and Q361.6-1 Lineament Maps 361.7 (2.5) Geology and Geophysics of Q361.7-1 Lake Michigan 361.8 (2.5) Ostrom and Hough Q3 61. 8 -1 Communications 361.9 (2.5) Site Area Lineaments Q361.9-1 361.10 (2.5) Structural Contours Q361.10-1 361.11 (2.5) Aeromagnetic and Gravity Q361.11-1 Data 361.12 (2.5) Age of Regional Faults Q361.12-1 372.0 METEOROIDGY 372.1 (2.3.1) Design Wind Speed Q372.1-1 372.2 (' .3.3) Meteorological Monitoring Q372.2-1 Program 372.3 (2.3.3) Meteorological Equations Q372.3-1 372.4 (2.3.4) Short-Term Dif fusion Q372.4-1 Estimates 372.5 (2.3.3-4) Onsite Meteorological Tower Q372.5-1 432.0 EMERGENCY PLANNING BRANCH 432.1 (13.3) Section 13.3 Q432.1-1 NRC Letter Dated 8/13/78 Haven Site Addendum (SA) Preliminary Saf ety Analysis Report 312.0 ACCIDENT ANALYSIS BRANCH 312.3 (2.1) Exclusion Area control Q312.3-1 Q-v
WUP PSAR Amendment 20 HAVEN 2/79 Qpestion No. Subiect Page 312.4 (2.1) Population Center Distance Q312.4-1 312.5 (2.2) Propane Truck Accident Q312.5-1 312.6 (2.2) Toxic Chemical Rail Accident Q312.6-1 312.7 (2.2) Liquid Fuel Rail Accident Q312.7-1 312.8 (2.2) Airspace Operations Q312.8-1 321.0 HYDROLOGY 321.1 (2.4) Wave Runup Q321.1-1 321.2 (2.4.5) Probable Maximum Windstorm Q321.2-1 NRC Letter Dated 10/24/78 Haven Site Addendum (SA) Preliminary Safety Analys.ia Reoort 360.0 GEOLOGY AND SEISMOLOGY 360.7 (App 21'S Gravity Data Q360.7-1 360.8 (App 2M) Location of Faults Q360.8-1 360.9 (App 2M) Location of Faults Q360.9-1 360.10 (App 2M) Ages of Rock Q360.10-1 360.11 (App 2M) Reflection Records 0360.11-1 360.12 (App 2M) Fault Direction Q360.12-1 360.13 (App 2M) Bathymetric Chart Q360.13-1 360.14 (App 2M) Salt Collapse Q360.14-1 360.15 (App 2M) Correlation of or with om Q360.15-1 360.16 (App 2M) Pleistocene River Channel Q360.16-1 360.17 (App 2M) Seismic Detection Q360.17-1 Table 360.17-1 Magnitude Theshold Figure 360.17-1 360.18 (App 2M) Sources of Faulting Q360.18-1 Q-vi
WUP PSAR Amendment 20 HAVEN 2/79 OUESTION 312.6 (2.2)
It is stated that the frequency and size of the shipments of toxic chemicals on the Chicago and Northwestern Railroad, 4,200 feet from the control room air intakes, will be requested from the railroad. Discuss the status of your request and, if such information has not been obtained, postulate an accident involving the toxic chemicals listed in Regulatory Guide 1.78 and demonstrate that the control room operators are adequately protected. Show calculations.
RESPONSE
Sections 2.2.3.1.3 and 9.4.1 of the Site Addendum have been updated to reflect the Chicago and Northwestern Railroad hazardous chemical information. Calculation techniques are also provided in Section 2.2.3.1.3 of the Site Addendum.
Q312.6-1
WUP PSAR Amendment 20 HAVEN 2/79 QUESTION 312.8 (2.2)
Evaluate the potential hazards to the plant associated with all types of civilian and military airspace operations which are taking place or are expected to take place during the operating lifetime of the plant.
RESPONSE
The response to this question is prc'rided in Section 2.2. l Q312.8-1
WUP PSAR Amendment 20 EAVEN 2/79 QUESTION 360.7 (App 2M)
Provide a gravity map and interpretation of the gravity data for Lake Michigan.
RESPONSE
The response to this question will be provided in a future amendment.
Q360.7-1
WUP PSAR Amendment 20 HAVEN 2/79 OUESTION 360.8(App 2M)
Modify the following figures in Appendix 2M to reflect the following:
(1) 2M-3 Include the fault which exists 5 miles southeast of the Haven Site; (2) 2M-6 Include fault F on geologic cross Section BB; (3) 2M-7 Include the fault which exists 5 miles southeast of the Haven Site on geologic cross Section CC; (4) 2M-8 Include faults L, M, and N on geologic cross Section DD; (5) 2M-10 Include the location of faults C through N; (6) 2M-12 Label the geologic contacts and longitude lines on the profiles; and (7) 2M-13 Label the geologic contacts and longitude lines on the profiles. Label the fault and identify the reflection line on the figure.
RESPONSE
The response to this question will be provided in a future amendment.
Q360.8-1
WUP PSAR Amendment 20 HAVEN 2/79 OUESTION 360.9 (App 2M)
Provide a figure which shows both the faults on seismic profiles and the regional faults shown in Figure 2.5.1-9B of the PSAR.
Discuss the possible continuation of the faults under Lake Michigan into Wisconsin and Michigan.
RESPONSE
The response to this question will be provided in a future amendment.
Q360.9-1
NUP PSAR Amendment 20 HAVEN 2/79 OUESTION 360.10 (App 2M)
Discuss the ages of the rock units offset by the faults seen on the seismic reflection records. Discuss the age of the oldest rock units penetrated by the shallow versus the deep reflection records.
RESPONSE
The response to this question will be provided in a future amendment.
Q360.10-1
WUP PSAR Amendment 20 HAVEN 2/79
[UESTION 360.11 (App 2M)
Provide full size copies of:
(1) Univer.aity of Wisconsin shallow reflection lines 12 through 17; (2) Grant Geophysical deep reflection lines D.O. 17, 18, 19, 23, 25, and 30:
(3) Illinois Geological Survey high resolution seismic lines; and (4) Weston Geophysical Company's reflection record which shows the fault which exists 5 miles southeast of the Haven Site.
RESPONSE
Full size copies of this information were provided to the NRC by letter to Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation, dated December 8, 1978.
Q360.11-1
WUP PSAR Amendment 20 HAVEN 2/79 OUESTION 360.12 (App 2M)
Provide further discussion of the arguments for connecting faults G, H and C. Are there any geologic structures on the shores of Lake Michigan with a similar northeast tread? Provide a regional geological analysis to support the assumption that all the faults in Lake Michigan strike the same dis.ection.
RESPONSE
The response to this question will be provided in a future amendment.
Q360.12-1
WUP PSAR Amendment 20 HAVEN 2/79 CU"STION 360.13 (App 2M)
Provide a full scale bathymetric chart of Lake Michigan.
RESPONSE
A full size copy of this information was provided to the NRC by letter to Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation, dated December 8, 1978.
Q360.13-1
WUP PSAR Amendment 20 HAVEN 2/79 OUESTION 360.14 (App 2M)
Show on the cross sections where the breccia related to possible salt collapse occurs. Discuss in detail the relationship of the apparent zone of salt collapse and the irregular bottom north of 44010*N, which is assumed to be due to differential erosion of breccias caused by salt collapse.
RESPONSE
The response to this question will be provided in a future amendment.
Q360.14-1
WUP PSAR Amendment 20 HAVEN 2/79 CUESTION 360.15 (App 2M)
What is the basis for correlation of Or (Richmond Group-Michigan) with Om (Maquoketa Group-Wisconsin) ?
RESPONSE
The Michigan Geological Survey lists the Richmond Group ('O r) as Cincinnatian and the Wisconsin Geological Survey lists the Maquoketa Group (iOm) as Cincinnatian. The shale and dolomite of the Maquoketa contain upper Ordovician (Cincinnatian) tauna and is essentially Richmond age (1). Therefore, the Richmond Group (Michigan) and the Maquoketa Group (Wisconsin) are time equivalents and correlatable.
Reference:
(1) Prouty, C.E. Lower Paleozoic and Pleistocentic Stratigraphy across Central Wisconsin. Annual Field Excursion, Michigan Basin Geological Society, May 1960.
Q360.15-1
WUP PSAR Amendment 20 HAVEN 2/79 QUESTION 360.16 Spp 2M)
If a Pleistocene river channel is responsible for the fault-like conditions observed on linss 13, 1f4 and 15 and D.O. 25, why isn't the channel apparent on lines 12 and 16?
RESPONSE
The response to this question will be provided in a future amendment.
Q360.16-1
WUP PSAR Amendment 20 HAVEN 2/79 QUESTION 360.17 (App 2M)
Provide an estimate of the seismic detection magnitude threshold for Lake Michigan given the current seismic monitoring around the Lake. In this regard, it should also be noted that the microearthquakes recorded at the Milwaukee station could have originated in northeastern Lake Michigan.
RESPONSE
The magnitude of an earthquake occurring in eastern North America is determined from the following formulas developed by Nuttli(1):
m = 3.75 + 0.90 (logo) + log A/T 0.50 $o6 40 m = 3.30 + 1.66 (logo) + log A/T 40 $o5 300 b
where:
a is the distance from earthquake to seismograph station in degrees, A is zero to peak ground motion in microns, and T is the period of the wave.
These formulas can be applied to various seismographic stations operating in the central United States and Canada to determine the seismic detection magnitude threshold for Lake Michigan.
Figure Q360.17-1 shows the distribution of seismographic stations located in the central United States and Canada that will detect earthquake activity in Lake Michigan. Assuming that a minimum zero to peak amplitude of 2 mm on the seismogram enables distinction to be made between the earthquake signal anc background noise, and measuring the peak amplitude at a 1 second period, the equations for magnitude computation become:
m = 3.75 + 0.90 (logo) + log 2x103 0.50 $o6 40 b M mb = 3.30 + 1.66 (logo) + log 2x103 40 5a5 300 M
where M is the magnification of short period instruments at various stations. Table Q360.17-1 lists the magnifications of the short period instruments at the seismographic stations shown on Figure Q360.17-1 at a period of I second. It also lists the distances f rom the seismographic station up to which earthquakes of various magnitudes would be recorded as determined from the above equations. These distances are plotted on Figure Q360.17-1 for magnitude 3.0, and for magnitude 2.0 where the calculated Q360.17-1
WUP PSAR Amendment 20 HAVEN 2/79 distance is within the range of accuracy of the equations. This figure shows that earthquakes with magnitude 2 3.0 woula be recorded by most of the stations in the central United States, ensuring epicentral determination based on instrumental records.
For example, earthquakes with magnitude 1 3.0 in central and southern Lake Michigan would be detected by Bloomington, the Vincennes array, and probably by Minneapolis, Kalamazoo, and the Anna, Ohio array near Sidney, Ohio. Earthquakes with magnitude 2 3.0 in northern Lake Michigan would be recorded by Thunder Bay, the Vincennes array, and probably by Minneapolis. A network of short period instruments is being installed near Houghton, Michigan which will further improve the detection capability for northern Lake Michigan. Two seismographic stations at Chicago and Dubuque are also favorably situated for detecting earthquakes in southern and central Lake Michigan, but since the instruments at these stations are not calibrated, detection distances for magnitudes 2.0 and 3.0 cannot be determined.
An earthquake of magnitude 3.7 in northern Illinois on September 15, 1972 was located instrumentally. An earthquake of magnitude 2.9 near Chicago on November 18, 1977 was detected by the Minneapolis station and the micro-earthquake network array established near Vincennes, Indiana. The onset of arrival times.
on this array was used ta determine the location of this ea rthquake . This array is capable of locating earthquakes in Lake Michigan with magnitude 2 2.5.
It can be concluded that earthquakes of magnitude 2 3.0 in Lake Michigan would be detected by a sufficient number of stations to ensure epicentral determination. Additionally, the high oain micro-earthquake array located near Vincennes is capable of detecting earthquakes of magnitude 2 2.5 in Lake Michigan.
REFERENCE:
- 1. Nuttli, O.W. Seismic Wave Attenuation and Magnitude Relations for Eastern North America. Journal of Geophysical Research, Vol. 78, 1973, p 876-885.
Q360.17-2
WUP PSAR Amendment 20 HAVEN 2/79 TABLJ 0360.17-1 EARTHOUAKE MAGNITUDE DETECTION CAPABILITY OF SHORT PERIOD INSTRUMENTS AT VARIOUS SEISMOGRAPHIC STATIONS Magnification Distance from Seismographic Station Seismograph of Short up to which Earthquakes of Various Station Period Magnitudes Are Recorded Location Instruments (km) 2.0 3.0 4.0 Ann Arbor 18,000
- 185 1050 Blacksburg 100,000 100 750 3000 Bloomington 60,000 55 550 2200 Kalamazoo 17,000
- 175 1050 Milwaukee 5,900
- 55 550 Minneapolis 60,000 55 550 2200 St. Louis 25,000
- 275 1300 Sidney 30,000
- 335 1450 Thunder Bay 42,500
- 450 1800 Vincennes 160,000 165 985
- NOTE:
- Indicates calculated distances not within range of accuracy of equations 1 of 1
,v w n: tis-3 CW
\
\ ~~f h k
[ -
N
\_ vl v UEws.3 x .
T A Tu:a \
/u v a WISCONSIN [ k
/
NJ* } Bta neca: 3 f
~
M.nneapoi.s* -
, [\
""**5 w wow pA s { , ,
(SITE MINNESOTA > / 7 (sm-umrp ( T$ /
Milmoukee" / ,#
Ann Arb,or
"~~
lOWA Kalamazoo 2 [
/___ _
3
- ::v m:o3s' Lt t:US-!., I
\ ,-
' iN D1 A N A ' sidney
~~ '
' -s axu v.t: O H IO I
_2 ILLINOIS / f- 4T2 ;
/
/ W E/S T
"" 5 -2'/ *
}\ Q VIR GINI A I ,
s/ \ , ~
St Louis . { Vincer s /
I \ / / * \
M i S SOURI \N g ocx,3u,g )
KENT UCKY k' "83-\
,Q '
_ '. ., ~ ~_~
/ _ -/-
O 50 10 0 200 250 t ! ! 1 I SC AL E M LES
? .
i Y,Y SCALE KILOMETERS LEGEND
'S oa., sEISMOGR APH!C STATIO N p
['yBlocksburg 2 R ANGE OF DETECTICN FOR FIGURE Q 360.17-1
(/ MAGNITUCE 2 EARTHQUAnE DETECTION CAPABILITIES OF RANGE Or CETECTION FOR SEISM 0 GRAPHIC STATIONS IN OSidm-3 M AGNITUCE 3 EARTHQUAKE THE CENTRAL UNITED STATES WISCONSIN UTILITIES PROJECT PRELIMINARY SAFETY ANALYSIS REPORT AMENCMENT 20
WUP PSAR Amendment 20 HAVEN 2/~19 OUESTION 360.18 (App 2M)
Discuss in detail the following as possible sources of faulting in Lake Michigan:
(1) Reactivation of Precambrian faults (consider any f aults inferred from the aeromagnetic or gravity studies and their relationships to the faults found on the seismic reflection records) ;
(2) Solution of the salt formations and associated collapse of the overlying formations; (3) Crustal rebound following Pleistocene glaciation; and (4) Channel fill which appears as faulting on the seismic reflection records.
RESPONSE
The response to this question will be provided in a future amendment.
Q360.18-1
WUP PSAR Amendment 20
!!AVEN 2/79 OUESTION 361.10 (2. 5)
Provide the following information with regard tu Figures 2.5.1-9E Structure Contour Top of the St. Peter and 2.5.1-9D Structure Contours Top of the Maquoeta Formation:
a) Modify Figures 2.5.1-9D and 9E to include the borehole locations and depth to top of the respective formation.
b) Extend Figure 2.5.1-9D to the south to include the Milwaukee area.
c) On page 2.5-25, the PSAR states that "a portion of the structural contour map of the top of the St. Peter Sandstone is shown on Figure 2.5.1-9E." Provide the complete structural contour map of the top of the St.
Peter Sandstone.
d) Provide the structural contouring on top of the Trempeleau Group. Include on this the borehole locations and depth to the contact with the top of the Trempeleau Group.
RESPONSE: .
The response to this question is provided on Figures 2.5.1-9D, 9E, 9F, and 9G and Section 2.5.1.1.3 of this Site Addendum.
Q361.10-1
- - - . . - . . . . . . . . . . . . . .